§ 52.2170 - Identification of plan.  


Latest version.
  • § 52.2170 Identification of plan.

    (a) Purpose and scope. This section sets forth the applicable State Implementation Plan for South Dakota under section 110 of the Clean Air Act, 42 U.S.C. 7410 and 40 CFR part 51 to meet national ambient air quality standards or other requirements under the Clean Air Act.

    (b) Incorporation by reference.

    (1) Material listed in paragraphs (c) and (d) of this section with an EPA approval date prior to October 1, 2015, was approved for incorporation by reference by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Material is incorporated as it exists on the date of the approval, and notice of any change in the material will be published in the Federal Register. Entries in paragraphs (c) and (d) of this section with EPA approval dates after October 1, 2015, will be incorporated by reference in the next update to the SIP compilation.

    (2) EPA Region 8 certifies that the rules/regulations provided by EPA in the SIP compilation at the addresses in paragraph (b)(3) of this section are an exact duplicate of the officially promulgated state rules/regulations which have been approved as part of the SIP as of October 1, 2015.

    (3) Copies of the materials incorporated by reference may be inspected at the EPA Region 8 Office, Office of Partnerships and Regulatory Assistance (OPRA), Air Program, 1595 Wynkoop Street, Denver, Colorado 80202-1129.

    (c) EPA-approved regulations.

    Rule No. Rule title State effective date EPA effective date Final rule citation, date Comments
    Statewide
    74:09:01. Procedures - Board of Minerals and Environment, Contested Case Procedure
    74:09:01:20Board member conflict of interest5/29/143/2/1580 FR 4799, 1/29/15
    74:09:01:21Board member potential conflict of interests5/29/143/2/1580 FR 4799, 1/29/15
    74:36:01. Definitions
    74:36:01:01Definitions04/19/20215/11/202287 FR 21026, 4/11/2022
    74:36:01:03Administrative permit amendment defined4/4/995/7/0368 FR 16726, 4/7/03
    74:36:01:04Affected states defined4/22/9312/18/9863 FR 55804, 10/19/98
    74:36:01:05Applicable requirements of the Clean Air Act defined11/25/201911/25/202085 FR 67658, 10/26/2020
    74:36:01:06Complete application defined4/22/9312/18/9863 FR 55804, 10/19/98
    74:36:01:08Major source defined4/4/995/19/1479 FR 21852, 4/18/14
    74:36:01:09Categories of sources defined1/2/0510/13/0671 FR 46403, 8/14/06
    74:36:01:10Modification defined10/13/1511/14/1681 FR 70628, 10/13/16
    74:36:01:11National ambient air quality standard (NAAQS)4/22/9312/18/9863 FR 55804, 10/19/98
    74:36:01:12Potential to emit defined4/22/9312/18/9863 FR 55804, 10/19/98
    74:36:01:13Process weight rate defined4/22/9312/18/9863 FR 55804, 10/19/98
    74:36:01:15Regulated air pollutant defined1/5/955/19/1479 FR 21852, 4/18/14
    74:36:01:16Responsible official defined1/2/0510/13/0671 FR 46403, 8/14/06
    74:36:01:18Municipal solid waste landfill defined12/29/9612/18/9863 FR 55804, 10/19/98
    74:36:01:19Existing municipal solid waste landfill defined11/25/201911/25/202085 FR 67658, 10/26/2020
    74:36:01:20Physical change in or change in the method of operation defined11/25/201911/25/202085 FR 67658, 10/26/2020
    74:36:01:21Commence construction defined6/28/107/28/1479 FR 36419, 6/27/14
    74:36:02. Ambient Air Quality
    74:36:02:01Air quality goals4/22/9312/18/9863 FR 55804, 10/19/98
    74:36:02:02Ambient air quality standards11/25/201911/25/202085 FR 67658, 10/26/2020
    74:36:02:03Methods of sampling and analysis11/25/201911/25/202085 FR 67658, 10/26/2020
    74:36:02:04Ambient air monitoring network11/25/201911/25/202085 FR 67658, 10/26/2020
    74:36:02:05Air quality monitoring requirements11/25/201911/25/202085 FR 67658, 10/26/2020
    74:36:03. Air Quality Episodes
    74:36:03:01Air pollution emergency episode11/25/201911/25/202085 FR 67658, 10/26/2020
    74:36:03:02Episode emergency contingency plan11/25/201911/25/202085 FR 67658, 10/26/2020
    74:36:04. Operating Permits for Minor Sources
    74:36:04:01Applicability4/22/9312/18/9863 FR 55804, 10/19/98
    74:36:04:02Minor source operating permit required6/28/107/28/1479 FR 36419, 6/27/14
    74:36:04:02.01Minor source operating permit exemption6/28/107/28/1479 FR 36419, 6/27/14
    74:36:04:03Emission unit exemptions10/13/1511/14/1681 FR 70628, 10/13/16
    74:36:04:04Standard for issuance of a minor source operating permit9/13/20177/26/201883 FR 29700, 6/26/2018
    74:36:04:05Time period for operating permits and renewals6/25/1311/2/1580 FR 59620, 10/2/15
    74:36:04:06Timely and complete application for operating permit required6/28/107/28/1479 FR 36419, 6/27/14
    74:36:04:07Required contents of complete application for operating permit6/28/107/28/1479 FR 36419, 6/27/14
    74:36:04:08Applicant required to supplement or correct application1/5/9512/18/9863 FR 55804, 10/19/98
    74:36:04:09Permit application - Completeness review6/28/107/28/1479 FR 36419, 6/27/14
    74:36:04:10Time period for department's recommendation6/28/107/28/1479 FR 36419, 6/27/14
    74:36:04:11Department's recommendation on operating permit4/4/995/7/0368 FR 16726, 4/7/03
    74:36:04:12Public participation in permitting process6/25/1311/2/1580 FR 59620, 10/2/15
    74:36:04:12.01Public review of department's draft permit6/28/107/28/1479 FR 36419, 6/27/14
