Code of Federal Regulations (Last Updated: November 8, 2024) |
Title 43 - Public Lands: Interior |
Subtitle B - Regulations Relating to Public Lands |
Chapter II - Bureau of Land Management, Department of the Interior |
SubChapter C - Minerals Management (3000) |
Part 3170 - Onshore Oil and Gas Production |
Subpart 3175 - Measurement of Gas |
§ 3175.10 - Definitions and acronyms. |
§ 3175.20 - General requirements. |
§ 3175.30 - Incorporation by reference. |
§ 3175.31 - Specific performance requirements. |
§ 3175.40 - Measurement equipment approved by standard or make and model. |
§ 3175.41 - Flange-tapped orifice plates. |
§ 3175.42 - Chart recorders. |
§ 3175.43 - Transducers. |
§ 3175.44 - Flow-computer software. |
§ 3175.45 - Gas chromatographs. |
§ 3175.46 - Isolating flow conditioners. |
§ 3175.47 - Differential primary devices other than flange-tapped orifice plates. |
§ 3175.48 - Linear measurement devices. |
§ 3175.49 - Accounting systems. |
§ 3175.60 - Timeframes for compliance. |
§ 3175.61 - Grandfathering. |
§ 3175.70 - Measurement location. |
§ 3175.80 - Flange-tapped orifice plates (primary devices). |
§ 3175.90 - Mechanical recorder (secondary device). |
§ 3175.91 - Installation and operation of mechanical recorders. |
§ 3175.92 - Verification and calibration of mechanical recorders. |
§ 3175.93 - Integration statements. |
§ 3175.94 - Volume determination. |
§ 3175.100 - Electronic gas measurement (secondary and tertiary device). |
§ 3175.101 - Installation and operation of electronic gas measurement systems. |
§ 3175.102 - Verification and calibration of electronic gas measurement systems. |
§ 3175.103 - Flow rate, volume, and average value calculation. |
§ 3175.104 - Logs and records. |
§ 3175.110 - Gas sampling and analysis. |
§ 3175.111 - General sampling requirements. |
§ 3175.112 - Sampling probe and tubing. |
§ 3175.113 - Spot samples - general requirements. |
§ 3175.114 - Spot samples - allowable methods. |
§ 3175.115 - Spot samples - frequency. |
§ 3175.116 - Composite sampling methods. |
§ 3175.117 - On-line gas chromatographs. |
§ 3175.118 - Gas chromatograph requirements. |
§ 3175.119 - Components to analyze. |
§ 3175.120 - Gas analysis report requirements. |
§ 3175.121 - Effective date of a spot or composite gas sample. |
§ 3175.125 - Calculation of heating value and volume |
§ 3175.126 - Reporting of heating value and volume. |
§ 3175.130 - Transducer testing protocol. |
§ 3175.131 - General requirements for transducer testing. |
§ 3175.132 - Testing of reference accuracy. |
§ 3175.133 - Testing of influence effects. |
§ 3175.134 - Transducer test reporting. |
§ 3175.135 - Uncertainty determination. |
§ 3175.140 - Flow-computer software testing. |
§ 3175.141 - General requirements for flow-computer software testing. |
§ 3175.142 - Required static tests. |
§ 3175.143 - Required dynamic tests. |
§ 3175.144 - Flow-computer software test reporting. |
§ 3175.150 - Immediate assessments. |
Appendix A to Subpart 3175 - Table of Atmospheric Pressures |
Appendix A to Subpart 3175 of Part 3170 - Table of Atmospheric Pressures |