Code of Federal Regulations (Last Updated: November 8, 2024) |
Title 40 - Protection of Environment |
Chapter I - Environmental Protection Agency |
SubChapter C - Air Programs |
Part 52 - Approval and Promulgation of Implementation Plans |
Subpart Z - Mississippi |
§ 52.1270 - Identification of plan.
-
(a) Purpose and scope. This section sets forth the applicable State implementation plan for Mississippi under section 110 of the Clean Air Act, 42 U.S.C. 7401-7671q and 40 CFR part 51 to meet national ambient air quality standards.
(b) Incorporation by reference.
(1) Material listed in paragraph (c) of this section with an EPA approval date prior to December 19, 2022, for Mississippi was approved for incorporation by reference by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Material is incorporated as it exists on the date of the approval and notice of any change in the material will be published in the Federal Register. Entries in paragraph (c) of this section with EPA approval dates after December 19, 2022, for Mississippi will be incorporated by reference in the next update to the SIP compilation.
(2) EPA Region 4 certifies that the rules/regulations provided by EPA in the SIP compilation at the addresses in paragraph (b)(3) of this section are an exact duplicate of the officially promulgated State rules/regulations which have been approved as part of the State Implementation Plan as of the dates referenced in paragraph (b)(1) of this section.
(3) Copies of the materials incorporated by reference may be inspected at the Region 4 EPA Office at 61 Forsyth Street SW, Atlanta, GA 30303. To obtain the material, please call (404) 562-9022. You may inspect the material with an EPA approval date prior to December 19, 2022, for Mississippi at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA email fedreg.legal@nara.gov or go to http://www.archives.gov/federal-register/cfr/ibr-locations.html.
(c) EPA-Approved Mississippi laws and regulations.
Table 1 to Paragraph (c)—EPA-Approved Mississippi Laws and Regulations
State citation Title/subject State effective date EPA approval date Explanation 11 MAC Part 1—Chapter 5 Mississippi Environmental Quality Permit Board: Regulations Regarding Administrative Procedures Pursuant to the Mississippi Administrative Procedures Act Rule 5.1 Description of Mississippi Environmental Quality Permit Board 5/11/2018 10/4/2018, 83 FR 50014 11 MAC Part 2—Chapter 1 Air Emission Regulations for the Prevention, Abatement, and Control of Air Contaminants Rule 1.1 General 6/25/2018 10/4/2018, 83 FR 50014 Except paragraphs (C)(1) and (2), which EPA has not approved into the SIP. Rule 1.2 Definitions 7/25/2013 2/21/2020, 85 FR 10070 Except the definition of “Air Quality Action Day,” which EPA has not approved into the SIP. Rule 1.3 Specific Criteria for Sources of Particulate Matter 7/25/2013 2/21/2020, 85 FR 10070 Except paragraph (G)(4), which is state effective February 9, 2009, and paragraph (G)(5), which is not approved into the SIP. Rule 1.4 Specific Criteria for Sources of Sulfur Compounds 7/25/2013 2/21/2020, 85 FR 10070 Rule 1.5 Specific Criteria for Sources of Chemical Emissions 7/25/2013 2/21/2020, 85 FR 10070 Rule 1.6 New Sources 7/25/2013 2/21/2020, 85 FR 10070 Except paragraphs (2) and (3), which EPA has not approved into the SIP. Rule 1.7 Exceptions 7/25/2013 2/21/2020, 85 FR 10070 Rule 1.9 Stack Height Considerations 7/25/2013 2/21/2020, 85 FR 10070 Rule 1.10 Provisions for Upsets, Startups, and Shutdowns 12/10/2016 11/18/2022, 87 FR 69177 Except for Rule 1.10.A and 1.10.B(3). Rule 1.11 Severability 7/25/2013 2/21/2020, 85 FR 10070 Rule 1.14 Provision for the Clean Air Interstate Rule 7/25/2013 2/21/2020, 85 FR 10070 11 MAC Part 2—Chapter 2 Permit Regulations for the Construction and/or Operation of Air Emissions Equipment Rule 2.1 General Requirements 7/25/2013 2/21/2020, 85 FR 10070 Rule 2.2 General Standards Applicable to All Permits 7/25/2013 2/21/2020, 85 FR 10070 Rule 2.3 Application for Permit To Construct and State Permit To Operate New Stationary Source 7/25/2013 2/21/2020, 85 FR 10070 Rule 2.4 Public Participation and Public Availability of Information 7/25/2013 2/21/2020, 85 FR 10070 Rule 2.5 Application Review 7/25/2013 2/21/2020, 85 FR 10070 Rule 2.6 Compliance Testing 7/25/2013 2/21/2020, 85 FR 10070 Rule 2.7 Emissions Evaluation Report 7/25/2013 2/21/2020, 85 FR 10070 Rule 2.8 Procedures for Renewal of State Permit To Operate 7/25/2013 2/21/2020, 85 FR 10070 Rule 2.9 Reporting and Recordkeeping 7/25/2013 2/21/2020, 85 FR 10070 Rule 2.10 Emission Reduction Schedule 7/25/2013 2/21/2020, 85 FR 10070 Rule 2.11 General Permits 7/25/2013 2/21/2020, 85 FR 10070 Rule 2.12 Multi-Media Permits 7/25/2013 2/21/2020, 85 FR 10070 Rule 2.13 Exclusions 7/25/2013 2/21/2020, 85 FR 10070 Rule 2.14 CAFOs 7/25/2013 2/21/2020, 85 FR 10070 Rule 2.15 Options 7/25/2013 2/21/2020, 85 FR 10070 Rule 2.16 Permit Transfer 7/25/2013 2/21/2020, 85 FR 10070 Rule 2.17 Severability 7/25/2013 2/21/2020, 85 FR 10070 11 MAC Part 2—Chapter 3 Regulations for the Prevention of Air Pollution Emergency Episodes Rule 3.1 General 7/25/2013 2/21/2020, 85 FR 10070 Rule 3.2 Definitions 7/25/2013 2/21/2020, 85 FR 10070 Rule 3.3 Episode Criteria 7/25/2013 2/21/2020, 85 FR 10070 Rule 3.4 Emission Control Action Programs 7/25/2013 2/21/2020, 85 FR 10070 Rule 3.5 Emergency Orders 7/25/2013 2/21/2020, 85 FR 10070 Except the removal of language from the “Emergency” level for coal or oil-fired process steam generating facilities under Rule 3.5, Table 1, Section 2, which is state effective June 3, 1988. 11 MAC Part 2—Chapter 5 Regulations for the Prevention of Significant Deterioration of Air Quality Rule 5.1 Purpose of this Regulation 5/28/2016 8/8/2017, 82 FR 37015 Rule 5.2 Adoption of Federal Rules by Reference 5/28/2016 9/16/2020, 85 FR 57707 The version of Rule 5.2 in the SIP does not incorporate by reference the provisions at § 52.21(b)(2)(v) and (b)(3)(iii)(c) that were stayed indefinitely by the Fugitive Emissions Interim Rule (published in the Federal Register March 30, 2011). 11 MAC Part 2-11 Regulations for Ambient Air Quality Nonattainment Areas Rule 11.1 General 9/26/2015 1/12/2016, 81 FR 1321 Rule 11.2 Definitions 9/26/2015 1/12/2016, 81 FR 1321 Rule 11.3 Emissions Statement 9/26/2015 1/12/2016, 81 FR 1321 Mississippi State Constitution Article 4 Section 109 Interest of Public Officers in Contracts 9/27/2012 4/8/2013, 78 FR 20795 Mississippi Code Section 25-4-25 Persons required to file statement of economic interest 9/27/2012 4/8/2013, 78 FR 20795 Section 25-4-27 Contents of statement of economic interest 9/27/2012 4/8/2013, 78 FR 20795 Section 25-4-29 Filing dates for statements 9/27/2012 4/8/2013, 78 FR 20795 Section 25-4-101 Declaration of public policy 9/27/2012 4/8/2013, 78 FR 20795 Section 25-4-103 Definitions 9/27/2012 4/8/2013, 78 FR 20795 Section 25-4-105 Certain actions, activities and business relationships prohibited or authorized; contracts in violation of section voidable; penalties 9/27/2012 4/8/2013, 78 FR 20795 Section 49-2-5 Commission on Environmental Quality 7/1/2016 10/4/2018, 83 FR 50014 (d) EPA approved Mississippi source-specific requirements.
EPA Approved Mississippi Source-Specific Requirements
Name of source Permit number State effective date EPA approval date Explanation None (e) EPA approved Mississippi non-regulatory provisions.
EPA Approved Mississippi Non-Regulatory Provisions
Name of non-regulatory SIP provision Applicable geographic or nonattainment area State submittal date/effective date EPA approval date Explanation 110(a)(1) and (2) Infrastructure Requirements for the 1997 8-Hour Ozone National Ambient Air Quality Standards Mississippi 12/7/2007 7/13/2011, 76 FR 41123 For the 1997 8-hour ozone NAAQS. Regional Haze Plan Statewide 9/22/2008 6/27/2012, 77 FR 38191 Regional Haze Plan Update—E. I. Dupont Reasonable Progress and Mississippi Phosphates BART Determinations Statewide 5/9/2011 6/27/2012, 77 FR 38191 110(a)(1) and (2) Infrastructure Requirements for 1997 Fine Particulate Matter National Ambient Air Quality Standards Mississippi 12/7/2007 10/9/2012, 77 FR 61276 With the exception of sections 110(a)(2)(D)(i), 110(a)(2)(E)(ii) and 110(a)(2)(G). 110(a)(1) and (2) Infrastructure Requirements for 2006 Fine Particulate Matter National Ambient Air Quality Standards Mississippi 10/6/2009 10/9/2012, 77 FR 61276 With the exception of sections 110(a)(2)(D)(i), 110(a)(2)(E)(ii) and 110(a)(2)(G). 110(a)(2)(G) Infrastructure Requirement for the 1997 and 2006 Fine Particulate Matter National Ambient Air Quality Standards Mississippi 7/26/2012 10/9/2012, 77 FR 61279 110(a)(2)(D)(i)(I) Infrastructure Requirements for the 2006 24-hour PM2.5 NAAQS Mississippi 10/6/2009 10/11/2012, 77 FR 61727 EPA partially disapproved this SIP submission to the extent that it relied on the Clean Air Interstate Rule to meet the 110(a)(2)(D)(i)(I) requirements for the 2006 24-hour PM2.5 NAAQS. 110(a)(2)(E)(ii) Infrastructure Requirement for the 1997 and 2006 Fine Particulate Matter National Ambient Air Quality Standards Mississippi 10/11/2012 4/8/2013, 78 FR 20795 EPA disapproved the State's 110(a)(2)(E)(ii) as it relates to section 128(a)(2), the significant portion of income requirement. 110(a)(1) and (2) Infrastructure Requirements for 1997 Fine Particulate Matter National Ambient Air Quality Standards Mississippi 12/7/2007 4/12/2013, 78 FR 21845 Addressing element 110(a)(2)(D)(i)(II) prong 3 only 110(a)(1) and (2) Infrastructure Requirements for 2006 Fine Particulate Matter National Ambient Air Quality Standards Mississippi 10/6/2009 4/12/2013, 78 FR 21845 Addressing element 110(a)(2)(D)(i)(II) prong 3 only Transportation Conformity Interagency Consultation And General Provisions DeSoto County portion of Memphis, TN-AR-MS 2008 8-hour Ozone Nonattainment Area 5/31/2013 11/13/2013, 78 FR 67955 110(a)(1) and (2) Infrastructure Requirements for 1997 Fine Particulate Matter National Ambient Air Quality Standards Mississippi 12/7/2007 5/7/2014, 79 FR 26148 Addressing prong 4 of section 110(a)(2)(D)(i) only. 110(a)(1) and (2) Infrastructure Requirements for 2006 Fine Particulate Matter National Ambient Air Quality Standards Mississippi 10/6/2009 5/7/2014, 79 FR 26148 Addressing prong 4 of section 110(a)(2)(D)(i) only. 110(a)(1) and (2) Infrastructure Requirements for the 2008 8-Hour Ozone National Ambient Air Quality Standards Mississippi 7/26/2012 3/2/2015, 80 FR 11133 With the exception of sections:
110(a)(2)(C) and (J) concerning PSD permitting requirements;
110(a)(2)(D)(i)(I) and (II) (prongs 1 through 4) concerning interstate transport requirements;
110(a)(2)(E)(ii) concerning state board majority requirements respecting significant portion of income; and
110(a)(2)(J) concerning visibility requirements.110(a)(1) and (2) Infrastructure Requirements for the 2008 Lead NAAQS Mississippi 11/17/2011 3/18/2015, 80 FR 14023 Addressing the PSD permitting requirements of sections 110(a)(2)(C), 110(a)(2)(D)(i)(II) (prong 3) and 110(a)(2)(J) only. 110(a)(1) and (2) Infrastructure Requirements for the 2008 Ozone NAAQS Mississippi 5/29/2012 and amended on
7/26/20123/18/2015, 80 FR 14203 Addressing the PSD permitting requirements of sections 110(a)(2)(C), 110(a)(2)(D)(i)(II) (prong 3) and 110(a)(2)(J) only. 110(a)(1) and (2) Infrastructure Requirements for the 2010 NO2 NAAQS Mississippi 2/28/2013 3/18/2015, 80 FR 14023 Addressing the PSD permitting requirements of sections 110(a)(2)(C), 110(a)(2)(D)(i)(II) (prong 3) and 110(a)(2)(J) only. 110(a)(1) and (2) Infrastructure Requirements for the 2008 Lead National Ambient Air Quality Standards 110(a)(2)(E)(ii) Infrastructure Requirement for 2008 Lead National Ambient Air Quality Standards 11/4/2011 3/30/2015, 80 FR 16568 With the exception of provisions pertaining to PSD permitting requirements in sections 110(a)(2)(C), prong 3 of D(i) and (J) and the majority of requirements respecting significant portion of income of section 110(a)(2)(E)(ii) (related to section 128(a)(2)). 2011 Base Year Emissions Inventory for the Mississippi portion of the Memphis, TN-MS-AR 2008 Ozone NAAQS Nonattainment Area DeSoto County portion of Memphis, TN-AR-MS 2008 8-hour Ozone Nonattainment Area 1/14/2015 7/02/2015, 80 FR 37988 110(a)(1) and (2) Infrastructure Requirements for the 2008 Ozone NAAQS Mississippi 7/26/2012 8/12/2015, 80 FR 48258 Addressing the visibility requirements of 110(a)(2)(J) only. 2008 8-hour ozone Maintenance Plan for the DeSoto County portion of Memphis, TN-AR-MS Nonattainment Area DeSoto County portion of Memphis, TN-AR-MS Nonattainment Area 12/2/2015 4/8/2016, 81 FR 20545 110(a)(1) and (2) Infrastructure Requirements for the 2010 1-hour NO2 National Ambient Air Quality Standard Mississippi 2/28/2013 9/16/2016, 81 FR 67307 With the exception of sections: 110(a)(2)(C) and (J) concerning PSD permitting requirements; 110(a)(2)(D)(i)(I) and (II) (prongs 1 through 4) concerning interstate transport requirements and the state board majority requirements respecting significant portion of income of section 110(a)(2)(E)(ii). 110(a)(1) and (2) Infrastructure Requirements for the 2010 1-hour SO2 NAAQS Mississippi 6/20/2013 9/30/2016, 81 FR 67178 With the exception of the interstate transport requirements of section 110(a)(2)(D)(i)(I) and (II) (prongs 1, 2, and 4) and the state board majority requirements respecting significant portion of income of section 110(a)(2)(E)(ii). 110(a)(1) and (2) Infrastructure Requirements for the 2012 Annual PM 2.5 NAAQS Mississippi 12/11/2015 12/12/2016, 81 FR 89393 With the exception of sections: 110(a)(2)(C) and (J) concerning PSD permitting requirements; 110(a)(2)(D)(i)(I) and (II) (prongs 1 through 4) concerning interstate transport requirements and the state board majority requirements respecting significant portion of income of section 110(a)(2)(E)(ii). Good Neighbor Provisions (Section 110(a)(2)(D)(i)(I) for the 2010 1-hour NO2 NAAQS Mississippi 5/23/2016 12/22/16, 81 FR 93824 110(a)(1) and (2) Infrastructure Requirements for the 2012 Annual PM2.5 NAAQS Mississippi 12/8/2015 9/25/2018, 83 FR 48387 Addressing Prongs 1 and 2 of section 110(a)(2)(D)(i)(I) only. 110(a)(1) and (2) Infrastructure Requirements for the 1997 Annual PM2.5 NAAQS Mississippi 6/25/2018 10/4/2018, 83 FR 50014 Addressing the state board requirements of sections 128 and 110(a)(2)(E)(ii) only. 110(a)(1) and (2) Infrastructure Requirements for the 2006 24-hour PM2.5 NAAQS Mississippi 6/25/2018 10/4/2018, 83 FR 50014 Addressing the state board requirements of sections 128 and 110(a)(2)(E)(ii) only. 110(a)(1) and (2) Infrastructure Requirements for the 2012 24-hour PM2.5 NAAQS Mississippi 6/25/2018 10/4/2018, 83 FR 50014 Addressing the state board requirements of sections 128 and 110(a)(2)(E)(ii) only. 110(a)(1) and (2) Infrastructure Requirements for the 2008 Lead NAAQS Mississippi 6/25/2018 10/4/2018, 83 FR 50014 Addressing the state board requirements of sections 128 and 110(a)(2)(E)(ii) only. 110(a)(1) and (2) Infrastructure Requirements for the 2008 8-hour Ozone NAAQS Mississippi 6/25/2018 10/4/2018, 83 FR 50014 Addressing the state board requirements of sections 128 and 110(a)(2)(E)(ii) only. 110(a)(1) and (2) Infrastructure Requirements for the 2010 NO2 NAAQS Mississippi 6/25/2018 10/4/2018, 83 FR 50014 Addressing the state board requirements of sections 128 and 110(a)(2)(E)(ii) only. 110(a)(1) and (2) Infrastructure Requirements for the 2010 SO2 NAAQS Mississippi 6/25/2018 10/4/2018, 83 FR 50014 Addressing the state board requirements of sections 128 and 110(a)(2)(E)(ii) only. 110(a)(1) and (2) Infrastructure Requirements for the 2012 Annual PM2.5 NAAQS Mississippi 12/11/2015 12/18/2018, 83 FR 64746 Addressing the PSD permitting requirements of sections 110(a)(2)(C), 110(a)(2)(D)(i)(II) (prong 3) and 110(a)(2)(J) only Regional Haze Progress Report Mississippi 10/4/2018 10/6/2021, 86 FR 55501 BART SIP Mississippi 8/13/2020 10/6/2021, 86 FR 55501 110(a)(1) and (2) Infrastructure Requirements for the 2015 8-hour ozone NAAQS Mississippi 1/25/2021 9/22/2022, 87 FR 57832 With the exception of the visibility provision of section 110(a)(2)(D)(i)(II) (prong 4), the PSD provisions related to major sources under sections 110(a)(2)(C), 110(a)(2)(D)(i)(II) (prong 3), and 110(a)(2)(J), and the modeling provision of 110(a)(2)(K). 110(a)(1) and (2) Infrastructure Requirements for the 2015 8-hour Ozone NAAQS Mississippi 1/25/2021 3/1/2023, 88 FR 12833 Addressing and conditionally approving the PSD elements of sections 110(a)(2)(C), (D)(i)(II), and J, and section 110(a)(2)(K) only. [62 FR 35442, July 1, 1997]