    74:36:04:13Final permit decision - Notice to interested persons6/25/1311/2/1580 FR 59620, 10/2/15
    74:36:04:14Right to petition for contested case hearing6/25/1311/2/1580 FR 59620, 10/2/15
    74:36:04:15Contents of operating permit6/25/1311/2/1580 FR 59620, 10/2/15
    74:36:04:16Operating permit expiration6/28/107/28/1479 FR 36419, 6/27/14
    74:36:04:17Renewal of operating permit6/28/107/28/1479 FR 36419, 6/27/14
    74:36:04:18Operating permit revision6/28/107/28/1479 FR 36419, 6/27/14
    74:36:04:19Administrative permit amendment4/4/995/7/0368 FR 16726, 4/7/03
    74:36:04:20Procedures for administrative permit amendments6/28/107/28/1479 FR 36419, 6/27/14
    74:36:04:20.01Minor permit amendment required6/28/107/28/1479 FR 36419, 6/27/14
    74:36:04:20.02Requirements for minor permit amendment1/5/9512/18/9863 FR 55804, 10/19/98
    74:36:04:20.03Application for minor permit amendment1/5/9512/18/9863 FR 55804, 10/19/98
    74:36:04:20.04Department deadline to approve minor permit amendment6/28/107/28/1479 FR 36419, 6/27/14
    74:36:04:21Permit modifications10/13/1511/14/1681 FR 70628, 10/13/16
    74:36:04:22Source status change - new permit required4/4/995/7/0368 FR 16726, 4/7/03
    74:36:04:23Reopening operating permit for cause6/28/107/28/1479 FR 36419, 6/27/14
    74:36:04:24Procedures to reopen operating permit4/22/9312/18/9863 FR 55804, 10/19/98
    74:36:04:27Operating permit termination, revision, and revocation6/28/107/28/1479 FR 36419, 6/27/14
    74:36:04:28Notice of operating noncompliance - Contents4/22/9312/18/9863 FR 55804, 10/19/98
    74:36:04:29Petition for contested case on alleged violation4/22/9312/18/9863 FR 55804, 10/19/98
    74:36:04:31Circumvention of emissions not allowed4/22/9312/18/9863 FR 55804, 10/19/98
    74:36:04:32General permits6/28/107/28/1479 FR 36419, 6/27/14
    74:36:04:33Secretary may require an individual permit9/1/037/9/0469 FR 25839, 5/10/04
    74:36:06. Regulated Air Pollutant Emissions
    74:36:06:01Applicability1/5/9512/18/9863 FR 55804, 10/19/98
    74:36:06:02Allowable emissions for fuel-burning units4/4/995/7/0368 FR 16726, 4/7/03
    74:36:06:03Allowable emissions for process industry units4/4/995/7/0368 FR 16726, 4/7/03
    74:36:06:04Particulate emission restrictions for incinerators and waste wood burners1/2/0510/13/0671 FR 46403,8/14/06
    74:36:06:05Most stringent interpretation applicable4/22/9312/18/9863 FR 55804, 10/19/98
    74:36:06:06Stack performance test1/2/0510/13/0671 FR 46403, 8/14/06
    74:36:06:07Open burning practices prohibited9/13/20177/26/201883 FR 29700, 6/26/2018
    74:36:07. New Source Performance Standards
    74:36:07:08Ash disposal requirements12/29/966/21/0065 FR 32033, 5/22/00
    74:36:07:29Operating requirements for wire reclamation furnaces4/22/9311/6/9560 FR 46222, 9/6/95
    74:36:07:30Monitoring requirements for wire reclamation furnaces4/22/9311/6/9560 FR 46222, 9/6/95
    74:36:09. Prevention of Significant Deterioration
    74:36:09:01Applicability9/18/061/22/0872 FR 72617, 12/21/07
    74:36:09:01.01Prevention of significant deterioration permit required9/18/061/22/0872 FR 72617, 12/21/07
    74:36:09:02Prevention of Significant Deterioration11/25/201911/25/202085 FR 67658, 10/26/2020
    74:36:09:03Public participation11/25/201911/25/202085 FR 67658, 10/26/2020
    74:36:10. New Source Review
    74:36:10:01Applicability4/22/9312/18/9863 FR 55804, 10/19/98
    74:36:10:02Definitions11/25/201911/25/202085 FR 67658, 10/26/2020
    74:36:10:03.01New source review preconstruction permit required11/25/201911/25/202085 FR 67658, 10/26/2020
    74:36:10:05New source review preconstruction permit required11/25/201911/25/202085 FR 67658, 10/26/2020
    74:36:10:06Causing or contributing to a violation of any national ambient air quality standard11/14/1681 FR 70628, 10/13/16
    74:36:10:07Determining credit for emissions Offsets11/25/201911/25/202085 FR 67658, 10/26/2020
