§ 816.111 - Revegetation: General requirements.  


Latest version.
  • § 816.111 How must I revegetate areas disturbed by mining activities?Revegetation: General requirements.

    (a) You, the permittee, must establish a diverse, effective, permanent vegetative cover The permittee shall establish on regraded areas and on all other disturbed areas except -

    (1) Water areas approved as a postmining land use or in support of the postmining land use.

    (2) The surfaces of roads approved for retention to support the postmining land use.

    (3) Rock piles, water areas, and other non-vegetative features created to restore or enhance wildlife habitat under the fish and wildlife protection and enhancement plan approved in the permit in accordance with § 780.16 of this chapter.

    (4) Any other impervious surface, such as a building or a parking lot, approved as part of or in support of the postmining land use. This provision applies only to structures and facilities constructed before expiration of the revegetation responsibility period.

    (b) The reestablished vegetative cover must -

    (1) Comply with the revegetation plan approved in the permit in accordance with § 780.12(g) of this chapter.

    (2) Be consistent with the approved postmining land use and, except as provided in the revegetation plan approved in the permit in accordance with § 780.12(g) of this chapter, the native plant communities described in § 779.19 of this chapter.

    (3) Be at least equal in extent of cover to the natural vegetation of the area.

    (4) Be capable of stabilizing the soil surface and, in the long term, preventing erosion in excess of what would have occurred naturally had the site not been disturbed.

    (5) Not inhibit the establishment of trees and shrubs when the revegetation plan approved in the permit requires the use of woody plants.

    (c) Volunteer plants of species that are desirable components of the plant communities described in the permit application under § 779.19 of this chapter and that are not inconsistent with the postmining land use may be considered in determining whether the requirements of §§ 816.111 and 816.116 have been met.

    (d) You must stabilize all areas upon which you have redistributed soil or soil substitute materials. You must use one or a combination of the following methods, unless the regulatory authority determines that neither method is necessary to stabilize the surface and control erosion -

    (1) Establishing a temporary vegetative cover consisting of noncompetitive and non-invasive species, either native or domesticated or a combination thereof.

    (2) Applying a suitable mulch free of weed and noxious plant seeds.

    (e) You must plant all disturbed areas with the species needed to establish a permanent vegetative cover during the first normal period for favorable planting conditions after redistribution of the topsoil or other plant-growth medium. The normal period for favorable planting conditions is the generally accepted local planting time for the type of plant materials approved in the permit as part of the revegetation plan under § 780.12(g) of this chapter.

    water areas and surface areas of roads that are approved as part of the postmining land use, a vegetative cover that is in accordance with the approved permit and reclamation plan and that is -

    (1) Diverse, effective, and permanent;

    (2) Comprised of species native to the area, or of introduced species where desirable and necessary to achieve the approved postmining land use and approved by the regulatory authority;

    (3) At least equal in extent of cover to the natural vegetation of the area; and

    (4) Capable of stabilizing the soil surface from erosion.

    (b) The reestablished plant species shall -

    (1) Be compatible with the approved postmining land use;

    (2) Have the same seasonal characteristics of growth as the original vegetation;

    (3) Be capable of self-regeneration and plant succession;

    (4) Be compatible with the plant and animal species of the area; and

    (5) Meet the requirements of applicable State and Federal seed, poisonous and noxious plant, and introduced species laws or regulations.

    (c) The regulatory authority may grant exception to the requirements of paragraphs (b) (2) and (3) of this section when the species are necessary to achieve a quick-growing, temporary, stabilizing cover, and measures to establish permanent vegetation are included in the approved permit and reclamation plan.

    (d) When the regulatory authority approves a cropland postmining land use, the regulatory authority may grant exception to the requirements of paragraphs (a) (1), (3), (b) (2), and (3) of this section. The requirements of part 823 of this chapter apply to areas identified as prime farmland.

    [48 FR 40160, Sept. 2, 1983, as amended at 81 FR 93392, Dec. 20, 2016; 82 FR 54979, Nov. 17, 2017]