Code of Federal Regulations (Last Updated: November 8, 2024) |
Title 40 - Protection of Environment |
Chapter I - Environmental Protection Agency |
SubChapter C - Air Programs |
Part 52 - Approval and Promulgation of Implementation Plans |
Subpart QQ - South Dakota |
§ 52.2170 - Identification of plan.
-
§ 52.2170 Identification of plan.
(a) Purpose and scope. This section sets forth the applicable State Implementation Plan for South Dakota under section 110 of the Clean Air Act, 42 U.S.C. 7410 and 40 CFR part 51 to meet national ambient air quality standards or other requirements under the Clean Air Act.
(b) Incorporation by reference.
(1) Material listed in paragraphs (c) and (d) of this section with an EPA approval date prior to October 1, 2015, was approved for incorporation by reference by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Material is incorporated as it exists on the date of the approval, and notice of any change in the material will be published in the Federal Register. Entries in paragraphs (c) and (d) of this section with EPA approval dates after October 1, 2015, will be incorporated by reference in the next update to the SIP compilation.
(2) EPA Region 8 certifies that the rules/regulations provided by EPA in the SIP compilation at the addresses in paragraph (b)(3) of this section are an exact duplicate of the officially promulgated state rules/regulations which have been approved as part of the SIP as of October 1, 2015.
(3) Copies of the materials incorporated by reference may be inspected at the EPA Region 8 Office, Office of Partnerships and Regulatory Assistance (OPRA), Air Program, 1595 Wynkoop Street, Denver, Colorado 80202-1129.
(c) EPA-approved regulations.
Rule No. Rule title State effective date EPA effective date Final rule citation, date Comments Statewide 74:09:01. Procedures - Board of Minerals and Environment, Contested Case Procedure 74:09:01:20 Board member conflict of interest 5/29/14 3/2/15 80 FR 4799, 1/29/15 74:09:01:21 Board member potential conflict of interests 5/29/14 3/2/15 80 FR 4799, 1/29/15 74:36:01. Definitions 74:36:01:01 Definitions 04/19/2021 5/11/2022 87 FR 21026, 4/11/2022 74:36:01:03 Administrative permit amendment defined 4/4/99 5/7/03 68 FR 16726, 4/7/03 74:36:01:04 Affected states defined 4/22/93 12/18/98 63 FR 55804, 10/19/98 74:36:01:05 Applicable requirements of the Clean Air Act defined 11/25/2019 11/25/2020 85 FR 67658, 10/26/2020 74:36:01:06 Complete application defined 4/22/93 12/18/98 63 FR 55804, 10/19/98 74:36:01:08 Major source defined 4/4/99 5/19/14 79 FR 21852, 4/18/14 74:36:01:09 Categories of sources defined 1/2/05 10/13/06 71 FR 46403, 8/14/06 74:36:01:10 Modification defined 10/13/15 11/14/16 81 FR 70628, 10/13/16 74:36:01:11 National ambient air quality standard (NAAQS) 4/22/93 12/18/98 63 FR 55804, 10/19/98 74:36:01:12 Potential to emit defined 4/22/93 12/18/98 63 FR 55804, 10/19/98 74:36:01:13 Process weight rate defined 4/22/93 12/18/98 63 FR 55804, 10/19/98 74:36:01:15 Regulated air pollutant defined 1/5/95 5/19/14 79 FR 21852, 4/18/14 74:36:01:16 Responsible official defined 1/2/05 10/13/06 71 FR 46403, 8/14/06 74:36:01:18 Municipal solid waste landfill defined 12/29/96 12/18/98 63 FR 55804, 10/19/98 74:36:01:19 Existing municipal solid waste landfill defined 11/25/2019 11/25/2020 85 FR 67658, 10/26/2020 74:36:01:20 Physical change in or change in the method of operation defined 11/25/2019 11/25/2020 85 FR 67658, 10/26/2020 74:36:01:21 Commence construction defined 6/28/10 7/28/14 79 FR 36419, 6/27/14 74:36:02. Ambient Air Quality 74:36:02:01 Air quality goals 4/22/93 12/18/98 63 FR 55804, 10/19/98 74:36:02:02 Ambient air quality standards 11/25/2019 11/25/2020 85 FR 67658, 10/26/2020 74:36:02:03 Methods of sampling and analysis 11/25/2019 11/25/2020 85 FR 67658, 10/26/2020 74:36:02:04 Ambient air monitoring network 11/25/2019 11/25/2020 85 FR 67658, 10/26/2020 74:36:02:05 Air quality monitoring requirements 11/25/2019 11/25/2020 85 FR 67658, 10/26/2020 74:36:03. Air Quality Episodes 74:36:03:01 Air pollution emergency episode 11/25/2019 11/25/2020 85 FR 67658, 10/26/2020 74:36:03:02 Episode emergency contingency plan 11/25/2019 11/25/2020 85 FR 67658, 10/26/2020 74:36:04. Operating Permits for Minor Sources 74:36:04:01 Applicability 4/22/93 12/18/98 63 FR 55804, 10/19/98 74:36:04:02 Minor source operating permit required 6/28/10 7/28/14 79 FR 36419, 6/27/14 74:36:04:02.01 Minor source operating permit exemption 6/28/10 7/28/14 79 FR 36419, 6/27/14 74:36:04:03 Emission unit exemptions 10/13/15 11/14/16 81 FR 70628, 10/13/16 74:36:04:04 Standard for issuance of a minor source operating permit 9/13/2017 7/26/2018 83 FR 29700, 6/26/2018 74:36:04:05 Time period for operating permits and renewals 6/25/13 11/2/15 80 FR 59620, 10/2/15 74:36:04:06 Timely and complete application for operating permit required 6/28/10 7/28/14 79 FR 36419, 6/27/14 74:36:04:07 Required contents of complete application for operating permit 6/28/10 7/28/14 79 FR 36419, 6/27/14 74:36:04:08 Applicant required to supplement or correct application 1/5/95 12/18/98 63 FR 55804, 10/19/98 74:36:04:09 Permit application - Completeness review 6/28/10 7/28/14 79 FR 36419, 6/27/14 74:36:04:10 Time period for department's recommendation 6/28/10 7/28/14 79 FR 36419, 6/27/14 74:36:04:11 Department's recommendation on operating permit 4/4/99 5/7/03 68 FR 16726, 4/7/03 74:36:04:12 Public participation in permitting process 6/25/13 11/2/15 80 FR 59620, 10/2/15 74:36:04:12.01 Public review of department's draft permit 6/28/10 7/28/14 79 FR 36419, 6/27/14 74:36:04:13 Final permit decision - Notice to interested persons 6/25/13 11/2/15 80 FR 59620, 10/2/15 74:36:04:14 Right to petition for contested case hearing 6/25/13 11/2/15 80 FR 59620, 10/2/15 74:36:04:15 Contents of operating permit 6/25/13 11/2/15 80 FR 59620, 10/2/15 74:36:04:16 Operating permit expiration 6/28/10 7/28/14 79 FR 36419, 6/27/14 74:36:04:17 Renewal of operating permit 6/28/10 7/28/14 79 FR 36419, 6/27/14 74:36:04:18 Operating permit revision 6/28/10 7/28/14 79 FR 36419, 6/27/14 74:36:04:19 Administrative permit amendment 4/4/99 5/7/03 68 FR 16726, 4/7/03 74:36:04:20 Procedures for administrative permit amendments 6/28/10 7/28/14 79 FR 36419, 6/27/14 74:36:04:20.01 Minor permit amendment required 6/28/10 7/28/14 79 FR 36419, 6/27/14 74:36:04:20.02 Requirements for minor permit amendment 1/5/95 12/18/98 63 FR 55804, 10/19/98 74:36:04:20.03 Application for minor permit amendment 1/5/95 12/18/98 63 FR 55804, 10/19/98 74:36:04:20.04 Department deadline to approve minor permit amendment 6/28/10 7/28/14 79 FR 36419, 6/27/14 74:36:04:21 Permit modifications 10/13/15 11/14/16 81 FR 70628, 10/13/16 74:36:04:22 Source status change - new permit required 4/4/99 5/7/03 68 FR 16726, 4/7/03 74:36:04:23 Reopening operating permit for cause 6/28/10 7/28/14 79 FR 36419, 6/27/14 74:36:04:24 Procedures to reopen operating permit 4/22/93 12/18/98 63 FR 55804, 10/19/98 74:36:04:27 Operating permit termination, revision, and revocation 6/28/10 7/28/14 79 FR 36419, 6/27/14 74:36:04:28 Notice of operating noncompliance - Contents 4/22/93 12/18/98 63 FR 55804, 10/19/98 74:36:04:29 Petition for contested case on alleged violation 4/22/93 12/18/98 63 FR 55804, 10/19/98 74:36:04:31 Circumvention of emissions not allowed 4/22/93 12/18/98 63 FR 55804, 10/19/98 74:36:04:32 General permits 6/28/10 7/28/14 79 FR 36419, 6/27/14 74:36:04:33 Secretary may require an individual permit 9/1/03 7/9/04 69 FR 25839, 5/10/04 74:36:06. Regulated Air Pollutant Emissions 74:36:06:01 Applicability 1/5/95 12/18/98 63 FR 55804, 10/19/98 74:36:06:02 Allowable emissions for fuel-burning units 4/4/99 5/7/03 68 FR 16726, 4/7/03 74:36:06:03 Allowable emissions for process industry units 4/4/99 5/7/03 68 FR 16726, 4/7/03 74:36:06:04 Particulate emission restrictions for incinerators and waste wood burners 1/2/05 10/13/06 71 FR 46403,8/14/06 74:36:06:05 Most stringent interpretation applicable 4/22/93 12/18/98 63 FR 55804, 10/19/98 74:36:06:06 Stack performance test 1/2/05 10/13/06 71 FR 46403, 8/14/06 74:36:06:07 Open burning practices prohibited 9/13/2017 7/26/2018 83 FR 29700, 6/26/2018 74:36:07. New Source Performance Standards 74:36:07:08 Ash disposal requirements 12/29/96 6/21/00 65 FR 32033, 5/22/00 74:36:07:29 Operating requirements for wire reclamation furnaces 4/22/93 11/6/95 60 FR 46222, 9/6/95 74:36:07:30 Monitoring requirements for wire reclamation furnaces 4/22/93 11/6/95 60 FR 46222, 9/6/95 74:36:09. Prevention of Significant Deterioration 74:36:09:01 Applicability 9/18/06 1/22/08 72 FR 72617, 12/21/07 74:36:09:01.01 Prevention of significant deterioration permit required 9/18/06 1/22/08 72 FR 72617, 12/21/07 74:36:09:02 Prevention of Significant Deterioration 11/25/2019 11/25/2020 85 FR 67658, 10/26/2020 74:36:09:03 Public participation 11/25/2019 11/25/2020 85 FR 67658, 10/26/2020 74:36:10. New Source Review 74:36:10:01 Applicability 4/22/93 12/18/98 63 FR 55804, 10/19/98 74:36:10:02 Definitions 11/25/2019 11/25/2020 85 FR 67658, 10/26/2020 74:36:10:03.01 New source review preconstruction permit required 11/25/2019 11/25/2020 85 FR 67658, 10/26/2020 74:36:10:05 New source review preconstruction permit required 11/25/2019 11/25/2020 85 FR 67658, 10/26/2020 74:36:10:06 Causing or contributing to a violation of any national ambient air quality standard 11/14/16 81 FR 70628, 10/13/16 74:36:10:07 Determining credit for emissions Offsets 11/25/2019 11/25/2020 85 FR 67658, 10/26/2020 74:36:10:08 Projected actual emissions 11/25/2019 11/25/2020 85 FR 67658, 10/26/2020 74:36:10:09 Clean unit test for emission units subject to lowest achievable emission rate 1/2/05 10/13/06 71 FR 46403, 8/14/06 74:36:10:10 Clean unit test for emission units comparable to lowest achievable emission rate 1/2/05 10/13/06 71 FR 46403, 8/14/06 74:36:11. Performance Testing 74:36:11:01 Stack performance testing or other testing methods 11/25/2019 11/25/2020 85 FR 67658, 10/26/2020 74:36:11:02 Secretary may require performance tests 11/25/2019 11/25/2020 85 FR 67658, 10/26/2020 74:36:11:03 Notice to department of performance test 11/25/2019 11/25/2020 85 FR 67658, 10/26/2020 74:36:11:04 Testing new fuels or raw materials 11/25/2019 11/25/2020 85 FR 67658, 10/26/2020 74:36:12. Control of Visible Emissions 74:36:12:01 Restrictions on visible emissions 11/25/2019 11/25/2020 85 FR 67658, 10/26/2020 74:36:12:02 Exceptions to restrictions 6/25/13 11/2/15 80 FR 59620, 10/2/15 74:36:12:03 Exceptions granted to alfalfa pelletizers or dehydrators 11/25/2019 11/25/2020 85 FR 67658, 10/26/2020 74:36:13. Continuous Emission Monitoring Systems 74:36:13:01 Secretary may require continuous emission monitoring systems (CEMS) 4/22/93 12/18/98 63 FR 55804, 10/19/98 74:36:13:02 Minimum performance specifications for all continuous emission monitoring systems 11/25/2019 11/25/2020 85 FR 67658, 10/26/2020 74:36:13:03 Reporting requirements 11/25/2019 11/25/2020 85 FR 67658, 10/26/2020 74:36:13:04 Notice to department of exceedance 11/25/2019 11/25/2020 85 FR 67658, 10/26/2020 74:36:13:05 Compliance determined by data from continuous emission monitor 4/22/93 12/18/98 63 FR 55804, 10/19/98 74:36:13:06 Compliance certification 11/25/2019 11/25/2020 85 FR 67658, 10/26/2020 74:36:13:07 Credible evidence 11/25/2019 11/25/2020 85 FR 67658, 10/26/2020 74:36:13:08 Compliance assurance monitoring 10/13/15 11/14/16 81 FR 70628, 10/13/16 74:36:17. Rapid City Street Sanding and Deicing 74:36:17:01 Applicability 2/11/96 8/9/02 67 FR 39619, 6/10/02 74:36:17:02 Reasonable available control technology 2/11/96 8/9/02 67 FR 39619, 6/10/02 74:36:17:03 Street sanding specifications 2/11/96 8/9/02 67 FR 39619, 6/10/02 74:36:17:04 Street deicing and maintenance plan 2/11/96 8/9/02 67 FR 39619, 6/10/02 74:36:17:05 Street sanding and sweeping recordkeeping 2/11/96 8/9/02 67 FR 39619, 6/10/02 74:36:17:06 Inspection authority 2/11/96 8/9/02 67 FR 39619, 6/10/02 74:36:18. Regulations for State Facilities in the Rapid City Area 74:36:18:01 Definitions 7/1/02 3/22/04 69 FR 2671,1/20/04 74:36:18:02 Applicability 7/1/02 3/22/04 69 FR 2671, 1/20/04 74:36:18:03 Permit required 7/1/02 3/22/04 69 FR 2671, 1/20/04 74:36:18:04 Time period for permits and renewals 6/25/13 11/2/15 80 FR 59620, 10/2/15 74:36:18:05 Required contents of a complete application for a permit 6/25/13 11/2/15 80 FR 59620, 10/2/15 74:36:18:06 Contents of permit 6/25/13 11/2/15 80 FR 59620, 10/2/15 74:36:18:07 Permit expiration 7/1/02 3/22/04 69 FR 2671, 1/20/04 74:36:18:08 Renewal of permit 7/1/02 3/22/04 69 FR 2671, 1/20/04 74:36:18:09 Reasonably available control technology required 7/1/02 3/22/04 69 FR 2671, 1/20/04 74:36:18:10 Visible emission limit for construction and continuous operation activities 11/25/2019 11/25/2020 85 FR 67658, 10/26/2020 74:36:18:11 Exception to visible emission limit 6/25/13 11/2/15 80 FR 59620, 10/2/15 74:36:18:12 Notice of operating noncompliance - Contents 6/25/13 11/2/15 80 FR 59620, 10/2/15 74:36:20. Construction Permits for New Sources or Modifications 74:36.20.01 Applicability 6/28/10 7/28/14 79 FR 36419, 6/27/14 74:36:20:02 Construction permit required 10/13/15 11/14/16 81 FR 70628, 10/13/16 74:36:20:03 Construction permit exemption 6/28/10 7/28/14 79 FR 36419, 6/27/14 74:36:20:04 Emission unit exemptions 6/28/10 7/28/14 79 FR 36419, 6/27/14 74:36:20:05 Standard for issuance of construction permit 11/25/2019 11/25/2020 85 FR 67658, 10/26/2020 74:36:20:06 Timely and complete application for a construction permit required 6/28/10 7/28/14 79 FR 36419, 6/27/14 74:36:20:07 Required contents of complete application for a construction permit 6/28/10 7/28/14 79 FR 36419, 6/27/14 74:36:20:08 Applicant required to supplement or correct application 6/28/10 7/28/14 79 FR 36419, 6/27/14 74:36:20:09 Permit application - Completeness review 6/28/10 7/28/14 79 FR 36419, 6/27/14 74:36:20:10 Time period for department's recommendation 6/28/10 7/28/14 79 FR 36419, 6/27/14 74:36:20:11 Public participation in permitting process 6/25/13 11/2/15 80 FR 59620, 10/2/15 74:36:20:12 Public review of department's draft permit 6/28/10 7/28/14 79 FR 36419, 6/27/14 74:36:20:13 Final permit decision - Notice to interested persons 6/25/13 11/2/15 80 FR 59620, 10/2/15 74:36:20:14 Right to petition for contested case hearing 6/25/13 11/2/15 80 FR 59620, 10/2/15 74:36:20:15 Contents of construction permit 6/25/13 11/2/15 80 FR 59620, 10/2/15 74:36:20:16 Administrative permit amendment 6/28/10 7/28/14 79 FR 36419, 6/27/14 74:36:20:17 Procedures for administrative permit amendments 6/28/10 7/28/14 79 FR 36149, 6/27/14 74:36:20:18 Reopening construction permit for cause 6/28/10 7/28/14 79 FR 36419, 6/27/14 74:36:20:19 Procedures to reopen construction permit 6/28/10 7/28/14 79 FR 36149, 6/27/14 74:36:20:20 Construction permit does not exempt from other requirements 6/28/10 7/28/14 79 FR 36419, 6/27/14 74:36:20:21 Expiration of a construction permit 6/28/10 7/28/14 79 FR 36419, 6/27/14 74:36:20:22 Notice of constructing or operating noncompliance - Contents 6/28/10 7/28/14 79 FR 36419, 6/27/14 74:36:20:23 Petition for contested case on alleged violation 6/28/10 7/28/14 79 FR 36419, 6/27/14 74:36:20:24 Circumvention of emissions not allowed 6/28/10 7/28/14 79 FR 36419, 6/27/14 74:36:21. Regional Haze Program 74:36:21:01 Applicability 12/7/10 5/29/12 77 FR 24845, 4/26/12 74:36:21:02 Definitions 11/25/2019 11/25/2020 85 FR 67658, 10/26/2020 74:36:21:03 Existing stationary facility defined 12/7/10 5/29/12 77 FR 24845, 4/26/12 74:36:21:04 Visibility impact analysis 11/25/2019 11/25/2020 85 FR 67658, 10/26/2020 74:36:21:05 BART determination 11/25/2019 11/25/2020 85 FR 67658, 10/26/2020 74:36:21:06 BART determination for a BART-eligible coal-fired power plant 9/19/11 5/29/12 77 FR 24845, 4/26/12 74:36:21:07 Installation of controls based on visibility impact analysis or BART determination 12/7/10 5/29/12 77 FR 24845, 4/26/12 74:36:21:08 Operation and maintenance of controls 12/7/10 5/29/12 77 FR 24845, 4/26/12 74:36:21:09 Monitoring, recordkeeping, and reporting 11/25/2019 11/25/2020 85 FR 67658, 10/26/2020 74:36:21:10 Permit to construct 12/7/10 5/29/12 77 FR 24845, 4/26/12 74:36:21:11 Permit required for BART determination 12/7/10 5/29/12 77 FR 24845, 4/26/12 74:36:21:12 Federal land manager notification and review 12/7/10 5/29/12 77 FR 24845, 4/26/12 74:36:21:13 Calculate a 30-day rolling average 11/25/2019 11/25/2020 85 FR 67658, 10/26/2020 Pennington Ordinance #12 - Fugitive Dust Regulation - 1.0 Control of Fugitive Dust 1.1 Applicability 12/12/78 7/13/79 44 FR 44494, 7/30/79 1.2 Definitions 12/12/78 7/13/79 44 FR 44494, 7/30/79 1.3 Standard of compliance 12/12/78 7/13/79 44 FR 44494, 7/30/79 1.4 Reasonably available control technology required 12/12/78 7/13/79 44 FR 44494, 7/30/79 1.5 Fugitive dust control permits required for construction activities, i.e., temporary operations 12/12/78 7/13/79 44 FR 44494, 7/30/79 1.6 Compliance plans and schedules required, i.e., continuous operations 12/12/78 7/13/79 44 FR 44494, 7/30/79 1.7 Enforcement procedures 12/12/78 7/13/79 44 FR 44494, 7/30/79 1.8 Establishment of administrative mechanisms 12/12/78 7/13/79 44 FR 44494, 7/30/79 1.9 Separability 12/12/78 7/13/79 44 FR 44494, 7/30/79 (d) EPA-approved source specific requirements.
Rule No. Rule title State effective date EPA effective date Final rule citation, date Comments (AQ 79-02.) South Dakota State University steam generating plant 3/18/82 8/7/83 48 FR 31199, 7/7/83 (e) EPA-approved nonregulatory provisions.
Rule title State effective date EPA effective date Final rule citation, date Comments I.A. Introduction 1/17/72 7/13/72 37 FR 15080, 7/27/72 I.B. Legal Authority 1/17/72 7/13/72 37 FR 15080, 7/27/72 I.C. Control Strategy 1/17/72 7/13/72 37 FR 15080, 7/27/72 I.D. Compliance Schedule 1/17/72 7/13/72 37 FR 15080, 7/27/72 I.E. Prevention of Air Pollution Emergency Episodes 1/17/72 7/13/72 37 FR 15080, 7/27/72 I.F. Air Quality Surveillance 1/17/72 7/13/72 37 FR 15080, 7/27/72 I.G. Review of New Sources and Modifications 1/17/72 7/13/72 37 FR 15080, 7/27/72 I.H. Source Surveillance 1/17/72 7/13/72 37 FR 15080, 7/27/72 I.I. Resources 1/17/72 7/13/72 37 FR 15080, 7/27/72 I.J. Intergovernmental Cooperation 1/17/72 7/13/72 37 FR 15080, 7/27/72 I. Appendix A. South Dakota Compiled Laws 1/17/72 7/13/72 37 FR 15080, 7/27/72 II. Part D Plan for Total Suspended Particulate 12/27/78 8/30/79 44 FR 44494, 7/30/79 III. SIP to meet Air Quality Monitoring and public notification requirements 1/21/80 10/4/80 45 FR 58528, 9/4/80 IV. Lead (Pb) SIP 5/4/84 10/26/84 49 FR 37752, 9/26/84 V. Stack Height Demonstration Analysis 8/20/86 7/7/89 54 FR 24334, 6/7/89 VI. Commitment to revise stack height rules 5/11/88 10/2/88 53 FR 34077, 9/2/88 VII. PM10 Committal SIP 7/12/88 11/5/90 55 FR 40831, 10/5/90 VIII. Small Business Technical and Environmental Compliance Program 1/12/94 12/27/94 59 FR 53589, 10/25/94 IX. Commitment regarding permit exceedances of the PM10 standard in Rapid City 11/16/95 7/10/02 67 FR 39619, 6/10/02 X. CAA 110(a)(D)(2)(i) Interstate Transport Requirements for the 1997 8-hr Ozone and PM2.5 NAAQS 4/19/07 7/7/08 73 FR 26019, 5/8/08 XI. 1997 Ozone NAAQS Infrastructure Certification 2/1/08 8/22/11 76 FR 43912, 7/22/11 XII. South Dakota Regional Haze State Implementation Plan, Amended 4/26/12 5/29/12 77 FR 24845, 4/26/12 XIII. Section 110(a)(2) Infrastructure Requirements for the 1997 and 2006 PM2.5 NAAQS 3/4/11 3/2/15 80 FR 4799, 1/29/15 XIV. Section 110(a)(2) Infrastructure Requirements for the 2008 Lead NAAQS 10/10/12 3/2/15 80 FR 4799, 1/29/15 XV. Section 110(a)(3) Infrastructure Requirements for the 2008 8-hour Ozone NAAQS 5/21/13 3/2/15 80 FR 4799, 1/29/15 XVI. Section 110(a)(2) Infrastructure Requirements for the 2010 NO2 NAAQS 10/23/13 3/2/15 80 FR 4799, 1/29/15 XVII. SDCL (South Dakota Codified Laws), 1-40-25.1 3/2/15 3/2/15 80 FR 4799, 1/29/15 XVIII. South Dakota Codified Laws, 34-A-1-57, 34-A-1-58, 34-A-1-59, and 34-A-1-60 7/1/93 12/27/94 59 FR 53589, 10/25/94 XIX. Section 110(a)(2)(D)(i)(I) Interstate Transport Requirements for the 2008 8-hour Ozone NAAQS 5/21/13 3/2/15 80 FR 4799, 1/29/15 XX. Section 110(a)(2) Infrastructure Requirements for the 2010 SO2 and 2012 PM2.5 NAAQS Submitted: 12/20/2013 and 01/25/2016 8/16/2017 82 FR 38832 Excluding 110(D)(i)(I), interstate transport for the 2010 SO2 and 2012 PM2.5 NAAQS which will be acted on separately. XXI. Section 110(a)(2)(D)(i)(I) Interstate Transport Requirements for the 2012 PM2.5 NAAQS Submitted: 1/25/2016 8/6/2018 83 FR 31329, 7/5/2018 XXII. Section 110(a)(2)(D)(i)(I) Interstate Transport Requirements for the 2010 SO2 NAAQS Submitted: 12/20/2013 10/1/2018 83 FR 44503, 8/31/2018 XXIII. Regional Haze 5-Year Progress Report Submitted 01/27/2016 1/2/2019 83 FR 62268, 12/3/2018 XXVI. Section 110(a)(2) Infrastructure Requirements for the 2015 8-hour Ozone NAAQS 01/15/2020 11/25/2020 85 FR 67658, 10/26/2020 XXVII. South Dakota Codified Laws, 34A-1-2, 34A-1-58.1, 34A-1-60 and 34A-1-63 4/19/21 5/11/2022 87 FR 21026, 4/11/2022 [70 FR 11128, Mar. 8, 2005]