    74:36:10:08Projected actual emissions11/25/201911/25/202085 FR 67658, 10/26/2020
    74:36:10:09Clean unit test for emission units subject to lowest achievable emission rate1/2/0510/13/0671 FR 46403, 8/14/06
    74:36:10:10Clean unit test for emission units comparable to lowest achievable emission rate1/2/0510/13/0671 FR 46403, 8/14/06
    74:36:11. Performance Testing
    74:36:11:01Stack performance testing or other testing methods11/25/201911/25/202085 FR 67658, 10/26/2020
    74:36:11:02Secretary may require performance tests11/25/201911/25/202085 FR 67658, 10/26/2020
    74:36:11:03Notice to department of performance test11/25/201911/25/202085 FR 67658, 10/26/2020
    74:36:11:04Testing new fuels or raw materials11/25/201911/25/202085 FR 67658, 10/26/2020
    74:36:12. Control of Visible Emissions
    74:36:12:01Restrictions on visible emissions11/25/201911/25/202085 FR 67658, 10/26/2020
    74:36:12:02Exceptions to restrictions6/25/1311/2/1580 FR 59620, 10/2/15
    74:36:12:03Exceptions granted to alfalfa pelletizers or dehydrators11/25/201911/25/202085 FR 67658, 10/26/2020
    74:36:13. Continuous Emission Monitoring Systems
    74:36:13:01Secretary may require continuous emission monitoring systems (CEMS)4/22/9312/18/9863 FR 55804, 10/19/98
    74:36:13:02Minimum performance specifications for all continuous emission monitoring systems11/25/201911/25/202085 FR 67658, 10/26/2020
    74:36:13:03Reporting requirements11/25/201911/25/202085 FR 67658, 10/26/2020
    74:36:13:04Notice to department of exceedance11/25/201911/25/202085 FR 67658, 10/26/2020
    74:36:13:05Compliance determined by data from continuous emission monitor4/22/9312/18/9863 FR 55804, 10/19/98
    74:36:13:06Compliance certification11/25/201911/25/202085 FR 67658, 10/26/2020
    74:36:13:07Credible evidence11/25/201911/25/202085 FR 67658, 10/26/2020
    74:36:13:08Compliance assurance monitoring10/13/1511/14/1681 FR 70628, 10/13/16
    74:36:17. Rapid City Street Sanding and Deicing
    74:36:17:01Applicability2/11/968/9/0267 FR 39619, 6/10/02
    74:36:17:02Reasonable available control technology2/11/968/9/0267 FR 39619, 6/10/02
    74:36:17:03Street sanding specifications2/11/968/9/0267 FR 39619, 6/10/02
    74:36:17:04Street deicing and maintenance plan2/11/968/9/0267 FR 39619, 6/10/02
    74:36:17:05Street sanding and sweeping recordkeeping2/11/968/9/0267 FR 39619, 6/10/02
    74:36:17:06Inspection authority2/11/968/9/0267 FR 39619, 6/10/02
    74:36:18. Regulations for State Facilities in the Rapid City Area
    74:36:18:01Definitions7/1/023/22/0469 FR 2671,1/20/04
    74:36:18:02Applicability7/1/023/22/0469 FR 2671, 1/20/04
    74:36:18:03Permit required7/1/023/22/0469 FR 2671, 1/20/04
    74:36:18:04Time period for permits and renewals6/25/1311/2/1580 FR 59620, 10/2/15
    74:36:18:05Required contents of a complete application for a permit6/25/1311/2/1580 FR 59620, 10/2/15
    74:36:18:06Contents of permit6/25/1311/2/1580 FR 59620, 10/2/15
    74:36:18:07Permit expiration7/1/023/22/0469 FR 2671, 1/20/04
    74:36:18:08Renewal of permit7/1/023/22/0469 FR 2671, 1/20/04
    74:36:18:09Reasonably available control technology required7/1/023/22/0469 FR 2671, 1/20/04
    74:36:18:10Visible emission limit for construction and continuous operation activities11/25/201911/25/202085 FR 67658, 10/26/2020
    74:36:18:11Exception to visible emission limit6/25/1311/2/1580 FR 59620, 10/2/15
    74:36:18:12Notice of operating noncompliance - Contents6/25/1311/2/1580 FR 59620, 10/2/15
    74:36:20. Construction Permits for New Sources or Modifications
    74:36.20.01Applicability6/28/107/28/1479 FR 36419, 6/27/14
    74:36:20:02Construction permit required10/13/1511/14/1681 FR 70628, 10/13/16
    74:36:20:03Construction permit exemption6/28/107/28/1479 FR 36419, 6/27/14
    74:36:20:04Emission unit exemptions6/28/107/28/1479 FR 36419, 6/27/14
