§ 780.14 - Operation plan: Maps and plans.  


Latest version.
  • § 780.14 What requirements apply to the use of existing structures?

    (a) Each application must contain a description of every existing structure that you propose to use in connection with or to facilitate surface coal mining and reclamation operations. The description must include -

    (1) The location of the structure.

    (2) Plans of the structure.

    (3) A description of the current condition of the structure.

    (4) The approximate dates when the structure was originally built.

    (5) A showing, including relevant monitoring data or other evidence, of whether the structure meets the permanent program performance standards of subchapter K of this chapter or, if the structure does not meet the performance standards of subchapter K of this chapter, a showing of whether the structure meets the initial program performance standards of subchapter B of this chapter.

    (b) Each application must contain a compliance plan for every existing structure that you propose to modify or reconstruct for use in connection with or to facilitate surface coal mining and reclamation operations. The compliance plan must include -

    (1) Design specifications for the modification or reconstruction of the structure to meet the design and performance standards of subchapter K of this chapter.

    (2) A schedule for the initiation and completion of any modification or reconstruction under paragraph (b)(1) of this section.

    (3) Provisions for monitoring the structure during and after modification or reconstruction to ensure that the performance standards of subchapter K of this chapter are met.

    (4) A demonstration that there is no significant risk of harm to the environment or to public health or safety during modification or reconstruction of the structure.

    Operation plan: Maps and plans.

    Each application shall contain maps and plans as follows:

    (a) The maps and plans shall show the lands proposed to be affected throughout the operation and any change in a facility or feature to be caused by the proposed operations, if the facility or feature was shown under 30 CFR 779.24 through 779.25.

    (b) The following shall be shown for the proposed permit area:

    (1) Buildings, utility corridors and facilities to be used;

    (2) The area of land to be affected within the proposed permit area, according to the sequence of mining and reclamation;

    (3) Each area of land for which a performance bond or other equivalent guarantee will be posted under subchapter J of this chapter;

    (4) Each coal storage, cleaning and loading area;

    (5) Each topsoil, spoil, coal waste, and non-coal waste storage area;

    (6) Each water diversion, collection, conveyance, treatment, storage, and discharge facility to be used;

    (7) Each air pollution collection and control facility;

    (8) Each source of waste and each waste disposal facility relating to coal processing or pollution control;

    (9) Each facility to be used to protect and enhance fish and wildlife and related environmental values;

    (10) Each explosive storage and handling facility; and

    (11) Location of each sedimentation pond, permanent water impoundment, coal processing waste bank, and coal processing waste dam and embankment, in accordance with 30 CFR 780.25, and fill area for the disposal of excess spoil in accordance 30 CFR 780.35.

    (c) Except as provided in §§ 780.25(a)(2), 780.25(a)(3), 780.35(a), 816.71(b), 816.73(c), 816.74(c) and 816.81(c) of this chapter, cross sections, maps and plans required under paragraphs (b)(4), (5), (6), (10) and (11) of this section shall be prepared by, or under the direction of, and certified by a qualified registered professional engineer, a professional geologist, or in any State which authorizes land surveyors to prepare and certify such cross sections, maps and plans, a qualified, registered, professional, land surveyor, with assistance from experts in related fields such as landscape architecture.

    [44 FR 15357, Mar. 13, 1979; 44 FR 49685, Aug. 24, 1979, as amended at 45 FR 51550, Aug. 4, 1980; 48 FR 14822, Apr. 5, 1983; 50 FR 16199, Apr. 24, 1985; 56 FR 65635, Dec. 17, 1991; 73 FR 75875, Dec. 12, 2008; 79 FR 76228, Dec. 22, 2014; 81 FR 93330, Dec. 20, 2016; 82 FR 54949, Nov. 17, 2017]