Code of Federal Regulations (Last Updated: November 8, 2024) |
Title 40 - Protection of Environment |
Chapter I - Environmental Protection Agency |
SubChapter C - Air Programs |
Part 52 - Approval and Promulgation of Implementation Plans |
Subpart SS - Texas |
§ 52.2270 - Identification of plan.
-
§ 52.2270 Identification of plan.
(a) Purpose and scope. This section sets forth the applicable State Implementation Plan (SIP) for Texas under section 110 of the Clean Air Act, 42 U.S.C. 7410, and 40 CFR part 51 to meet national ambient air quality standards.
(b) Incorporation by reference.
(1) Material listed in paragraphs (c) and (d) of this section with an EPA approval date prior to December 31, 1998, were approved for incorporation by reference by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Material is incorporated as it exists on the date of the approval, and notice of any change in the material will be published in the Federal Register. Entries in paragraphs (c) and (d) of this section with EPA approval dates after December 31, 1998, will be incorporated by reference in the next update to the SIP compilation.
(2) EPA Region 6 certifies that the rules/regulations provided by EPA in the SIP compilation at the addresses in paragraph (b)(3) are an exact duplicate of the officially promulgated State rules/regulations which have been approved as part of the State Implementation Plan as of December 31, 1998.
(3) Copies of the materials incorporated by reference may be inspected at https://www.epa.gov/sips-tx or the Environmental Protection Agency, Region 6, 1201 Elm Street, Suite 500, Dallas, Texas 75270–2102. If you wish to obtain material from the EPA Regional Office, please call (800) 887–6063 or (214) 665–2760.
(c) EPA approved regulations.
EPA Approved Regulations in the Texas SIP
State citation Title/Subject State approval/Submittal date EPA approval date Explanation Chapter 19—Electronic Reporting Subchapter A—General Provisions Section 19.1 Definitions 2/7/2007 July 23, 2010, 75 FR 43062 Section 19.3 Applicability 2/7/2007 July 23, 2010, 75 FR 43062 Subchapter B—Electronic Reporting Requirements Section 19.10 Use of Electronic Document Receiving System 2/7/2007 July 23, 2010, 75 FR 43062 Section 19.12 Authorized Electronic Signature 2/7/2007 July 23, 2010, 75 FR 43062 Section 19.14 Enforcement 2/7/2007 July 23, 2010, 75 FR 43062 Chapter 39—Public Notice Subchapter H—Applicability and General Provisions Section 39.402 Applicability to Air Quality Permits and Permit Amendments 6/2/2010 10/6/2015, 80 FR 60296 SIP includes 39.402 (a)(1)–(a)(6), (a)(8), (a)(11), and (a)(12). Section 39.405 General Notice Provisions 8/25/2021 8/24/2023, 88 FR 57884 Section 39.407 Mailing Lists 9/2/1999 1/6/2014, 79 FR 551 Section 39.409 Deadline for Public Comment, and Requests for Reconsideration, Contested Case Hearing, or Notice and Comment Hearing 6/2/2010 1/6/2014, 79 FR 551 Section 39.411 Text of Public Notice 4/22/2020 8/24/2023, 88 FR 57884 Section 39.412 Combined Notice for Certain Greenhouse Gases Permit Applications 8/25/2021 8/24/2023, 88 FR 57884 Section 39.418 Notice of Receipt of Application and Intent to Obtain Permit 8/25/2021 8/24/2023, 88 FR 57844 Section 39.419 Notice of Application and Preliminary Decision 8/25/2021 8/24/2023, 88 FR 57844 Section 39.420 Transmittal of the Executive Director's Response to Comments and Decisions 4/22/2020 8/24/2023, 88 FR 57844 Section 39.426 Alternative Language Requirements 8/25/2021 8/24/2023, 88 FR 57844 Subchapter K—Public Notice of Air Quality Applications Section 39.601 Applicability 4/22/2020 8/24/2023, 88 FR 57844 Section 39.602 Mailed Notice 8/25/2021 8/24/2023, 88 FR 57844 Section 39.603 Newspaper Notice 4/22/2020 8/24/2023, 88 FR 57844 Section 39.604 Sign-Posting 8/25/2021 8/24/2023, 88 FR 57844 Section 39.605 Notice to Affected Agencies 6/2/2010 1/6/2014, 79 FR 551 Chapter 55—Requests for Reconsideration and Contested Case Hearings; Public Comment Subchapter E—Public Comment and Public Meetings Section 55.150 Applicability 6/14/2006 1/6/2014, 79 FR 551 Section 55.152 Public Comment Period 5/9/2018 7/12/2019, 84 FR 33173 SIP includes 55.152(a)(1), (a)(2), (a)(3), (a)(4), (a)(7), (a)(8) and (b). Section 55.154 Public Meetings 8/25/2021 8/24/2023, 88 FR 57844 Section 55.156 Public Comment Processing 8/25/2021 8/24/2023, 88 FR 57844 Chapter 101—General Air Quality Rules Subchapter A—General Rules Section 101.1 Definitions 7/6/2016 6/8/2017, 82 FR 26598 Section 101.2 Multiple air Contaminant Sources or Properties 4/13/73 06/22/73, 38 FR 16568 Ref 52.2299(c)(7). Section 101.3 Circumvention 4/13/73 06/22/73, 38 FR 16568 Ref 52.2299(c)(7). Section 101.4 Nuisance 4/13/73 06/22/73, 38 FR 16568 Ref 52.2299(c)(7). Section 101.5 Traffic Hazard 4/13/73 06/22/73, 38 FR 16568 Ref 52.2299(c)(7). Section 101.8 Sampling 12/11/73 1/27/82, 47 FR 03767 Ref 52.2299(c)(33). Section 101.9 Sampling Ports 04/13/73 06/22/73, 38 FR 16568 Ref 52.2299(c)(7). Section 101.10 Emissions Inventory Requirements 7/6/2016 6/8/2017, 82 FR 26598 Section 101.13 Use and Effect of Rules 4/13/73 06/22/73, 38 FR 16568 Ref 52.2299(c)(7). Section 101.14 Sampling Procedures and Terminology 4/13/73 06/22/73, 38 FR 16568 Ref 52.2299(c)(7). Section 101.18 Remedies Cumulative 4/13/73 06/22/73, 38 FR 16568 Ref 52.2299(c)(7). Section 101.19 Severability 4/13/73 06/22/73, 38 FR 16568 Ref 52.2299(c)(7). Section 101.20 Compliance with Environmental Protection Agency Standards 05/09/75
07/26/856/1/77, 42 FR 27894
06/24/92, 57 FR 28093Rule 23 Ref, 52.2299(c)(10)
Section 101.20(3), Ref 52.2299(c)(73).
(1) and (2) NOT IN SIP.Section 101.21 The National Primary and Secondary Air Quality Standards 05/09/75 6/1/77, 42 FR 27894 Ref 52.2299(c)(10). Section 101. Rule 16 Invoking Jurisdiction 4/13/73 6/22/73, 38 FR 16568 Ref 52.2299(c)(7). Not in current Texas General Rules. Section 101. Rule 19 Initiation of Review 4/13/73 06/22/73, 38 FR 16568 Ref 52.2299(c)(7). Not in current Texas General Rules. Subchapter B—Failure to Attain Fee Section 101.100 Definitions 5/22/2013 2/14/2020, 85 FR 8426 Section 101.101 Applicability 5/22/2013 2/14/2020, 85 FR 8426 Section 101.102 Equivalent Alternative Fee 5/22/2013 2/14/2020, 85 FR 8426 Section 101.104 Equivalent Alternative Fee Accounting 5/22/2013 2/14/2020, 85 FR 8426 Section 101.106 Baseline Amount Calculation 5/22/2013 2/14/2020, 85 FR 8426 Section 101.107 Aggregated Baseline Amount 5/22/2013 2/14/2020, 85 FR 8426 Section 101.108 Alternative Baseline Amount 5/22/2013 2/14/2020, 85 FR 8426 Section 101.109 Adjustment of Baseline Amount 5/22/2013 2/14/2020, 85 FR 8426 Section 101.110 Baseline Amount for New Major Stationary Source, New Construction at a Major Stationary Source, or Major Stationary Sources with Less Than 24 Months of Operation 5/22/2013 2/14/2020, 85 FR 8426 Section 101.113 Failure to Attain Fee Obligation 5/22/2013 2/14/2020, 85 FR 8426 Section 101.116 Failure to Attain Fee Payment 5/22/2013 2/14/2020, 85 FR 8426 Section 101.117 Compliance Schedule 5/22/2013 2/14/2020, 85 FR 8426 Section 101.118(a)(1) and (a)(3) Cessation of Program 5/22/2013 2/14/2020, 85 FR 8426 SIP does not include 101.118(a)(2) or 101.118(b). Section 101.120 Eligibility for Equivalent Alternative Obligation 5/22/2013 2/14/2020, 85 FR 8426 Section 101.121 Equivalent Alternative Obligation 5/22/2013 2/14/2020, 85 FR 8426 Section 101.122 Using Supplemental Environmental Project to Fulfill an Equivalent Alternative Obligation 5/22/2013 2/14/2020, 85 FR 8426 Subchapter F—Emissions Events and Scheduled Maintenance, Startup, and Shutdown Activities Division 1—Emissions Events Section 101.201 Emissions Event Reporting and Recordkeeping Requirements 3/26/2014 11/10/2014, 79 FR 66626 101.201(h) is not in the SIP. Division 2—Maintenance, Startup, and Shutdown Activities Section 101.211 Scheduled Maintenance, Startup, and Shutdown Reporting and Recordkeeping Requirements 1/23/06 11/10/10, 75 FR 68989 101.211(f) is not in the SIP. Division 3—Operational Requirements, Demonstrations, and Actions to Reduce Excessive Emissions Section 101.221 Operational Requirements 1/23/06 11/10/10, 75 FR 68989 Section 101.222 Demonstrations 1/23/06 11/10/10, 75 FR 68989 The SIP does not include 101.222(h), 101.222 (i), and 101.222 (j). See section 52.2273(e). Section 101.223 Actions to Reduce Excessive Emissions 1/23/06 11/10/10, 75 FR 68989 Section 101.224 Temporary Exemptions During Drought Conditions 8/21/02 03/30/05, 70 FR 16129 Division 4—Variances Section 101.231 Petition for Variance 08/21/02 03/30/05, 70 FR 16129 Section 101.232 Effect of Acceptance of Variance or Permit 08/21/02 03/30/05, 70 FR 16129 Section 101.233 Variance Transfers 08/21/02 03/30/05, 70 FR 16129 Subchapter H—Emissions Banking and Trading Division 1—Emission Credit Program Section 101.300 Definitions 09/20/2017 12/7/2017, 82 FR 57679 Section 101.301 Purpose 6/3/2015 5/11/2017, 82 FR 21925 Section 101.302 General Provisions 09/20/2017 12/7/2017, 82 FR 57679 Section 101.303 Emission Reduction Credit Generation and Certification 09/20/2017 12/7/2017, 82 FR 57679 Section 101.304 Mobile Emission Reduction Credit Generation and Certification 09/20/2017 12/7/2017, 82 FR 57679 Section 101.305 Emission Reductions Achieved Outside the United States 10/4/2006 5/18/10, 75 FR 27647 Section 101.306 Emission Credit Use 4/22/2020 8/24/2023, 88 FR 57844 Section 101.309 Emission Credit Banking and Trading 6/3/2015 5/11/2017, 82 FR 21925 Section 101.311 Program Audits and Reports 11/10/04 9/6/06, 71 FR 52698 Division 2—Emissions Banking and Trading of Allowances Section 101.330 Definitions 12/16/1999 1/3/2011, 76 FR 16. Section 101.331 Applicability 12/16/1999 1/3/2011, 76 FR 16. Section 101.332 General Provisions 12/16/1999 1/3/2011, 76 FR 16. Section 101.333 Allocation of Allowances 08/09/2000 1/3/2011, 76 FR 16. Section 101.334 Allowance Deductions 12/16/1999 1/3/2011, 76 FR 16. Section 101.335 Allowance Banking and Trading 12/16/1999 1/3/2011, 76 FR 16. Section 101.336 Emission Monitoring, Compliance Demonstration, and Reporting 12/16/1999 1/3/2011, 76 FR 16. Section 101.338 Emission Reductions Achieved Outside the United States 10/4/2006 1/3/2011, 76 FR 16. Section 101.339 Program Audits and Reports 10/4/2006 1/3/2011, 76 FR 16. Division 3—Mass Emissions Cap and Trade Program Section 101.350 Definitions 6/3/2015 5/11/2017, 82 FR 21925 Section 101.351 Applicability 6/3/2015 5/11/2017, 82 FR 21925 Section 101.352 General Provisions 6/3/2015 5/11/2017, 82 FR 21925 Section 101.353 Allocation of Allowances 6/3/2015 5/11/2017, 82 FR 21925 Section 101.354 Allowance Deductions 6/3/2015 5/11/2017, 82 FR 21925 Section 101.356 Allowance Banking and Trading 6/3/2015 5/11/2017, 82 FR 21925 Section 101.357 Use of Emission Reductions Generated from the Texas Emissions Reduction Plan (TERP) 3/13/2002 5/11/2017, 82 FR 21925 Section 101.359 Reporting 6/3/2015 5/11/2017, 82 FR 21925 Section 101.360 Level of Activity Certification 6/3/2015 5/11/2017, 82 FR 21925 Section 101.363 Program Audits and Reports 09/26/01 11/14/01, 66 FR 57252 Division 4—Discrete Emission Credit Program Section 101.370 Definitions 09/20/2017 12/7/2017, 82 FR 57679 Section 101.371 Purpose 6/3/2015 5/11/2017, 82 FR 21925 Section 101.372 General Provisions 09/20/2017 12/7/2017, 82 FR 57679 Section 101.373 Discrete Emission Reduction Credit Generation and Certification 09/20/2017 12/7/2017, 82 FR 57679 Section 101.374 Mobile Discrete Emission Reduction Credit Generation and Certification 09/20/2017 12/7/2017, 82 FR 57679 Section 101.375 Emission Reductions Achieved Outside the United States 10/4/2006 5/18/2010, 75 FR 27644 Section 101.376 Discrete Emission Credit Use 09/20/2017 12/7/2017, 82 FR 57679 Section 101.378 Discrete Emission Credit Banking and Trading 6/3/2015 5/11/2017, 82 FR 21925 Section 101.379 Program Audits and Reports 6/3/2015 5/11/2017, 82 FR 21925 Division 6—Highly Reactive Volatile Organic Compound Emissions Cap and Trade Program Section 101.390 Definitions 6/3/2015 5/11/2017, 82 FR 21925 Section 101.391 Applicability 6/3/2015 5/11/2017, 82 FR 21925 Section 101.392 Exemptions 6/3/2015 5/11/2017, 82 FR 21925 Section 101.393 General Provisions 6/3/2015 5/11/2017, 82 FR 21925 Section 101.394 Allocation of Allowances 6/3/2015 5/11/2017, 82 FR 21925 Section 101.396 Allowance Deductions 6/3/2015 5/11/2017, 82 FR 21925 Section 101.399 Allowance Banking and Trading 6/3/2015 5/11/2017, 82 FR 21925 Section 101.400 Reporting 6/3/2015 5/11/2017, 82 FR 21925 Section 101.401 Level of Activity Certification 4/6/2010 1/2/2014, 79 FR 57 Section 101.399 Allowance Banking and Trading 12/01/04 9/6/06, 71 FR 52659 Section 101.400 Reporting 12/1/4 9/6/06, 71 FR 52659 Section 101.401 Level of activity certification 2/1/4 9/6/06, 71 FR 52659 Section 101.403 Program audits and reports 12/01/04 9/6/06, 71 FR 52659 Division 7—Clean Air Interstate Rule Section 101.503 Clean Air Interstate Rule Oxides of Nitrogen Annual Trading Budget 7/12/06 7/30/07, 72 FR 41453 Section 101.504 Timing Requirements for Clean Air Interstate Rule Oxides of Nitrogen Allowance Allocations 07/12/06 07/30/, 72 FR 41453 Subsections 101.504(a)(2), 101.504(a)(3), 101.504(a)(4), 101.504(c), and 101.504(d) NOT IN SIP. Section 101.506 Clean Air Interstate Rule Oxides of Nitrogen Allowance Allocations 07/12/06 07/30/, 72 FR 41453 Subsections 101.506(a)(2), 101.506(b)(2), 101.506(b)(3), and 101.506(g) NOT IN SIP. Section 101.508 Compliance Supplement Pool 07/12/06 07/30/07, 72 FR 41453 Chapter 106—Permits by Rule Subchapter A—General Requirements Section 106.1 Purpose 08/09/00 11/14/03, 68 FR 64548 Section 106.2 Applicability 3/26/2014 11/10/2014, 79 FR 66626 Section 106.4 Requirements for Permitting by Rule 3/26/2014 11/10/2014, 79 FR 66626 The SIP approved provisions at 30 TAC Section 106.4(a)(1), (a)(3), and (a)(4) are those adopted by the State as of 4/20/2011. Section 106.6 Registration of Emissions 11/20/02 11/14/03, 68 FR 64548 Section 106.8 Recordkeeping 10/10/01 11/14/03, 68 FR 64548 Section 106.13 References to Standard Exemptions and Exemptions from Permitting 08/09/00 11/14/03, 68 FR 64548 Subchapter B—Registration Fees for New Permits by Rule Section 106.50 Registration Fees for Permits by Rule 9/25/2002 3/20/2009, 74 FR 11851. Chapter 111 (Reg 1)—Control of Air Pollution from Visible Emissions and Particulate Matter Subchapter A: Visible Emissions and Particulate Matter Division 1: Visible Emissions Section 111.111(a), (b) Requirements for Specified Sources 6/18/1993 5/8/1996, 61 FR 20732 Section 111.111(c) Requirements for Specified Sources 10/25/1991 1/18/1994, 59 FR 2532 Section 111.113 Alternative Opacity Limitations 6/16/1989 5/8/1996, 61 FR 20732 Division 2: Incineration Section 111.121 Single-Chamber Incineration 6/16/1989 4/28/2009, 74 FR 19144 Division 4: Materials Handling, Construction, Roads, Streets, Alleys, and Parking Lots Section 111.141 Geographic Areas of Application and Date of Compliance 10/25/1991 1/18/1994, 59 FR 02532 Section 111.143 Materials Handling 6/16/1989 1/18/1994, 59 FR 02532 Section 111.145 Construction and Demolition 10/25/1991 1/18/1994, 59 FR 02532 Section 111.147 Roads, Streets, and Alleys 1/25/2012 12/14/2015, 80 FR 77254 Section 111.149 Parking Lots 6/16/1989 1/18/1994, 59 FR 02532 Division 5: Emission Limits on Nonagricultural Processes Section 111.151 Allowable Emissions Limits 6/16/1989 4/28/2009, 74 FR 19144 Section 111.153 Emission Limits for Steam Generators 6/16/1989 4/28/2009, 74 FR 19144 Division 6: Emission Limits on Agricultural Processes Section 111.171 Emission Limits Based on Process Weight Method 6/16/1989 4/28/2009, 74 FR 19144 Section 111.173 Emissions Limits Based on Alternate Method 6/16/1989 4/28/2009, 74 FR 19144 Section 111.175 Exemptions 6/16/1989 4/28/2009, 74 FR 19144 Division 7: Exemptions for Portable or Transient Operations Section 111.181 Exemption Policy 6/16/1989 4/28/2009, 74 FR 19144 Section 111.183 Requirements for Exemptions 6/16/1989 4/28/2009, 74 FR 19144 Subchapter B: Outdoor Burning Section 111.201 General Prohibitions 8/21/1996 4/28/2009, 74 FR 19144 Section 111.203 Definitions 7/7/2017 4/27/2018, 83 FR 18430 Section 111.205 Exceptions for Fire Training 8/21/1996 4/28/2009, 74 FR 19144 Section 111.207 Exceptions for Fires Used for Recreation, Ceremony, Cooking, and Warmth 8/21/1996 4/28/2009, 74 FR 19144 Section 111.209 Exception for Disposal Fires 10/22/2021 2/7/2023, 88 FR 7882 Section 111.211 Exception for Prescribed Burn 1/15/2014 1/11/2017, 82 FR 3172 Section 111.213 Exception for Hydrocarbon Burning 8/21/1996 4/28/2009, 74 FR 19144 Section 111.215 Executive Director Approval of Otherwise Prohibited Outdoor Burning 8/21/1996 4/28/2009, 74 FR 19144 Section 111.217 Requirements for Certified and Insured Prescribed Burn Managers 7/7/2017 4/27/2018, 83 FR 18430 Section 111.219 General Requirements for Allowable Outdoor Burning 8/21/1996 4/28/2009, 74 FR 19144 Section 111.221 Responsibility for Consequences of Outdoor Burning 8/21/1996 4/28/2009, 74 FR 19144 Chapter 112 (Reg 2)—Control of Air Pollution From Sulfur Compounds Section 112.1 Definitions 09/18/92 08/30/93, 58 FR 45456 Ref 52.2299(c)(76). Section 112.2 Compliance, Reporting, and Recordkeeping 09/18/92 08/30/93, 58 FR 45456 Ref 52.2299(c)(76). Section 112.3 Net Ground Level Concentrations 09/18/92 08/30/93, 58 FR 45456 Ref 52.2299(c)(76). Section 112.4 Net Ground Level Concentrations—Exemption Conditions 09/18/92 08/30/93, 58 FR 45456 Ref 52.2299(c)(76). Section 112.5 Allowable Emission Rates—Sulfuric Acid Plant Burning Elemental Sulfur 09/18/92 08/30/93, 58 FR 45456 Ref 52.2299(c)(76). Section 112.6 Allowable Emission Rates—Sulfuric Acid Plant 09/18/92 08/30/93, 58 FR 45456 Ref 52.2299(c)(76). Section 112.7 Allowable Emission Rates—Sulfur Recovery Plant 09/18/92 08/30/93, 58 FR 45456 Ref 52.2299(c)(76). Section 112.8 Allowable Emissions Rates from Solid Fossil Fuel-Fired Steam Generators 09/18/92 02/18/97, 62 FR 07163 Ref 52.2299(c)(101). Section 112.9 Allowable Emission Rates—Combustion of Liquid Fuel 09/18/92 08/30/93, 58 FR 45456 Ref 52.2299(c)(76). Section 112.14 Allowable Emission Rates—Nonferrous Smelter Processes 09/18/92 08/30/93, 58 FR 45456 Ref 52.2299(c)(76). Section 112.15 Temporary Fuel Shortage Plan Filing Requirements 09/18/92 08/30/93, 58 FR 45456 Ref 52.2299(c)(76). Section 112.16 Temporary Fuel Shortage Plan Operating Requirements 09/18/92 08/30/93, 58 FR 45456 Ref 52.2299(c)(76). Section 112.17 Temporary Fuel Shortage Plan Notification Procedures 09/18/92 08/30/93, 58 FR 45456 Ref 52.2299(c)(76) Section 112.18 Temporary Fuel Shortage Plan Reporting Requirements 09/18/92 08/30/93, 58 FR 45456 Ref 52.2299(c)(76) Section 112.19 Application for Area Control Plan 09/18/92 08/30/93, 58 FR 45456 Ref 52.2299(c)(76) Section 112.20 Exemption Procedure 09/18/92 08/30/93, 58 FR 45456 Ref 52.2299(c)(76) Section 112.21 Allowable Emission Rates Under Area Control Plan 09/18/92 08/30/93, 58 FR 45456 Ref 52.2299(c)(76) Section 112.41 to 112.47 Control of Sulfuric Acid 05/12/89 NOT in SIP but is a part of the EPA approved Texas 111(d) Plan Section 112.51 to 112.59 Control of Total Reduced Sulfur (TRS) 05/12/89 NOT in SIP but is a part of the EPA approved Texas 111(d) Plan. Chapter 114 (Reg 4)—Control of Air Pollution from Motor Vehicles Subchapter A—Definitions Section 114.1 Definitions 2/12/2014 10/7/2016, 81 FR 69684 Section 114.2 Inspection and Maintenance Definitions 4/29/2015 10/7/2016, 81 FR 69684 Section 114.5 Transportation Planning Definition 05/03/00 12/5/02, 67 FR 72382 Section 114.6 Low Emission Fuel Definitions 8/22/12 5/6/13, 78 FR 26255 Subchapter C—Vehicle Inspection and Maintenance; Low Income Vehicle Repair Assistance, Retrofit, and Accelerated Vehicle Retirement Program; and Early Action Compact Counties Division 1: Vehicle Inspection and Maintenance Section 114.50 Vehicle Emission Inspection Requirements 2/12/2014 10/7/2016, 81 FR 69679 Subsection 114.50(b)(2) is NOT part of the approved SIP. Section 114.51 Equipment Evaluation Procedures for Vehicle Gas Analyzers 11/18/2010 7/25/2014, 79 FR 43264 Section 114.53 Inspection and Maintenance Fees 4/29/2015 10/7/2016, 81 FR 69684 Division 3: Early Action Compact Counties Section 114.80 Applicability 11/17/04 8/8/05, 70 FR 45542 Section 114.81 Vehicle Emissions Inspection Requirements 11/17/04 8/8/05, 70 FR 45542 Section 114.82 Control Requirements 2/12/2014 10/7/2016, 81 FR 69684 Section 114.83 Waivers and Extensions 2/12/2014 10/7/2016, 81 FR 69684 Section 114.84 Prohibitions 2/12/2014 10/7/2016, 81 FR 69684 Section 114.85 Equipment Evaluation Procedures for Vehicle Exhaust Gas Analyzers 11/17/04 8/8/05, 70 FR 45542 Section 114.87 Inspection and Maintenance Fees 4/29/2015 10/7/2016, 81 FR 69684 Subchapter D—Oxygen Requirements for Gasoline Section 114.100 Oxygenated Fuels 1/20/2017 2/27/2018, 83 FR 8361 Subchapter G—Transportation Planning Section 114.260 Transportation Conformity 6/27/2007 11/12/2014, 79 FR 67071 Section 114.270 Transportation Control Measures 6/27/2007 1/31/2014, 79 FR 5287 Subchapter H—Low Emission Fuels Division 1: Gasoline Volatility Section 114.301 Control Requirements for Reid Vapor Pressure 4/25/00 4/26/01, 66 FR 20931 Part (c) is not approved. Section 114.305 Approved Test Methods 1/20/2017 2/27/2018, 83 FR 8361 Section 114.306 Recordkeeping Requirements 4/25/2000 4/26/2001, 66 FR 20927 Not in SIP: 114.306(c) Section 114.307 Exemptions 9/10/2014 7/20/2015, 80 FR 42732 Section 114.309 Affected Counties 9/10/2014 7/20/2015, 80 FR 42732 Division 2: Low Emission Diesel Section 114.312 Low Emission Diesel Standards 8/22/12 5/6/13, 78 FR 26255 Section 114.313 Designated Alternative Limits 8/22/12 5/6/13, 78 FR 26255 Section 114.314 Registration of Diesel Producers and Importers 8/22/12 5/6/13, 78 FR 26255 Section 114.315 Approved Test Methods 8/22/12 5/6/13, 78 FR 26255 Section 114.316 Monitoring, Recordkeeping, and Reporting Requirements 8/22/12 5/6/13, 78 FR 26255 Section 114.317 Exemptions to Low Emission Diesel Requirements 8/22/12 5/6/13, 78 FR 26255 Section 114.318 Alternative Emission Reduction Plan 8/22/12 5/6/13, 78 FR 26255 Section 114.319 Affected Counties and Compliance Dates 8/22/12 5/6/13, 78 FR 26255 Subchapter I—Non-Road Engines Division 3—Non-Road Large Spark-Ignition Engines Section 114.420 Definitions 4/19/00 11/14/01, 66 FR 57222 Section 114.421 Emission Specifications 12/06/00 11/14/01, 66 FR 57222 Section 114.422 Control Requirements 4/19/00 11/14/01, 66 FR 57222 Section 114.427 Exemptions 4/19/00 11/14/01, 66 FR 57222 Section 114.429 Affected Counties and Compliance Schedules 12/6/00 11/14/01, 66 FR 57222 Subchapter J—Operational Controls for Motor Vehicles Division 2: Locally Enforced Motor Vehicle Idling Limitations Section 114.510 Definitions 11/17/04 4/11/05, 70 FR 18308 Section 114.511 Applicability 11/17/04 4/11/05, 70 FR 18308 Section 114.512 Control Requirements for Motor Vehicle Idling 7/20/2011 7/25/2014, 79 FR 43264 Section 114.517 Exemptions 8/8/2012 7/25/2014, 79 FR 43264 Subchapter K—Mobile Source Incentive Programs Division 3: Diesel Emissions Reduction Incentive Program for On-Road and Non-Road Vehicles Section 114.620 Definitions 4/4/2018 10/4/2018, 83 FR 50021 Section 114.621 Applicability 1/28/04 08/19/05, 70 FR 48647 Section 114.622 Incentive Program Requirements 6/10/2020 5/27/2021, 86 FR 28496 Section 114.623 Small Business Incentives 4/4/2018 10/4/2018, 83 FR 50021 Section 114.624 Rebate Grant Process 9/20/2006 4/9/2010, 75 FR 18061 Section 114.626 Monitoring, Recordkeeping, and Reporting Requirements 8/22/01 08/19/05, 70 FR 48647 Section 114.629 Affected Counties and Implementation Schedule 6/10/2020 5/27/2021, 86 FR 28496 Division 4: Texas Clean School Bus Program Section 114.640 Definitions 3/26/2014 6/9/2017, 82 FR 26756 Section 114.642 Applicability 3/26/2014 6/9/2017, 82 FR 26756 Section 114.644 Clean School Bus Program Requirements 3/26/2014 6/9/2017, 82 FR 26756 Section 114.646 Monitoring, Recordkeeping, and Reporting Requirements 3/26/2014 6/9/2017, 82 FR 26756 Section 114.648 Expiration 3/26/2014 6/9/2017, 82 FR 26756 Division 5: Texas Clean Fleet Program Section 114.650 Definitions 4/4/2018 10/4/2018, 83 FR 50021 Section 114.651 Applicability 4/4/2018 10/4/2018, 83 FR 50021 Section 114.652 Qualifying Vehicles 4/4/2018 10/4/2018, 83 FR 50021 Section 114.653 Grant Eligibility 4/4/2018 10/4/2018, 83 FR 50021 Section 114.654 Usage and Disposition 3/28/2012 1/31/2014, 79 FR 5287 Section 114.655 Grant Restrictions 2/24/2010 1/31/2014, 79 FR 5287 Section 114.656 Eligible Grant Amounts 4/9/2014 6/9/2017, 82 FR 26756 Section 114.657 Reporting Requirements 2/24/2010 1/31/2014, 79 FR 5287 Section 114.658 Implementation Schedule 2/24/2010 1/31/2014, 79 FR 5287 Division 8: Drayage Truck Incentive Program Section 114.680 Definitions 4/4/2018 10/4/2018, 83 FR 50021 Section 114.681 Applicability 4/4/2018 10/4/2018, 83 FR 50021 Section 114.682 Eligible Vehicle Models 4/4/2018 10/4/2018, 83 FR 50021 Section 114.680 Definitions 8/3/2016 6/9/2017, 82 FR 26756 Section 114.681 Applicability 4/9/2014 6/9/2017, 82 FR 26756 Section 114.682 Eligible Vehicle Models 8/3/2016 6/9/2017, 82 FR 26756 Texas Department of Transportation Regulation—31 TAC Chapter 17—Vehicle Titles and Registration Section 17.80 Vehicle Emissions Verification System 11/09/93 08/22/94, 59 FR 43046 Ref 52.2299 (c)(87)(i)(F). Texas Department of Public Safety—37 TAC Chapter 23—Vehicle Inspection Section 23.93 Vehicle Emissions Inspection Requirements 10/26/2005 7/25/2014, 79 FR 43264 Chapter 115 (Reg 5)—Control of Air Pollution From Volatile Organic Compounds Subchapter A—Definitions Section 115.10 Covered Attainment Counties 6/15/2015 12/21/2017, 82 FR 60547 Subchapter B—General Volatile Organic Compound Sources Division 1: Storage of Volatile Organic Compounds Section 115.110 Applicability and Definitions 6/15/2015 12/21/2017, 82 FR 60547 Section 115.111 Exemptions 7/20/2021 8/15/2023, 88 FR 55382 Section 115.112 Control Requirements 7/20/2021 8/15/2023, 88 FR 55382 Section 115.113 Alternate Control Requirements 12/1/2011 9/9/2014, 79 FR 53302 Section 115.114 Inspection Requirements 12/15/2016 4/30/2019, 84 FR 18150 Section 115.115 Monitoring Requirements 6/15/2015 12/21/2017, 82 FR 60547 Section 115.116 Testing Requirements 12/1/2011 9/9/2014, 79 FR 53302 Section 115.117 Approved Test Methods 6/15/2015 12/21/2017, 82 FR 60547 Section 115.118 Recordkeeping Requirements 12/15/2016 4/30/2019, 84 FR 18150 Section 115.119 Compliance Schedules 7/20/2021 Division 2: Vent Gas Control Section 115.120 Vent Gas Definitions 12/13/02 02/27/08, 73 FR 10383 Section 115.121 Emissions Specifications 7/20/2021 8/15/2023, 88 FR 55382 Section 115.122 Control Requirements 6/15/2015 12/21/2017, 82 FR 60547 Section 115.123 Alternate Control Requirements 12/13/02 02/27/08, 73 FR 10383 Section 115.125 Testing Requirements 6/15/2015 12/21/2017, 82 FR 60547 Section 115.126 Monitoring and Recordkeeping Requirements 6/15/2015 12/21/2017, 82 FR 60547 Section 115.127 Exemptions 6/15/2015 12/21/2017, 82 FR 60547 Section 115.129 Counties and Compliance Schedules 6/15/2015 12/21/2017, 82 FR 60547 Division 3: Water Separation Section 115.131 Emission Specifications 5/4/94 5/22/97, 62 FR 27964 Section 115.132 Control Requirements 4/26/02 02/27/08, 73 FR 10383 Section 115.133 Alternate Control Requirements 4/26/02 02/27/08, 73 FR 10383 Section 115.135 Testing Requirements 05/4/94 05/22/97, 62 FR 27964 Section 115.136 Monitoring and Recordkeeping Requirements 4/26/02 02/27/08, 73 FR 10383 Section 115.137 Exemptions 4/26/02 02/27/08, 73 FR 10383 Section 115.139 Counties and Compliance Schedules 6/15/2015 12/21/2017, 82 FR 60547 Division 4: Industrial Wastewater Section 115.140 Industrial Wastewater Definitions 4/26/02 2/27/08, 73 FR 10383 Section 115.142 Control Requirements 12/13/02 02/27/08, 73 FR 10383 Section 115.143 Alternate Control Requirements 12/13/02 02/27/08, 73 FR 10383 Section 115.144 Inspection and Monitoring Requirements 12/13/02 2/27/08, 73 FR 10383 Section 115.145 Approved Test Methods 4/26/02 02/27/08, 73 FR 10383 Section 115.146 Recordkeeping Requirements 10/27/99 12/20/00, 65 FR 79745 Section 115.147 Exemptions 12/13/02 02/27/08, 73 FR 10383 Section 115.148 Training Requirements 10/27/99 12/20/00, 65 FR 79745 Section 115.149 Counties and Compliance Schedules 11/15/06 7/17/08, 73 FR 40972 Division 5: Municipal Solid Waste Landfills Section 115.152 Control Requirements 5/4/94 5/22/97, 62 FR 27964 Section 115.153 Alternate Control Requirements 4/26/02 2/27/08, 73 FR 10383 Section 115.155 Approved Test Methods 05/4/94 05/22/97, 62 FR 27964 Section 115.156 Monitoring and Recordkeeping Requirements 5/4/94 05/22/97, 62 FR 27964 Section 115.157 Exemptions 5/4/94 5/22/97, 62 FR 27964 Section 115.159 Counties and Compliance Schedules 4/26/02 2/27/08, 73 FR 10383 Division 6: Batch Processes Section 115.160 Batch Process Definitions 12/13/02 02/27/08, 73 FR 10383 Section 115.161 Applicability 12/13/02 02/27/08, 73 FR 10383 Section 115.162 Control Requirements 12/06/00 07/16/01, 66 FR 36913 Section 115.163 Alternate Control Requirements 10/27/99 12/20/00, 65 FR 79745 Section 115.164 Determination of Emissions and Flow Rates 12/06/00 07/16/01, 66 FR 36913 Section 115.165 Approved Test Methods and Testing Requirements 12/06/00 07/16/01, 66 FR 36913 Section 115.166 Monitoring and Recordkeeping Requirements 12/13/02 02/27/08, 73 FR 10383 Section 115.167 Exemptions 9/28/2005 7/10/2009, 74 FR 33146 Section 115.169 Counties and Compliance Schedules 9/28/2005 7/10/2009, 74 FR 33146 Division 7: Oil and Natural Gas in Ozone Nonattainment Areas Section 115.170 Applicability 7/20/2021 8/15/2023, 88 FR 55382 Section 115.171 Definitions 7/20/2021 8/15/2023, [88 FR 55382 Section 115.172 Exemptions 7/20/2021 8/15/2023, 88 FR 55382 Section 115.173 Compressor Control Requirements 7/20/2021 8/15/2023, 88 FR 55382 Section 115.174 Pneumatic Controller and Pump Control Requirements 7/20/2021 8/15/2023, 88 FR 55382 Section 115.175 Storage Tank Control Requirements 7/20/2021 8/15/2023, 88 FR 55382 Section 115.176 Alternative Control Requirements 7/20/2021 8/15/2023, 88 FR 55382 Section 115.177 Fugitive Emission Component Monitoring Requirements 7/20/2021 8/15/2023, 88 FR 55382 Section 115.178 Monitoring and Inspection Requirements 7/20/2021 8/15/2023, 88 FR 55382 Section 115.179 Approved Test Methods and Testing Requirements 7/20/2021 8/15/2023, 88 FR 55382 Section 115.180 Recordkeeping Requirements 7/20/2021 8/15/2023, 88 FR 55382 Section 115.181 Reporting Requirements 7/20/2021 8/15/2023, 88 FR 55382 Section 115.183 Compliance Schedules 7/20/2021 8/15/2023, 88 FR 55382 Subchapter C—Volatile Organic Compound Transfer Operations Division 1: Loading and Unloading of Volatile Organic Compounds Section 115.211 Emission Specifications 12/13/02 1/19/06, 71 FR 3009 Section 115.212 Control Requirements 12/6/00 07/16/01, 66 FR 36913 Section 115.213 Alternate Control Requirements 06/30/99 12/20/00, 65 FR 79745 Section 115.214 Inspection Requirements 4/26/02 1/19/06, 71 FR 3009 Section 115.215 Approved Test Methods 6/15/2015 12/21/2017, 82 FR 60547 Section 115.216 Monitoring and Record-keeping Requirements 10/22/03 1/19/06, 71 FR 3009 Section 115.217 Exemptions 10/22/03 1/19/06, 71 FR 3009 Section 115.219 Counties and Compliance Schedules 6/15/2015 12/21/2017, 82 FR 60547 Section 115.220* Filling of Gasoline Storage Vessels (Stage I) for Motor Vehicles Fuel Dispensing Facilities in Bexar County 03/30/79 11/10/82, 47 FR 50866 Ref 52.2299(c)(48). The number 220* was created to avoid duplicate sections numbers in the SIP. There is no section 115.220 in the current SIP approved codification. Division 2: Filling of Gasoline Storage Vessels (Stage I) for Motor Vehicle Fuel Dispensing Facilities Section 115.221 Emission Specifications 9/10/2014 4/30/2015, 80 FR 24215 Section 115.222 Control Requirements 9/10/2014 4/30/2015, 80 FR 24215 Section 115.223 Alternate Control Requirements 03/23/05 1/19/06, 71 FR 3009 Section 115.224 Inspection Requirements 9/10/2014 4/30/2015, 80 FR 24215 Section 115.225 Testing Requirements 9/10/2014 4/30/2015, 80 FR 24215 Section 115.226 Recordkeeping Requirements 9/10/2014 4/30/2015, 80 FR 24215 Section 115.227 Exemptions 9/10/2014 4/30/2015, 80 FR 24215 Section 115.229 Counties and Compliance Schedules 6/15/2015 12/21/2017, 82 FR 60547 Division 3: Control of Volatile Organic Leaks from Transport Vessels Section 115.234 Inspection Requirements 6/30/99 12/20/00, 65 FR 79745 Section 115.235 Approved Test Methods 06/30/99 12/20/00, 65 FR 79745 Section 115.236 Recordkeeping Requirements 6/30/99 12/20/00, 65 FR 79745 Section 115.237 Exemptions 06/30/99 12/20/00, 65 FR 79745 Section 115.239 Counties and Compliance Schedules 6/15/2015 12/21/2017, 82 FR 60547 Division 4: Control of Vehicle Refueling Emissions (Stage II) at Motor Vehicle Fuel Dispensing Facilities Section 115.240 Stage II Vapor Recovery Definitions and List of California Air Resources Board Certified Stage II Equipment 10/9/2013 3/17/14, 79 FR 14611 Section 115.241 Emission Specifications 10/9/2013 3/17/14, 79 FR 14611 Section 115.242 Control Requirements 10/9/2013 3/17/14, 79 FR 14611 Section 115.243 Alternate Control Requirements 10/9/2013 3/17/14, 79 FR 14611 Section 115.244 Inspection Requirements 10/9/2013 3/17/14, 79 FR 14611 Section 115.245 Testing Requirements 10/9/2013 3/17/14, 79 FR 14611 Section 115.246 Recordkeeping Requirements 10/9/2013 3/17/14, 79 FR 14611 Section 115.248 Training Requirements 3/23/05 1/19/06, 71 FR 3009 Section 115.252 to 115.259 Control of Reid Vapor Pressure of Gasoline 5/4/94 05/22/97, 62 FR 27964 Ref 52.2299(c)(104). Subchapter D—Petroleum Refining, Natural Gas Processing, and Petrochemical Processes Division 1: Process Unit Turnaround and Vacuum-Producing Systems in Petroleum Refineries Section 115.311 Emission Specifications 4/26/02 2/27/08, 73 FR 10383 Section 115.312 Control Requirements 12/13/02 2/27/08, 73 FR 10383 Section 115.313 Alternate Control Requirements 4/26/02 02/27/08, 73 FR 10383 Section 115.315 Testing Requirements 5/8/92 3/7/95, 60 FR 12438 Section 115.316 Monitoring and Recordkeeping Requirements 4/26/02 2/27/08, 73 FR 10383 Section 115.317 Exemptions 5/8/92 3/7/95, 60 FR 12438 Section 115.319 Counties and Compliance Schedules 11/15/06 7/17/08, 73 FR 40972 Division 2: Fugitive Emission Control in Petroleum Refineries in Gregg, Nueces, and Victoria Counties Section 115.322 Control Requirements 6/2/2010 2/26/2015, 80 FR 10352 Section 115.323 Alternate Control Requirements 6/2/2010 2/26/2015, 80 FR 10352 Section 115.324 Inspection Requirements 6/2/2010 2/26/2015, 80 FR 10352 Section 115.325 Testing Requirements 6/2/2010 2/26/2015, 80 FR 10352 Section 115.326 Recordkeeping Requirements 6/2/2010 2/26/2015, 80 FR 10352 Section 115.327 Exemptions 4/26/02 2/27/08, 73 FR 10383 Section 115.329 Counties and Compliance Schedules 8/8/01 2/27/08, 73 FR 10383 Division 3: Fugitive Emission Control in Petroleum Refining, Natural Gas/Gasoline Processing, and Petrochemical Processes in Ozone Nonattainment Areas Section 115.352 Control Requirements 6/2/2010 2/26/2015, 80 FR 10352 Section 115.353 Alternate Control Requirements 6/2/2010 2/26/2015, 80 FR 10352 Section 115.354 Monitoring and Inspection Requirements 6/2/2010 2/26/2015, 80 FR 10352 Section 115.355 Approved Test Methods 6/2/2010 2/26/2015, 80 FR 10352 Section 115.356 Recordkeeping Requirements 6/2/2010 2/26/2015, 80 FR 10352 Section 115.357 Exemptions 7/20/2021 8/15/2023, 88 FR 55382 Section 115.358 Alternative Work Practice 6/2/2010 2/26/2015, 80 FR 10352 Section 115.359 Counties and Compliance Schedules 6/15/2015 12/21/2017, 82 FR 60547 Subchapter E—Solvent-Using Processes Division 1: Degreasing Processes Section 115.410 Applicability 6/15/2015 12/21/2017, 82 FR 60547 Section 115.411 Exemptions 6/15/2015 12/21/2017, 82 FR 60547 Section 115.412 Control Requirements 11/17/04 3/29/05, 70 FR 15769 Section 115.413 Alternate Control Requirements 11/17/04 3/29/05, 70 FR 15769 Section 115.415 Testing 6/15/2015 12/21/2017, 82 FR 60547 Section 115.416 Recordkeeping Requirements 6/15/2015 12/21/2017, 82 FR 60547 Section 115.419 Counties and Compliance Schedules 6/15/2015 12/21/2017, 82 FR 60547 Division 2: Surface Coating Processes Section 115.420 Applicability and Definitions 6/15/2015 12/21/2017, 82 FR 60547 Section 115.421 Emissions Specifications 6/15/2015 12/21/2017, 82 FR 60547 Section 115.422 Control Requirements 6/15/2015 12/21/2017, 82 FR 60547 Section 115.423 Alternate Control Requirements 6/15/2015 12/21/2017, 82 FR 60547 Section 115.424 Inspection Requirements 6/29/00 10/30/01, 66 FR 54688 Section 115.425 Testing Requirements 6/15/2015 12/21/2017, 82 FR 60547 Section 115.426 Monitoring and Recordkeeping Requirements 6/15/2015 12/21/2017, 82 FR 60547 Section 115.427 Exemptions 6/15/2015 12/21/2017, 82 FR 60547 Section 115.429 Counties and Compliance Schedules 6/15/2015 12/21/2017, 82 FR 60547 Division 3: Flexographic and Rotogravure Printing Section 115.430 Applicability and Definitions 01/17/12 3/27/15, 80 FR 16291 Section 115.431 Exemptions 1/17/12 3/27/15, 80 FR 16291 Section 115.432 Control Requirements 1/17/12 3/27/15, 80 FR 16291 Section 115.433 Alternate Control Requirements 1/17/12 3/27/15, 80 FR 16291 Section 115.435 Testing Requirements 1/17/12 3/27/15, 80 FR 16291 Section 115.436 Monitoring and Recordkeeping Requirements 1/17/12 3/27/15, 80 FR 16291 Section 115.439 Counties and Compliance Schedules 1/17/12 3/27/15, 80 FR 16291 Division 4: Offset Lithographic Printing Section 115.440 Applicability and Definitions 6/15/2015 12/21/2017, 82 FR 60547 Section 115.441 Exemptions 6/15/2015 12/21/2017, 82 FR 60547 Section 115.442 Control Requirements 6/15/2015 12/21/2017, 82 FR 60547 Section 115.443 Alternate Control Requirements 3/10/2010 8/4/2014, 79 FR 45106 Section 115.445 Approved Test Methods 3/10/2010 8/4/2014, 79 FR 45106 Section 115.446 Monitoring and Recordkeeping Requirements 6/15/2015 12/21/2017, 82 FR 60547 Section 115.449 Compliance Schedules 6/15/2015 12/21/2017, 82 FR 60547 Division 5: Control Requirements for Surface Coating Processes Section 115.450 Applicability and Definitions 6/15/2015 12/21/2017, 82 FR 60547 Section 115.451 Exemptions 6/15/2015 12/21/2017, 82 FR 60547 Section 115.453 Control Requirements 6/15/2015 12/21/2017, 82 FR 60547 Section 115.454 Alternate Control Requirements 1/17/12 3/27/15, 80 FR 16291 Section 115.455 Approved Test Methods and Testing Requirements 1/17/12 3/27/15, 80 FR 16291 Section 115.458 Monitoring and Recordkeeping Requirements 1/17/12 3/27/15, 80 FR 16291 Section 115.459 Counties and Compliance Schedules 6/15/2015 12/21/2017, 82 FR 60547 Division 6: Industrial Cleaning Solvents Section 115.460 Applicability and Definitions 6/15/2015 12/21/2017, 82 FR 60547 Section 115.461 Exemptions 6/15/2015 12/21/2017, 82 FR 60547 Section 115.463 Control Requirements 1/17/12 3/27/15, 80 FR 16291 Section 115.464 Alternate Control Requirements 1/17/12 3/27/15, 80 FR 16291 Section 115.465 Approved Test Methods and Testing Requirements 1/17/12 3/27/15, 80 FR 16291 Section 115.468 Monitoring and Recordkeeping Requirements 1/17/12 3/27/15, 80 FR 16291 Section 115.469 Compliance Schedules 6/15/2015 12/21/2017, 82 FR 60547 Division 7: Miscellaneous Industrial Adhesives Section 115.470 Applicability and Definitions 1/17/12 3/27/15, 80 FR 16291 Section 115.471 Exemptions 6/15/2015 12/21/2017, 82 FR 60547 Section 115.473 Control Requirements 6/15/2015 12/21/2017, 82 FR 60547 Section 115.474 Alternate Control Requirements 1/17/12 3/27/15, 80 FR 16291 Section 115.475 Approved Test Methods and Testing Requirements 1/17/12 3/27/15, 80 FR 16291 Section 115.478 Monitoring and Recordkeeping Requirements 1/17/12 3/27/15, 80 FR 16291 Section 115.479 Compliance Schedules 6/15/2015 12/21/2017, 82 FR 60547 Subchapter F—Miscellaneous Industrial Sources Division 1: Cutback Asphalt Section 115.510 Cutback Asphalt Definitions 8/31/99 12/22/99, 64 FR 71670 Section 115.512 Control Requirements 11/17/04 3/29/05, 70 FR 15769 Section 115.513 Alternative Control Requirements 8/31/99 12/22/99, 64 FR 71670 Section 115.515 Testing Requirements 8/31/99 12/22/99, 64 FR 71670 Section 115.516 Recordkeeping Requirements 11/17/04 3/29/05, 70 FR 15769 Section 115.517 Exemptions 11/17/04 3/29/05, 70 FR 15769 Ref 52.2299(c)(88). Section 115.519 Compliance Schedules 6/15/2015 12/21/2017, 82 FR 60547 Division 2: Pharmaceutical Manufacturing Facilities Section 115.531 Emission Specifications 5/4/94 5/22/97, 62 FR 27964 Section 115.532 Control Requirements 4/26/02 2/27/08, 73 FR 10383 Section 115.533 Alternate Control Requirements 4/26/02 02/27/08, 73 FR 10383 Section 115.534 Inspection Requirements 5/4/94 5/22/97, 62 FR 27964 Section 115.535 Testing Requirements 4/26/02 2/27/08, 73 FR 10383 Section 115.536 Monitoring and Recordkeeping Requirements 5/4/94 5/22/97, 62 FR 27964 Section 115.537 Exemptions 5/4/94 05/22/97, 62 FR 27964 Section 115.539 Counties and Compliance Schedules 11/15/06 7/17/08, 73 FR 40972 Division 3: Degassing or Cleaning of Stationary, Marine, and Transport Vessels Section 115.540 Applicability and Definitions 1/26/2011 9/23/2015, 80 FR 57304 Section 115.541 Emission Specifications 1/26/2011 9/23/2015, 80 FR 57304 Section 115.542 Control Requirements 1/26/2011 9/23/2015, 80 FR 57304 Section 115.543 Alternate control Requirements 1/26/2011 9/23/2015, 80 FR 57304 Section 115.544 Inspection, Monitoring, and Testing Requirements 1/26/2011 9/23/2015, 80 FR 57304 Section 115.545 Approved Test Methods 1/26/2011 9/23/2015, 80 FR 57304 Section 115.546 Recordkeeping and Notification Requirements 1/26/2011 9/23/2015, 80 FR 57304 Section 115.547 Exemptions 1/26/2011 9/23/2015, 80 FR 57304 Section 115.549 Counties and Compliance Schedules 5/23/2007 3/29/2010, 75 FR 15348 Division 4: Petroleum Dry Cleaning Systems Section 115.552 Control Requirements 4/26/02 2/27/08, 73 FR 10383 Section 115.553 Alternate Control Requirements 05/4/94 5/22/97, 62 FR 27964 Section 115.555 Testing Methods and Procedures 5/4/94 5/22/97, 62 FR 27964 Section 115.556 Recordkeeping Requirements 5/4/94 5/22/97, 62 FR 27964 Section 115.557 Exemptions 5/4/94 5/22/97, 62 FR 27964 Section 115.559 Counties and Compliance Schedules 4/26/02 2/27/08, 73 FR 10383 Subchapter G—Consumer-Related Sources Division 1: Automotive Windshield Washer Fluid Section 115.600 Consumer Products Definitions 1/28/04 02/10/05, 70 FR 7041 Section 115.610 Applicability 1/28/04 02/10/05, 70 FR 7041 Section 115.612 Control Requirements 1/28/04 02/10/05, 70 FR 7041 Section 115.613 Alternate Control Requirements 1/28/04 02/10/05, 70 FR 7041 Section 115.615 Testing Requirements 1/28/04 02/10/05, 70 FR 7041 Section 115.616 Recordkeeping and Reporting Requirements 1/28/04 02/10/05, 70 FR 7041 Section 115.617 Exemptions 1/28/04 02/10/05, 70 FR 7041 Section 115.619 Counties and Compliance Schedules 1/28/04 2/10/05, 70 FR 7041 Division 2: Portable Fuel Containers Subchapter H—Highly-Reactive Volatile Organic Compounds Division 1: Vent Gas Control Section 115.720 Applicability and Definitions 12/01/04 9/06/06, 71 FR 52656 Section 115.722 Site-wide Cap and Control Requirements 12/01/04 9/06/06, 71 FR 52656 Section 115.725 Monitoring and Testing Requirements 12/01/04 9/06/06, 71 FR 52656 Section 115.726 Recordkeeping and Reporting Requirements 12/01/04 9/06/06, 71 FR 52656 Section 115.727 Exemptions 12/01/04 9/06/06, 71 FR 52656 Section 115.729 Counties and Compliance Schedules 12/1/04 9/06/06, 71 FR 52656 Division 2: Cooling Tower Heat Exchange Systems Section 115.760 Applicability and Cooling Tower Heat Exchange System Definitions 12/1/04 9/06/06, 71 FR 52656 Section 115.761 Site-wide Cap 12/01/04 9/6/06, 71 FR 52656 Section 115.764 Monitoring and Testing Requirements 12/1/04 9/6/06, 71 FR 52656 Section 115.766 Recordkeeping and Reporting Requirements 12/1/04 9/6/06, 71 FR 52656 Section 115.767 Exemptions 12/01/04 9/06/06, 71 FR 52656 Section 115.769 Counties and Compliance Schedules 12/1/04 9/6/06, 71 FR 52656 Division 3: Fugitive Emissions Section 115.780 Applicability 12/1/04 9/06/06, 71 FR 52656 Section 115.781 General Monitoring and Inspection Requirements 6/2/2010 2/26/2015, 80 FR 10352 Section 115.782 Procedures and Schedule for Leak Repair and Follow-up 6/2/2010 2/26/2015, 80 FR 10352 Section 115.783 Equipment Standards 12/1/04 9/06/06, 71 FR 52656 Section 115.784 Alternate Control Requirements 6/2/2010 2/26/2015, 80 FR 10352 Section 115.786 Recordkeeping Requirements 6/2/2010 2/26/2015, 80 FR 10352 Section 115.787 Exemptions 6/2/2010 2/26/2015, 80 FR 10352 Section 115.788 Audit Provisions 6/2/2010 2/26/2015, 80 FR 10352 Section 115.789 Counties and Compliance Schedules 12/1/04 9/06/06, 71 FR 52656 Subchapter J—Administrative Provisions Division 1: Alternate Means of Control Section 115.901 Insignificant Emissions 07/13/94 05/22/97, 62 FR 27964 Section 115.910 Availability of Alternate Means of Control 4/26/2 2/27/08, 73 FR 10383 Section 115.911 Criteria for Approval of Alternate Means of Control Plans 4/26/02 2/27/08, 73 FR 10383 Section 115.912 Calculations for Determining Alternate Means of Control Reductions 4/26/02 02/27/08, 73 FR 10383 Section 115.913 Procedures for Alternate Means of Control Plan Submittal 4/26/02 02/27/08, 73 FR 10383 Section 115.914 Procedures for an Alternate Means of Control Plan Approval 4/26/02 02/27/08, 73 FR 10383 Section 115.915 Public Notice Format 4/26/02 2/27/08, 73 FR 10383 Section 115.916 Review of Approved Alternate Means of Control Plans and Termination of Alternate Means of Control Plans 4/26/02 02/27/08, 73 FR 10383 Division 2: Early Reductions Section 115.920 Applicability 4/26/02 2/27/08, 73 FR 10383 Section 115.923 Documentation 04/26/02 2/27/08, 73 FR 10383 Division 3: Compliance and Control Plan Requirements Section 115.930 Compliance Dates 4/26/02 2/27/08, 73 FR 10383 Section 115.932 Congtrol Plan Procedure 4/26/02 2/27/08, 73 FR 10383 Section 115.934 Control Plan Deviation 4/26/02 2/27/08, 73 FR 10383 Section 115.936 Reporting Procedure 11/10/93 5/22/97, 62 FR 27964 Section 115.940 Equivalency Determination 4/26/02 2/27/08, 73 FR 10383 Section 115.950 Use of Emissions Credits for Compliance 12/06/00 9/6/06, 71 FR 52698 Chapter 116 (Reg 6)—Control of Air Pollution by Permits for New Construction or Modification Subchapter A—Definitions Section 116.10 Definitions 9/15/2010 9/9/2016, 81 FR 62385 SIP does not include 30 TAC Section 116.10(5)(F) or 116.10(9)(F). Section 116.11 Compliance History Definitions 06/17/98 09/18/02, 67 FR 58709. Section 116.12 Nonattainment and Prevention of Significant Deterioration Review Definitions 3/26/2014 11/10/2014, 79 FR 66626 The SIP does NOT include the substantive revisions to the definitions of “major stationary source” at 30 TAC Section 116.12(19) or “major modification” at 30 TAC Section 116.12(20) pertaining to “Step 2” or “non-anyway” GHG sources.
The SIP includes the TCEQ's letter dated 5/3/2012, which explains and clarifies the TCEQ's interpretation of the definition of “plant-wide applicability limit” in 30 TAC Section 116.12(24).Section 116.13 Flexible Permit Definitions 7/31/2014 7/20/2015, 80 FR 42729 Section 116.14 Standard Permit Definitions 06/17/98 11/14/03, 68 FR 64548 Section 116.17 Qualified Facility Definitions 9/15/2010 9/9/2016, 81 FR 62385 Section 116.18 Electric Generating Facility Permits Definitions 5/22/2002 1/11/2011, 76 FR 1525 Section 116.20 Portable Facilities Definitions 2/10/2010 10/6/2015, 80 FR 60296 Subchapter B—New Source Review Permits Division 1—Permit Application Section 116.110 Applicability 7/15/2020 10/14/2020, 85 FR 64968 SIP does not include 116.110(a)(5), 116.110(c), or 116.110(d). Section 116.111 General Application 4/22/2020 8/24/2023, 88 FR 57844 Section 116.112 Distance Limitations 4/22/2020 8/24/2023, 88 FR 57844 Section 116.114 Application Review Schedule 10/31/2018 2/13/2020, 85 FR 8187 Section 116.115 General and Special Conditions 2/9/2011 10/25/2012, 77 FR 65119 Section 116.116 Changes to Facilities 7/15/2020 10/14/2020, 85 FR 64968 SIP does not include 30 TAC Section 116.116(b)(3). Section 116.117 Documentation and Notification of Changes to Qualified Facilities 9/15/2010 9/9/2016, 81 FR 62385 SIP does not include 30 TAC Section 116.117(a)(4)(B). Section 116.118 Construction While Permit Amendment Application Pending 7/15/2020 10/14/2020, 85 FR 64968 Section 116.120 Voiding of Permits 8/20/03 4/2/10, 75 FR 16671 Section 116.127 Actual to Projected Actual and Emission Exclusion Test for Emissions 2/9/2011 10/25/2012, 77 FR 65119 Division 4—Permit Fees Section 116.140 Applicability 06/17/98 09/18/02, 67 FR 58709 Section 116.141 Determination of Fees 9/25/2002 3/20/2009, 74 FR 11851. Section 116.143 Payment of Fees 8/20/2003 3/20/2009, 74 FR 11851. Division 5—Nonattainment Review Section 116.150 New Major Source or Major Modification in Ozone Nonattainment Area 7/25/2012 10/25/2012, 77 FR 65119 Section 116.151 New Major Source or Major Modification in Nonattainment Area Other than Ozone 7/25/2012 10/25/2012, 77 FR 65119 Division 6—Prevention of Significant Deterioration Review Section 116.160 Prevention of Significant Deterioration 10/31/2018 2/13/2020, 85 FR 8187 The PSD SIP includes 30 TAC Section 116.160(a) as adopted by the State as of 6/2/2010. The PSD SIP includes a letter from the TCEQ dated December 2, 2013, committing that Texas will follow a SIP amendment process to apply its PSD SIP to additional pollutants that are regulated in the future, including non-NAAQS pollutants. The PSD SIP includes a letter from the TCEQ dated May 30, 2014, clarifying the judicial review process for the Texas PSD permit program. Section 116.161 Source Located in an Attainment Area with Greater than De Minimis Impact 06/17/98 09/18/02, 67 FR 58709. Section 116.162 Evaluation of Air Quality Impacts 10/10/01 7/22/04, 69 FR 43752. Section 116.163 Prevention of Significant Deterioration Permit Fees 9/25/2002 3/20/2009, 74 FR 11851. Section 116.164 Prevention of Significant Deterioration Applicability for Greenhouse Gases Sources 10/31/2018 2/13/2020, 85 FR 8187 The PSD SIP does NOT include 30 TAC Section 116.164(b). Section 116.169 Greenhouse Gases Program Transitions 3/26/2014 11/10/2014, 79 FR 66626 The PSD SIP does NOT include 30 TAC Section 116.169(b).
The PSD SIP includes a letter from the TCEQ dated January 13, 2014, regarding the TCEQ's authority to administer EPA-issued GHG PSD permits.Division 7—Emission Reductions: Offsets Section 116.170 Applicability of Emission Reductions as Offsets 8/20/2003 3/20/2009, 74 FR 11851. Section 116.172 Emissions Offsets from Rocket Engine Firing and Cleaning 8/20/2003 3/20/2009, 74 FR 11851. Section 116.174 Determination by Executive Director to Authorize Reductions 6/17/1998 11/2/2011, 76 FR 67600 Section 116.175 Recordkeeping 8/16/1993 11/2/2011, 76 FR 67600 Section 116.176 Use of Mass Cap Allowances for Offsets 3/07/01 9/6/06, 71 FR 52664. Division 8—Portable Facilities Section 116.178 Relocations and Changes of Location of Portable Facilities 2/10/2010 10/6/2015, 80 FR 60296 Subchapter C—Plant-wide Applicability Limits Division 1—Plant-wide Applicability Limits Section 116.180 Applicability 7/25/2012 10/25/2012, 77 FR 65119 Section 116.182 Plant-Wide Applicability Limit Permit Application 2/9/2011 10/25/2012, 77 FR 65119 Section 116.184 Application Review Schedule 1/11/2006 10/25/2012, 77 FR 65119 Section 116.186 General and Specific Conditions 7/25/2012 10/25/2012, 77 FR 65119 The SIP includes TCEQ's “Letter of explanation and interpretation of the Texas SIP for NSR Reform” dated 5/3/2012, which explains and clarifies TCEQ's interpretation of paragraphs (a), (b)(9) and (c)(2). Section 116.188 Plant-Wide Applicability Limit 2/9/2011 10/25/2012, 77 FR 65119 Section 116.190 Federal Nonattainment and Prevention of Significant Deterioration Review 2/9/2011 10/25/2012, 77 FR 65119 Section 116.192 Amendments and Alterations 2/9/2011 10/25/2012, 77 FR 65119 Section 116.194 Public Notification and Comment 6/2/2010 1/6/2014, 79 FR 551 Section 116.196 Renewal of a Plant-wide Applicability Limit Permit 10/31/2018 2/13/2020, 85 FR 8187 Section 116.198 Expiration of Voidance 10/31/2018 2/13/2020, 85 FR 8187 Subchapter D—Permit Renewals Section 116.310 Notification of Permit Holder 10/31/2018 2/13/2020, 85 FR 8187 Section 116.311 Permit Renewal Application 8/21/2002 9/9/2016, 81 FR 62385 SIP does not include 30 TAC Section 116.311(a)(6). Section 116.312 Public Notification and Comment Procedures 9/2/1999 1/6/2014, 79 FR 551 Section 116.313 Renewal Application Fees 8/20/2003 3/20/2009, 74 FR 11851. Section 116.314 Review Schedule 6/17/1998 11/14/2011, 76 FR 70354 Section 116.315 Permit Renewal Submittal 5/7/2008 3/11/10, 75 FR 11464 Subchapter F—Standard Permits Section 116.601 Types of Standard Permits 2/9/2011 4/1/2014, 79 FR 18183 Section 116.602 Issuance of Standard Permits 12/16/99 11/14/03, 68 FR 64548 Section 116.603 Public Participation in Issuance of Standard Permits 9/20/06 9/17/08, 73 FR 53716 Section 116.604 Duration and Renewal of Registrations to Use Standard Permits 12/16/99 11/14/03, 68 FR 64548 Section 116.605 Standard Permit Amendment and Revocation 12/16/99 11/14/03, 68 FR 64548 Section 116.606 Delegation 12/16/99 11/14/03, 68 FR 64548 Section 116.610 Applicability 3/26/2014 11/10/2014, 79 FR 66626 30 TAC Section 116.610(b) is SIP-approved as adopted by the State as of 11/20/2002.
The SIP does NOT include 30 TAC Section 116.610(d)Section 116.611 Registration to Use a Standard Permit 10/31/2018 2/13/2020, 85 FR 8187 30 TAC Section 116.611(b) is SIP-approved as adopted by the State as of 11/20/2002. The SIP does NOT include 30 TAC Section 116.611(c)(3), (c)(3)(A), and (c)(3)(B). Section 116.614 Standard Permit Fees 9/25/2002 3/20/2009, 74 FR 11851. Section 116.615 General Conditions 10/31/2018 2/13/2020, 85 FR 8187 Section 116.617 State Pollution Control Project Standard Permit 1/11/2006 4/1/2014, 79 FR 18183 Section 116.620 Installation and/or Modification of Oil and Gas Facilities 8/9/2000 2/14/2014, 79 FR 8861 The types of emission units that may be authorized by this section are the following:
• Internal combustion engines (ICEs),
• Natural gas turbines (NG turbines),• Flares, • Other combustion units (design heat input >40 million BTU per hour), • Natural gas glycol dehydration units, • Storage tanks, • Separators, • Condensers, • Vapor recovery units, • Process vents, and • Process fugitives Subchapter G: Flexible Permits Section 116.710 Applicability July 15, 2020 10/14/2020, 85 FR 64968 Section 116.711 Flexible Permit Application 7/31/2014 7/20/2015, 80 FR 42729 SIP includes 30 TAC 116.711(1), (2)(A), (B) and (C)(i) and (ii), (D)–(J), and (L)–(N) Section 116.714 Application Review Schedule 6/17/1998 7/14/2014, 79 FR 40666 Section 116.715 General and Special Conditions 7/31/2014 7/20/2015, 80 FR 42729 SIP includes 30 TAC 116.715(a)–(e) and (f)(1) and (2)(B) Section 116.716 Emission Caps and Individual Emission Limitations 7/31/2014 7/20/2015, 80 FR 42729 Section 116.717 Implementation Schedule for Additional Controls 7/31/2014 7/20/2015, 80 FR 42729 Section 116.718 Significant Emission Increase 7/31/2014 7/20/2015, 80 FR 42729 Section 116.720 Limitation on Physical and Operational Changes 7/31/2014 7/20/2015, 80 FR 42729 116.721 Amendments and Alterations July 15, 2020 10/14/2020, 85 FR 64968 Section 116.722 Distance Limitations 8/9/2000 7/14/2014, 79 FR 40666 Section 116.740 Public Notice and Comment 7/31/2014 7/20/2015, 80 FR 42729 SIP includes 30 TAC Section 116.740(a). Section 116.750 Flexible Permit Fee 7/31/2014 7/20/2015, 80 FR 42729 Section 116.760 Flexible Permit Renewal 11/16/1994 7/20/2015, 80 FR 42729 Section 116.765 Compliance Schedule 7/31/2014 7/20/2015, 80 FR 42729 SIP includes 30 TAC Section 116.765(b) and (c). Subchapter I—Electric Generating Facility Permits Section 116.910 Applicability 6/9/2021 8/24/2023, 88 FR 57844 Section 116.911 Electric Generating Facility Permit Application 6/9/2021 8/24/2023, 88 FR 57844 Section 116.911(a)(2) is authorized for Minor NSR only. Section 116.912 Electing Electric Generating Facilities 12/16/1999 1/11/2011, 76 FR 1525 Section 116.913 General and Special Conditions 5/22/2002 1/11/2011, 76 FR 1525 Section 116.914 Emissions Monitoring and Reporting Requirements 12/16/1999 1/11/2011, 76 FR 1525 Section 116.916 Permits for Grandfathered and Electing Electric Generating Facilities in El Paso County 12/16/1999 1/1/2011, 76 FR 1525 Section 116.917 Electric Generating Facility Permit Application for Certain Grandfathered Coal-Fired Electric Generating Facilities and Certain Grandfathered Facilities Located at Electric Generating Facility Sites 5/22/2002 1/11/2011, 76 FR 1525 Section 116.918 Additional General and Special Conditions for Grandfathered Coal-Fired Electric Generating Facilities and Certain Grandfathered Facilities Located at Electric Generating Facility Sites 5/22/2002 1/11/2011, 76 FR 1525 Section 116.919 Additional Requirements for Grandfathered Electric Generating Facility Permit Applications 8/21/02 1/6/14
79 FR 577Section 116.920 Public Participation for Initial Issuance 6/9/2021 8/24/2023, 88 FR 57844 Section 116.921 Notice and Comment Hearings for Initial Issuance 5/22/2002 1/11/2011, 76 FR 1525 Section 116.922 Notice of Final Action 12/16/1999 1/11/2011, 76 FR 1525 Section 116.926 Permit Fee 5/22/2002 1/11/2011, 76 FR 1525 Section 116.928 Delegation 5/22/2002 1/11/2011, 76 FR 1525 Section 116.930 Amendments and Alterations of Permits Issued Under this Subchapter 5/22/2002 1/11/2011, 76 FR 1525 Section 116.931 Renewal 12/16/1999 1/11/2011, 76 FR 1525 Subchapter M: Best Available Retrofit Technology (BART) Section 116.1500 Definitions 2/25/2009 1/5/2016, 81 FR 350 Section 116.1510 Applicability and Exemption Requirements 2/25/2009 1/5/2016, 81 FR 350 116.1510(d) is NOT part of the approved SIP. Section 116.1520 Best Available Retrofit Technology (BART) Analysis 2/25/2009 1/5/2016, 81 FR 350 Section 116.1530 Best Available Retrofit Technology (BART) Control Implementation 6/9/2021 8/24/2023, 88 FR 57844 Section 116.1540 Exemption from Best Available Retrofit Technology (BART) Control Implementation 2/25/2009 1/5/2016, 81 FR 350 Chapter 117—Control of Air Pollution From Nitrogen Compounds Subchapter A—Definitions Section 117.10 Definitions 6/3/2015 4/13/2016, 81 FR 21750 Subchapter B—Combustion Control at Major Industrial, Commercial, and Institutional Sources in Ozone Nonattainment Areas Division 1—Beaumont-Port Arthur Ozone Nonattainment Area Major Sources Section 117.100 Applicability 5/30/2007 12/3/2008, 73 FR 73562 Section 117.103 Exemptions 5/30/2007 12/3/2008, 73 FR 73562 Section 117.105 Emission Specifications for Reasonably Available Control Technology (RACT) 5/30/2007 12/3/2008, 73 FR 73562 Section 117.110 Emission Specifications for Attainment Demonstration 5/30/2007 12/3/2008, 73 FR 73562 117.110(c) not in SIP. Section 117.115 Alternative Plant-Wide Emission Specifications 5/30/2007 12/3/2008, 73 FR 73562 Section 117.123 Source Cap 5/30/2007 12/3/2008, 73 FR 73562 Section 117.130 Operating Requirements 5/30/2007 12/3/2008, 73 FR 73562 Section 117.135 Initial Demonstration of Compliance 5/30/2007 12/3/2008, 73 FR 73562 Section 117.140 Continuous Demonstration of Compliance 2/11/2009 7/31/2009, 74 FR 38102 Section 117.145 Notification, Recordkeeping, and Reporting Requirements 2/11/2009 7/31/2009, 74 FR 38102 Section 117.150 Initial Control Plan Procedures 5/30/2007 12/3/2008, 73 FR 73562 Section 117.152 Final Control Plan Procedures for Reasonably Available Control Technology 5/30/2007 12/3/2008, 73 FR 73562 Section 117.154 Final Control Plan Procedures for Attainment Demonstration Emission Specifications 5/30/2007 12/3/2008, 73 FR 73562 Section 117.156 Revision of Final Control Plan 5/30/2007 12/3/2008, 73 FR 73562 Division 3—Houston-Galveston-Brazoria Ozone Nonattainment Area Major Sources Section 117.300 Applicability 5/30/2007 12/3/2008, 73 FR 73562 Section 117.303 Exemptions 5/30/2007 12/3/2008, 73 FR 73562 Section 117.305 Emission Specifications for Reasonably Available Control Technology (RACT) 5/30/2007 12/3/2008, 73 FR 73562 Section 117.310 Emission Specifications for Attainment Demonstration 5/30/2007 12/3/2008, 73 FR 73562 117.310(c) not in SIP. Section 117.315 Alternative Plant-Wide Emission Specifications 5/30/2007 12/3/2008, 73 FR 73562 Section 117.320 System Cap 5/30/2007 12/3/2008, 73 FR 73562 Section 117.323 Source Cap 5/30/2007 1/14/2009, 74 FR 1927 Section 117.330 Operating Requirements 5/30/2007 12/3/2008, 73 FR 73562 Section 117.335 Initial Demonstration of Compliance 5/30/2007 12/3/2008, 73 FR 73562 Section 117.340 Continuous Demonstration of Compliance 2/11/2009 7/31/2009, 74 FR 38102 Section 117.345 Notification, Recordkeeping, and Reporting Requirements 2/11/2009 7/31/2009, 74 FR 38102 Section 117.350 Initial Control Plan Procedures 5/30/2007 12/3/2008, 73 FR 73562 Section 117.352 Final Control Plan Procedures for Reasonably Available Control Technology 5/30/2007 12/3/2008, 73 FR 73562 Section 117.354 Final Control Plan Procedures for Attainment Demonstration Emission Specifications 5/30/2007 12/3/2008, 73 FR 73562 Section 117.356 Revision of Final Control Plan 5/30/2007 12/3/2008, 73 FR 73562 Division 4—Dallas-Fort Worth Eight-Hour Ozone Nonattainment Area Major Sources Section 117.400 Applicability 6/3/2015 4/13/2016, 81 FR 21750 Section 117.403 Exemptions 6/3/2015 4/13/2016, 81 FR 21750 Section 117.405 Emission Specifications for Reasonably Available Control Technology (RACT) 6/3/2015 4/13/2016, 81 FR 21750 117.405(d) Not in SIP. Section 117.410 Emission Specifications for Eight-Hour Attainment Demonstration Reporting 6/3/2015 4/13/2016, 81 FR 21925 117.410(c) NOT in SIP. Section 117.423 Source Cap 6/3/2015 4/13/2016, 81 FR 21750 Section 117.430 Operating Requirements 6/3/2015 4/13/2016, 81 FR 21750 Section 117.435 Initial Demonstration of Compliance 6/3/2015 4/13/2016, 81 FR 21750 Section 117.440 Continuous Demonstration of Compliance 6/3/2015 4/13/2016, 81 FR 21750 Section 117.445 Notification, Recordkeeping, and Reporting Requirements 6/3/2015 4/13/2016, 81 FR 21750 Section 117.450 Initial Control Plan Procedures 6/3/2015 4/13/2016, 81 FR 21750 Section 117.452 Final Control Plan Procedures for Reasonably Available Control Technology 6/3/2015 4/13/2016, 81 FR 21750 Section 117.454 Final Control Plan Procedures for Attainment Demonstration Emission Specifications 6/3/2015 4/13/2016, 81 FR 21750 Section 117.456 Revision of Final Control Plan 6/3/2015 4/13/2016, 81 FR 21750 Subchapter C—Combustion Control at Major Utility Electric Generation Sources in Ozone Nonattainment Areas Division 1—Beaumont-Port Arthur Ozone Nonattainment Area Utility Electric Generation Sources Section 117.1000 Applicability 5/30/2007 12/3/2008, 73 FR 73562 Section 117.1003 Exemptions 5/30/2007 12/3/2008, 73 FR 73562 Section 117.1005 Emission Specifications for Reasonably Available Control Technology (RACT) 5/30/2007 12/3/2008, 73 FR 73562 Section 117.1010 Emission Specifications for Attainment Demonstration 5/30/2007 12/3/2008, 73 FR 73562 117.1010(b) not in SIP. Section 117.1015 Alternative System-Wide Emission Specifications 5/30/2007 12/3/2008, 73 FR 73562 Section 117.1020 System Cap 4/6/2012 7/31/2014, 79 FR 44300 Section 117.1035 Initial Demonstration of Compliance 5/30/2007 12/3/2008, 73 FR 73562 Section 117.1040 Continuous Demonstration of Compliance 5/30/2007 12/3/2008, 73 FR 73562 Section 117.1045 Notification, Recordkeeping, and Reporting Requirements 5/30/2007 12/3/2008, 73 FR 73562 Section 117.1052 Final Control Plan Procedures for Reasonably Available Control Technology 5/30/2007 12/3/2008, 73 FR 73562 Section 117.1054 Final Control Plan Procedures for Attainment Demonstration Emission Specifications 5/30/2007 12/3/2008, 73 FR 73562 Section 117.1056 Revision of Final Control Plan 5/30/2007 12/3/2008, 73 FR 73562 Division 3—Houston-Galveston-Brazoria Ozone Nonattainment Area Utility Electric Generation Sources Section 117.1200 Applicability 5/30/2007 12/3/2008, 73 FR 73562 Section 117.1203 Exemptions 5/30/2007 12/3/2008, 73 FR 73562 Section 117.1205 Emission Specifications for Reasonably Available Control Technology (RACT) 5/30/2007 1/14/2009, 74 FR 1927 Section 117.1210 Emission Specifications for Attainment Demonstration 5/30/2007 1/14/2009, 74 FR 1927 117.1210(b) not in SIP. Section 117.1215 Alternative System-Wide Emission Specifications 5/30/2007 12/3/2008, 73 FR 73562 Section 117.1220 System Cap 4/6/2012 7/31/14, 79 FR 44300 Section 117.1235 Initial Demonstration of Compliance 5/30/2007 12/3/2008, 73 FR 73562 Section 117.1240 Continuous Demonstration of Compliance 5/30/2007 12/3/2008, 73 FR 73562 Section 117.1245 Notification, Recordkeeping, and Reporting Requirements 5/30/2007 12/3/2008, 73 FR 73562 Section 117.1252 Final Control Plan Procedures for Reasonably Available Control Technology 5/30/2007 12/3/2008, 73 FR 73562 Section 117.1254 Final Control Plan Procedures for Attainment Demonstration Emission Specifications 5/30/2007 12/3/2008, 73 FR 73562 Section 117.1256 Revision of Final Control Plan 5/30/2007 12/3/2008, 73 FR 73562 Division 4—Dallas-Fort Worth Eight-Hour Ozone Nonattainment Area Utility Electric Generation Sources Section 117.1303 Exemptions 6/3/2015 4/13/2016, 81 FR 21750 Section 117.1310 Emission Specifications for Eight-Hour Attainment Demonstration 6/3/2015 4/13/2016, 81 FR 21750 117.1310(b) Not in SIP. Section 117.1335 Initial Demonstration of Compliance 6/3/2015 4/13/2016, 81 FR 21750 Section 117.1340 Continuous Demonstration of Compliance 6/3/2015 4/13/2016, 81 FR 21750 Section 117.1345 Notification, Recordkeeping, and Reporting Requirements 6/3/2015 4/13/2016, 81 FR 21750 Plan Section 117.1350 Initial Control Plan Procedures 6/3/2015 4/13/2016, 81 FR 21750 Section 117.1354 Final Control Plan Procedures for Attainment Demonstration Emission Specifications 6/3/2015 4/13/2016, 81 FR 21750 Subchapter D—Combustion Control at Minor Sources in Ozone Nonattainment Areas Division 1—Houston-Galveston-Brazoria Ozone Nonattainment Area Minor Sources Section 117.2000 Applicability 5/30/2007 12/3/2008, 73 FR 73562 Section 117.2003 Exemptions 5/30/2007 12/3/2008, 73 FR 73562 Section 117.2010 Emission Specification 5/30/2007 12/3/2008, 73 FR 73562 117.2010(i) not in SIP. Section 117.2030 Operating Requirements 5/30/2007 12/3/2008, 73 FR 73562 Section 117.2035 Monitoring and Testing Requirements 2/11/2009 7/31/2009, 74 FR 38102 Section 117.2045 Recordkeeping and Reporting Requirements 2/11/2009 7/31/2009, 74 FR 38102 Division 2—Dallas-Fort Worth Eight-Hour Ozone Nonattainment Area Minor Sources Section 117.2100 Applicability 5/30/2007 12/3/2008, 73 FR 73562 Section 117.2103 Exemptions 5/8/2013 7/31/14, 79 FR 44300 Section 117.2110 Emission Specifications for Eight-Hour Attainment Demonstration 5/18/2011 5/6/2013, 78 FR 26251 Section 117.2130 Operating Requirements 5/8/2013 7/31/2014, 79 FR 44300 Section 117.2135 Monitoring, Notification, and Testing Requirements 5/8/2013 7/31/2014, 79 FR 44300 Section 117.2145 Recordkeeping and Reporting Requirements 5/8/2013 7/31/2014, 79 FR 44300 Subchapter E—Multi-Region Combustion Control Division 1—Utility Electric Generation in East and Central Texas Section 117.3000 Applicability 5/30/2007 12/3/2008, 73 FR 73562 Section 117.3003 Exemptions 5/30/2007 12/3/2008, 73 FR 73562 Section 117.3005 Gas-Fired Steam Generation 5/30/2007 12/3/2008, 73 FR 73562 Section 117.3010 Emission Specifications 5/30/2007 12/3/2008, 73 FR 73562 117.3010(2) not in SIP. Section 117.3020 System Cap 4/6/2012 7/31/2014, 79 FR 44302 Section 117.3035 Initial Demonstration of Compliance 5/30/2007 12/3/2008, 73 FR 73562 Section 117.3040 Continuous Demonstration of Compliance 5/30/2007 12/3/2008, 73 FR 73562 Section 117.3045 Notification, Recordkeeping, and Reporting Requirements 5/30/2007 12/3/2008, 73 FR 73562 Section 117.3054 Final Control Plan Procedures 5/30/2007 12/3/2008, 73 FR 73562 Section 117.3056 Revision of Final Control Plan 5/30/2007 12/3/2008, 73 FR 73562 Division 2—Cement Kilns Section 117.3100 Applicability 5/30/2007 1/14/2009, 74 FR 1927 Section 117.3101 Cement Kilns Definitions 5/30/2007 1/14/2009, 74 FR 1927 Section 117.3103 Exemptions 5/30/2007 1/14/2009 , 74 FR 1927 Section 117.3110 Emission Specifications 5/30/2007 1/14/2009, 74 FR 1927 Section 117.3120 Source Cap 5/30/2007 1/14/2009, 74 FR 1927 Section 117.3123 Dallas-Fort Worth Eight-Hour Ozone Attainment Demonstration Control Requirements 5/30/2007 1/14/2009, 74 FR 1927 117.3123(f) not in SIP. Section 117.3140 Continuous Demonstration of Compliance 5/30/2007 1/14/2009, 74 FR 1927 Section 117.3142 Emission Testing and Monitoring for Eight-Hour Attainment Demonstration 5/30/2007 1/14/2009, 74 FR 1927 Section 117.3145 Notification, Recordkeeping, and Reporting Requirements 5/30/2007 1/14/2009, 74 FR 1927 Division 3—Water Heaters, Small Boilers, and Process Heaters Section 117.3200 Applicability 5/30/2007 12/3/2008, 73 FR 73562 Section 117.3201 Definitions 5/30/2007 12/3/2008, 73 FR 73562 Section 117.3203 Exemptions 5/30/2007 12/3/2008, 73 FR 73562 Section 117.3205 Emission Specifications 5/30/2007 12/3/2008, 73 FR 73562 Section 117.3210 Certification requirements 5/30/2007 12/3/2008, 73 FR 73562 Section 117.3215 Notification and Labeling Requirements 5/30/2007 12/3/2008, 73 FR 73562 Division 4—East Texas Combustion Section 117.3300 Applicability 5/30/2007 12/3/2008, 73 FR 73562 Section 117.3303 Exemptions 5/30/2007 12/3/2008, 73 FR 73562 Section 117.3310 Emission Specifications for Eight-Hour Attainment Demonstration 5/30/2007 12/3/2008, 73 FR 73562 117.3310(e) not in SIP. Section 117.3330 Operating Requirements 5/30/2007 12/3/2008, 73 FR 73562 Section 117.3335 Monitoring, Notification, and Testing Requirements 5/30/2007 12/3/2008, 73 FR 73562 Section 117.3345 Recordkeeping and Reporting Requirements 5/30/2007 12/3/2008, 73 FR 73562 Subchapter F—Acid Manufacturing Division 1—Adipic Acid Manufacturing Section 117.4000 Applicability 5/30/2007 12/3/2008, 73 FR 73562 Section 117.4005 Emission Specifications 5/30/2007 12/3/2008, 73 FR 73562 Section 117.4025 Alternative Case Specific Specifications 5/30/2007 12/3/2008, 73 FR 73562 Section 117.4035 Initial Demonstration of Compliance 5/30/2007 12/3/2008, 73 FR 73562 Section 117.4040 Continuous Demonstration of Compliance 5/30/2007 12/3/2008, 73 FR 73562 Section 117.4045 Notification, Recordkeeping, and Reporting Requirements 5/30/2007 12/3/2008, 73 FR 73562 Section 117.4050 Control Plan Procedures 5/30/2007 12/3/2008, 73 FR 73562 Division 2—Nitric Acid Manufacturing—Ozone Nonattainment Areas Section 117.4100 Applicability 5/30/2007 12/3/2008, 73 FR 73562 Section 117.4105 Emission Specifications 5/30/2007 12/3/2008, 73 FR 73562 Section 117.4125 Alternative Case Specific Specifications 5/30/2007 12/3/2008, 73 FR 73562 Section 117.4135 Initial Demonstration of Compliance 5/30/2007 12/3/2008, 73 FR 73562 Section 117.4140 Continuous Demonstration of Compliance 5/30/2007 12/3/2008, 73 FR 73562 Section 117.4145 Notification, Recordkeeping, and Reporting Requirements 5/30/2007 12/3/2008, 73 FR 73562 Section 117.4150 Control Plan Procedures 5/30/2007 12/3/2008, 73 FR 73562 Division 2—Nitric Acid Manufacturing—Ozone Nonattainment Areas” under Subchapter F to read “Division 3—Nitric Acid Manufacturing—General Section 117.4200 Applicability 5/30/2007 12/3/2008, 73 FR 73562 Section 117.4205 Emission Specifications 5/30/2007 12/3/2008, 73 FR 73562 Section 117.4210 Applicability of Federal New Source Performance Standards 5/30/2007 12/3/2008, 73 FR 73562 Subchapter G—General Monitoring and Testing Requirements Division 1—Compliance Stack Testing and Report Requirements Section 117.8000 Stack Testing Requirements 6/3//2015 4/13/2016, 81 FR 21750 Section 117.8010 Compliance Stack Test Reports 5/30/2007 12/3/2008, 73 FR 73562 Division 2—Emission Monitoring Section 117.8100 Emission Monitoring System Requirements for Industrial, Commercial, and Institutional Sources 5/30/2007 12/3/2008, 73 FR 73562 Section 117.8110 Emission Monitoring System Requirements for Utility Electric Generation Sources 5/30/2007 12/3/2008, 73 FR 73562 Section 117.8120 Carbon Monoxide (CO) Monitoring 5/30/2007 12/3/2008, 73 FR 73562 Section 117.8130 Ammonia Monitoring 5/30/2007 12/3/2008, 73 FR 73562 Section 117.8140 Emission Monitoring for Engines 5/30/2007 12/3/2008, 73 FR 73562 Subchapter H—Administrative Provisions Division 1—Compliance Schedules Section 117.9000 Compliance Schedule for Beaumont-Port Arthur Ozone Nonattainment Area Major Sources 5/30/2007 12/3/2008, 73 FR 73562 Section 117.9020 Compliance Schedule for Houston-Galveston-Brazoria Ozone Nonattainment Area Major Sources 5/30/2007 12/3/2008, 73 FR 73562 Section 117.9030 Compliance Schedule for Dallas-Fort Worth Eight-Hour Ozone Nonattainment Area Major Sources 6/3/2015 4/13/2016, 81 FR 21750 Section 117.9100 Compliance Schedule for Beaumont-Port Arthur Ozone Nonattainment Area Utility Electric Generation Sources 5/30/2007 12/3/2008, 73 FR 73562 Section 117.9120 Compliance Schedule for Houston-Galveston-Brazoria Ozone Nonattainment Area Utility Electric Generation Sources 5/30/2007 12/3/2008, 73 FR 73562 Section 117.9130 Compliance Schedule For Dallas-Fort Worth Eight-Hour Ozone Nonattainment Area Utility Electric Generation Sources 6/3/2015 4/13/2016, 81 FR 21750 Section 117.9200 Compliance Schedule for Houston-Galveston-Brazoria Ozone Nonattainment Area Minor Sources 5/30/2007 12/3/2008, 73 FR 73562 Section 117.9210 Compliance Schedule for Dallas-Fort Worth Eight-Hour Ozone Nonattainment Area Minor Sources 5/30/2007 12/3/2008, 73 FR 73562 Section 117.9300 Compliance Schedule for Utility Electric Generation in East and Central Texas 5/30/2007 12/3/2008, 73 FR 73562 Section 117.9320 Compliance Schedule for Cement Kilns 5/30/2007 1/14/2009, 74 FR 1927 Section 117.9340 Compliance Schedule for East Texas Combustion 5/30/2007 12/3/2008, 73 FR 73562 Section 117.9500 Compliance Schedule for Nitric Acid and Adipic Acid Manufacturing Sources 5/30/2007 12/3/2008, 73 FR 73562 Division 2—Compliance Flexibility Section 117.9800 Use of Emission Credits For Compliance 6/3/2015 4/13/2016, 81 FR 21750 Section 117.9810 Use of Emission Reductions Generated from the Texas Emissions Reduction Plan (TERP) 6/3/2015 5/11/2017, 82 FR 21925 Chapter 118 (Reg 8)—Control Of Air Pollution Episodes Section 118.1 Generalized Air Pollution Episodes 03/05/00 07/26/00 Section 118.2 Provisions Governing Generalized Episode Control 03/05/00 07/26/00 Section 118.3 Localized Air Pollution Episodes 03/05/00 07/26/00 Section 118.4 Hearings. 03/05/00 07/26/00 Section 118.5 Emission Reduction Plan 03/05/00 07/26/00 Section 118.6 Texas Air Pollution Episode Contingency Plan and Emergency Management Center 03/05/00 07/26/00 Chapter 122—Federal Operating Permits Program Subchapter B—Permit Requirements Division 2—Applicability Section 122.122 Potential to Emit 3/26/2014 11/10/2014
79 FR 66626The SIP does NOT include 30 TAC Section 122.122(e)(3), (e)(3)(A), or (e)(3)(B). (d) EPA-Approved State Source-Specific Requirements.
EPA-Approved Texas Source-Specific Requirements
Name of Source Permit or Order Number State Effective Date EPA Approval Date Comments Alcoa Inc., Rockdale, Milam County, Texas Agreed Order No. 2000–0032–SIP 4/19/2000 10/26/00, 65 FR 64155 H/GA, D/FW, and B/PA, Texas 1-hour ozone standard attainment demonstrations. Eastman Chemical Company, Texas Operations, Longview, Harrison County, Texas Agreed Order No. 2000–0033–SIP 4/19/2000 10/26/00, 65 FR 64156 H/GA, D/FW, and B/PA, Texas 1-hour ozone standard attainment demonstrations. Gould National Battery, Incorporated Order Nos. 92–09(k), 93–12, 99–0351–SIP 9/3/92, 6/2/93, 7/8/99, respectively 11/29/94, 11/29/94, October 13, 1999, respectively 92–09(k) and 93–12 were incorporated by reference in our approval of the lead SIP on 11/29/94, (59 FR 60905). Continental Airlines at George Bush Intercontinental Airport, Houston, Texas Agreed Order No. 2000–0826–SIP 10/18/00 11/14/2001, 66 FR 57222 HGA, Texas 1-hour ozone standard attainment demonstrations. Southwest Airlines at William Hobby Airport, Houston, Texas Agreed Order No. 2000–0827–SIP 12/06/00 11/14/2001, 66 FR 57222 HGA, Texas 1-hour ozone standard attainment demonstrations. American Airlines, American Eagle Airlines at D/FW International airport, Texas Agreed Order No. 2000–1149–SIP 5/23/2001 4/22/2002, 67 FR 19516 DFW, Texas 1–hour ozone standard attainment demonstrations. Delta Airlines at D/FW International Airport, Texas Agreed Order No. 2001–0221–AIR 5/23/2001 4/22/2002, 67 FR 19516 DFW, Texas 1–hour ozone standard attainment demonstrations. Southwest Airlines at Love Field, Texas Agreed Order No. 2001–0222–AIR 5/23/2001 4/22/2002, 67 FR 19516 DFW, Texas 1–hour ozone standard attainment demonstrations. ExxonMobil Oil Corporation, Jefferson County, Texas Agreed Order No. 2004–0846–SIP 12/15/2004 4/12/2005, 70 FR 18995 Huntsman Petrochemical Corporation, Port Neches Plant, Jefferson County, Texas Agreed Order No. 2004–0882–SIP 12/15/2004 4/12/2005, 70 FR 18995 Huntsman Petrochemical Corporation, Port Arthur Plant, Jefferson County, Texas Agreed Order No. 2004–0845–SIP 12/15/2004 4/12/2005, 70 FR 18995 ISP Elastomers, Jefferson County, Texas Agreed Order No. 2004–0842–SIP 12/15/2004 4/12/2005, 70 FR 18995 Mobil Chemical Company, Division of ExxonMobil Oil Corporation, Jefferson County, Texas Agreed Order No. 2004–0841–SIP 12/15/2004 4/12/2005, 70 FR 18995 Motiva Enterprises LLC, Jefferson County, Texas Agreed Order No. 2004–0843–SIP 12/15/2004 4/12/2005, 70 FR 18995 Premcor Refining Group, Inc., Jefferson County, Texas Agreed Order No. 2004–0844–SIP 12/15/2004 4/12/2005, 70 FR 18995 Mobil Chemical Company, Division of ExxonMobil Oil Corporation, Jefferson County, Texas Agreed Order No. 2004–1654–SIP 12/15/2004 4/12/2005, 70 FR 18995 American Electric Power Knox Lee Plant (Gregg Co.), Pirkey Plant (Harrison Co.), Wilkes Plant (Cass Co.) 2001–0878–RUL 03/13/2002 8/19/2005, 70 FR 48642 Texas Utilities Martin Lake plant (Rusk Co.), Monticello plant (Titus Co.) 2001–0879–RUL 03/13/2002 8/19/2005, 70 FR 48642 Eastman Chemical Company Longview plant (Harrison Co.) 2001–0880–RUL 03/13/2002 8/19/2005, 70 FR 48642 Alcoa Inc, Rockdale, Milam County, Texas Permit Number 48437 4/27/05 8/15/2008, 73 FR 47835 Exide Technologies Agreed Order No. 2011–0521–MIS 8/14/2012 6/29/2017, 82 FR 29430 TXI Operations LP (Texas Industries, Inc., TXI), Kiln #5, Ellis County, Texas Agreed Order No. 2017–1648–SIP 08/21/18 02/22/19, 84 FR 5602 DFW 2008 8-Hour ozone standard. (e) EPA approved nonregulatory provisions and quasi-regulatory measures.
EPA Approved Statutes in the Texas SIP
Title/Subject State approval/submittal date EPA approval date Comments Texas Clean Air Act (Article 4477–5), Vernon's Texas Civil Statutes 1/28/72 05/31/72, 37 FR 10895 As amended by S.B. 48 of 1969. Article 698d Air Pollution, Penal Code of Texas, 1925 1/28/72 05/31/72, 37 FR 10895 As amended by S.B. No. 5 of 1969. House Bill 322 1/28/72 05/31/72, 37 FR 10895 As passed by the 62nd Legislature of Texas, amending the Texas Clean Act regarding permits for construction or modification of facilities. Texas Clean Air (Tex. Rev. Civ. Stat. Ann. Art. 4477–5) as amended June 13, 1979 7/23/81 12/15/81, 46 FR 61125 Ref 52.2299(c)(29). Air Pollution (Tex. Rev. Civ. Stat. Ann. Art. 4477–5b) as amended January 1, 1974 7/23/81 12/15/81, 46 FR 61125 Ref 52.2299(c)(29). Texas Administrative Procedure and Texas Register Act 07/23/81 12/15/81, 46 FR 61125 Ref 52.2299(c)(29). (Tex. Rev. Civ. Stat. Ann. Art. 6252–13a) effective January 1, 1976 7/23/81 12/15/81, 46 FR 61125 Ref 52.2299(c)(29). Texas Open Record Act (Tex. Rev. Civ. