Code of Federal Regulations (Last Updated: November 8, 2024) |
Title 30 - Mineral Resources |
Chapter VII - Office of Surface Mining Reclamation and Enforcement, Department of the Interior |
SubChapter K - Permanent Program Performance Standards |
Part 824 - Special Permanent Program Performance Standards - Mountaintop Removal |
§ 824.11 - Mountaintop removal: Performance standards.
-
§ 824.11 What special performance standards apply to mountaintop removal mining operations?
(a) Applicability. This section applies to all operations for which the regulatory authority has approved a permit under § 785.14 of this chapter.
(b) Performance standards.
(1) You, the permittee, must comply with all applicable requirements of this subchapter and the regulatory program, other than the approximate original contour restoration requirements of § 816.102(a)(1) of this chapter and the thick overburden requirements of § 816.105 of this chapter.
(2)
(i) You must retain an outcrop barrierMountaintop removal: Performance standards.
of sufficient width(a) Under an approved regulatory program, surface coal mining activities may be conducted under a variance from the requirement of this subchapter for restoring affected areas to their approximate original contour, if -
(1) The regulatory authority grants the variance under a permit, in accordance with 30 CFR 785.14;
(2) The activities involve the mining of an entire coal seam running through the upper fraction of a mountain, ridge, or hill, by removing all of the overburden and creating a level plateau or gently rolling contour with no highwalls remaining;
(3) An industrial, commercial, agricultural, residential, or public facility (including recreational facilities) use is proposed and approved for the affected land;
(4) The alternative land use requirements of § 816.133(a) through (c) of this chapter are met;
(5) All applicable requirements of this subchapter and the regulatory program, other than the requirement to restore affected areas to their approximate original contour, are met;
(6) An outcrop barrier of sufficient width, consisting of the toe of the lowest coal seam, and its associated overburden,
. You must construct drains through the barrier to the extent necessary to prevent saturation of the backfill. (ii) The outcrop barrier requirement in paragraph (b)(2)(i) of this section does not apply if theare retained to prevent slides and erosion
coal, except that the regulatory authority may permit an exemption to the retention of the coal barrier requirement if the following conditions are satisfied:
(i) The proposed mine site was mined prior to May 3, 1978, and the toe of the lowest
alreadyseam has
.been removed
iii) You may remove a; or
(
theii) A coal barrier adjacent to a head-of-hollow fill may be removed after the elevation of
.a head-of-hollow fill attains the elevation of the coal barrier if the head-of-hollow fill provides the stability otherwise ensured by the retention of a coal barrier
iv) The regulatory authority may allow removal of the outcrop barrier required by paragraph (b)(2)(i) of this section if the regulatory program establishes standards for and requires construction of a barrier comprised of alternative materials that will provide equivalent stability. (3) The final graded slopes must be less than 1v:5h;
(
. The7) The final graded slopes on the mined area are less than 1v:5h, so as to create a level plateau or gently rolling configuration
may, and the outslopes of the plateau
1vdo not exceed
2h1v:
substantiate2h except where engineering data
§ of this chapter that an alternative configuration will achievesubstantiates, and the regulatory authority finds, in writing, and includes in the permit under
. (4) You must grade the plateau, that a minimum static safety factor of 1.5
(5) You must place sufficient spoilwill be attained;
(8) The resulting level or gently rolling contour is graded to drain inward from the outslope, except at specified points where it drains over the outslope in stable and protected channels.
approvedThe drainage shall not be through or over a valley or head-of-hollow fill.
(9) Natural watercourses below the lowest coal seam mined are not damaged;
(10) All waste and acid-forming or toxic-forming materials, including the strata immediately below the coal seam, are covered with non-toxic spoil to prevent pollution and achieve the approved postmining land use; and
(11) Spoil is placed on the mountaintop bench as necessary to achieve the
. You must place allpostmining land use
bench §approved under paragraphs (a)(3) and (a)(4) of this section. All excess spoil material not retained on the mountaintop
the excess spoil disposal requirements of § 816.71 orshall be placed in accordance with
of this chapter.30 CFR 816.41 and 816.43 and 816.71 through 816.74
[(6) You must prevent damage to natural watercourses in accordance with the finding made by the regulatory authority under § 785.14 of this chapter.
.
[44 FR 15452, Mar. 13, 1979; 44 FR 49687, Aug. 24, 1979, as amended at 48 FR 39905, Sept. 1, 1983; 48 FR 44781, Sept. 30, 1983; 81 FR 93445, Dec. 20, 2016; 82 FR 55020, Nov. 17, 2017]