§ 265.373 - General operating requirements.  


Latest version.
  • § 265.373 General operating requirements.

    Before adding hazardous waste, the owner or operator must bring his thermal treatment process to steady state (normal) conditions of operation - including steady state operating temperature - using auxiliary fuel or other means, unless the process is a non-continuous (batch) thermal treatment process which requires a complete thermal cycle to treat a discrete quantity of hazardous waste.