§ 285.626 - What must I include in my COP?  


Latest version.
  • (a) You must submit the results of the following surveys for the proposed site(s) of your facility(ies). Your COP must include the following information:

    ER29AP09.119 ER29AP09.120

    (b) Your COP must include the following project-specific information, as applicable.

    ER29AP09.121 ER29AP09.122