Part 780 - Surface Mining Permit Applications - Minimum Requirement for Reclamation and Operation Plan  


§ 780.1 - Scope.
§ 780.2 - Objectives.
§ 780.4 - Responsibilities.
§ 780.10 - Information collection.
§ 780.11 - Operation plan: General requirements.
§ 780.12 - Operation plan: Existing structures.
§ 780.13 - Operation plan: Blasting.
§ 780.14 - Operation plan: Maps and plans.
§ 780.15 - Air pollution control plan.
§ 780.16 - Fish and wildlife information.
§ 780.18 - Reclamation plan: General requirements.
§ 780.19 - What baseline information on hydrology, geology, and aquatic biology must I provide?
§ 780.20 - How must I prepare the determination of the probable hydrologic consequences of my proposed operation (PHC determination)?
§ 780.21 - Hydrologic information.
§ 780.22 - Geologic information.
§ 780.23 - Reclamation plan: Land use information.
§ 780.24 - What requirements apply to the postmining land use?
§ 780.25 - Reclamation plan: Siltation structures, impoundments, banks, dams, and embankments.
§ 780.26 - What special requirements apply to surface mining near underground mining?
§ 780.27 - Reclamation plan: Surface mining near underground mining.
§ 780.28 - [Reserved]
§ 780.29 - Diversions.
§ 780.31 - Protection of publicly owned parks and historic places.
§ 780.33 - Relocation or use of public roads.
§ 780.35 - Disposal of excess spoil.
§ 780.37 - Road systems.
§ 780.38 - Support facilities.
§§ 780.17--780.18 - [Reserved]