    74:36:20:05Standard for issuance of construction permit11/25/201911/25/202085 FR 67658, 10/26/2020
    74:36:20:06Timely and complete application for a construction permit required6/28/107/28/1479 FR 36419, 6/27/14
    74:36:20:07Required contents of complete application for a construction permit6/28/107/28/1479 FR 36419, 6/27/14
    74:36:20:08Applicant required to supplement or correct application6/28/107/28/1479 FR 36419, 6/27/14
    74:36:20:09Permit application - Completeness review6/28/107/28/1479 FR 36419, 6/27/14
    74:36:20:10Time period for department's recommendation6/28/107/28/1479 FR 36419, 6/27/14
    74:36:20:11Public participation in permitting process6/25/1311/2/1580 FR 59620, 10/2/15
    74:36:20:12Public review of department's draft permit6/28/107/28/1479 FR 36419, 6/27/14
    74:36:20:13Final permit decision - Notice to interested persons6/25/1311/2/1580 FR 59620, 10/2/15
    74:36:20:14Right to petition for contested case hearing6/25/1311/2/1580 FR 59620, 10/2/15
    74:36:20:15Contents of construction permit6/25/1311/2/1580 FR 59620, 10/2/15
    74:36:20:16Administrative permit amendment6/28/107/28/1479 FR 36419, 6/27/14
    74:36:20:17Procedures for administrative permit amendments6/28/107/28/1479 FR 36149, 6/27/14
    74:36:20:18Reopening construction permit for cause6/28/107/28/1479 FR 36419, 6/27/14
    74:36:20:19Procedures to reopen construction permit6/28/107/28/1479 FR 36149, 6/27/14
    74:36:20:20Construction permit does not exempt from other requirements6/28/107/28/1479 FR 36419, 6/27/14
    74:36:20:21Expiration of a construction permit6/28/107/28/1479 FR 36419, 6/27/14
    74:36:20:22Notice of constructing or operating noncompliance - Contents6/28/107/28/1479 FR 36419, 6/27/14
    74:36:20:23Petition for contested case on alleged violation6/28/107/28/1479 FR 36419, 6/27/14
    74:36:20:24Circumvention of emissions not allowed6/28/107/28/1479 FR 36419, 6/27/14
    74:36:21. Regional Haze Program
    74:36:21:01Applicability12/7/105/29/1277 FR 24845, 4/26/12
    74:36:21:02Definitions11/25/201911/25/202085 FR 67658, 10/26/2020
    74:36:21:03Existing stationary facility defined12/7/105/29/1277 FR 24845, 4/26/12
    74:36:21:04Visibility impact analysis11/25/201911/25/202085 FR 67658, 10/26/2020
    74:36:21:05BART determination11/25/201911/25/202085 FR 67658, 10/26/2020
    74:36:21:06BART determination for a BART-eligible coal-fired power plant9/19/115/29/1277 FR 24845, 4/26/12
    74:36:21:07Installation of controls based on visibility impact analysis or BART determination12/7/105/29/1277 FR 24845, 4/26/12
    74:36:21:08Operation and maintenance of controls12/7/105/29/1277 FR 24845, 4/26/12
    74:36:21:09Monitoring, recordkeeping, and reporting11/25/201911/25/202085 FR 67658, 10/26/2020
    74:36:21:10Permit to construct12/7/105/29/1277 FR 24845, 4/26/12
    74:36:21:11Permit required for BART determination12/7/105/29/1277 FR 24845, 4/26/12
    74:36:21:12Federal land manager notification and review12/7/105/29/1277 FR 24845, 4/26/12
    74:36:21:13Calculate a 30-day rolling average11/25/201911/25/202085 FR 67658, 10/26/2020
    Pennington
    Ordinance #12 - Fugitive Dust Regulation - 1.0 Control of Fugitive Dust
    1.1Applicability12/12/787/13/7944 FR 44494, 7/30/79
    1.2Definitions12/12/787/13/7944 FR 44494, 7/30/79
    1.3Standard of compliance12/12/787/13/7944 FR 44494, 7/30/79
    1.4Reasonably available control technology required12/12/787/13/7944 FR 44494, 7/30/79
    1.5Fugitive dust control permits required for construction activities, i.e., temporary operations12/12/787/13/7944 FR 44494, 7/30/79
    1.6Compliance plans and schedules required, i.e., continuous operations12/12/787/13/7944 FR 44494, 7/30/79
    1.7Enforcement procedures12/12/787/13/7944 FR 44494, 7/30/79
    1.8Establishment of administrative mechanisms12/12/787/13/7944 FR 44494, 7/30/79
    1.9Separability12/12/787/13/7944 FR 44494, 7/30/79

    (d) EPA-approved source specific requirements.

    Rule No. Rule title State effective date EPA effective date Final rule citation, date Comments
    (AQ 79-02.)South Dakota State University steam generating plant3/18/828/7/8348 FR 31199, 7/7/83

    (e) EPA-approved nonregulatory provisions.

    Rule title State effective date EPA effective date Final rule citation, date Comments
    I.A. Introduction1/17/727/13/7237 FR 15080, 7/27/72
    I.B. Legal Authority1/17/727/13/7237 FR 15080, 7/27/72
    I.C. Control Strategy1/17/727/13/7237 FR 15080, 7/27/72
    I.D. Compliance Schedule1/17/727/13/7237 FR 15080, 7/27/72
    I.E. Prevention of Air Pollution Emergency Episodes1/17/727/13/7237 FR 15080, 7/27/72
    I.F. Air Quality Surveillance1/17/727/13/7237 FR 15080, 7/27/72
    I.G. Review of New Sources and Modifications1/17/727/13/7237 FR 15080, 7/27/72
    I.H. Source Surveillance1/17/727/13/7237 FR 15080, 7/27/72
    I.I. Resources1/17/727/13/7237 FR 15080, 7/27/72
    I.J. Intergovernmental Cooperation1/17/727/13/7237 FR 15080, 7/27/72
    I. Appendix A. South Dakota Compiled Laws1/17/727/13/7237 FR 15080, 7/27/72
    II. Part D Plan for Total Suspended Particulate12/27/788/30/7944 FR 44494, 7/30/79
    III. SIP to meet Air Quality Monitoring and public notification requirements1/21/8010/4/8045 FR 58528, 9/4/80
    IV. Lead (Pb) SIP5/4/8410/26/8449 FR 37752, 9/26/84
    V. Stack Height Demonstration Analysis8/20/867/7/8954 FR 24334, 6/7/89
    VI. Commitment to revise stack height rules5/11/8810/2/8853 FR 34077, 9/2/88
    VII. PM10 Committal SIP7/12/8811/5/9055 FR 40831, 10/5/90
    VIII. Small Business Technical and Environmental Compliance Program1/12/9412/27/9459 FR 53589, 10/25/94
    IX. Commitment regarding permit exceedances of the PM10 standard in Rapid City11/16/957/10/0267 FR 39619, 6/10/02
    X. CAA 110(a)(D)(2)(i) Interstate Transport Requirements for the 1997 8-hr Ozone and PM2.5 NAAQS4/19/077/7/0873 FR 26019, 5/8/08
    XI. 1997 Ozone NAAQS Infrastructure Certification2/1/088/22/1176 FR 43912, 7/22/11
    XII. South Dakota Regional Haze State Implementation Plan, Amended4/26/125/29/1277 FR 24845, 4/26/12
    XIII. Section 110(a)(2) Infrastructure Requirements for the 1997 and 2006 PM2.5 NAAQS3/4/113/2/1580 FR 4799, 1/29/15
    XIV. Section 110(a)(2) Infrastructure Requirements for the 2008 Lead NAAQS10/10/123/2/1580 FR 4799, 1/29/15
    XV. Section 110(a)(3) Infrastructure Requirements for the 2008 8-hour Ozone NAAQS5/21/133/2/1580 FR 4799, 1/29/15
    XVI. Section 110(a)(2) Infrastructure Requirements for the 2010 NO2 NAAQS10/23/133/2/1580 FR 4799, 1/29/15
    XVII. SDCL (South Dakota Codified Laws), 1-40-25.13/2/153/2/1580 FR 4799, 1/29/15
    XVIII. South Dakota Codified Laws, 34-A-1-57, 34-A-1-58, 34-A-1-59, and 34-A-1-607/1/9312/27/9459 FR 53589, 10/25/94
    XIX. Section 110(a)(2)(D)(i)(I) Interstate Transport Requirements for the 2008 8-hour Ozone NAAQS5/21/133/2/1580 FR 4799, 1/29/15
    XX. Section 110(a)(2) Infrastructure Requirements for the 2010 SO2 and 2012 PM2.5 NAAQSSubmitted: 12/20/2013 and 01/25/20168/16/201782 FR 38832Excluding 110(D)(i)(I), interstate transport for the 2010 SO2 and 2012 PM2.5 NAAQS which will be acted on separately.
    XXI. Section 110(a)(2)(D)(i)(I) Interstate Transport Requirements for the 2012 PM2.5 NAAQSSubmitted: 1/25/20168/6/201883 FR 31329, 7/5/2018
    XXII. Section 110(a)(2)(D)(i)(I) Interstate Transport Requirements for the 2010 SO2 NAAQSSubmitted: 12/20/201310/1/201883 FR 44503, 8/31/2018
    XXIII. Regional Haze 5-Year Progress ReportSubmitted 01/27/20161/2/201983 FR 62268, 12/3/2018
    XXVI. Section 110(a)(2) Infrastructure Requirements for the 2015 8-hour Ozone NAAQS01/15/202011/25/202085 FR 67658, 10/26/2020
    XXVII. South Dakota Codified Laws, 34A-1-2, 34A-1-58.1, 34A-1-60 and 34A-1-634/19/215/11/202287 FR 21026, 4/11/2022

    [70 FR 11128, Mar. 8, 2005]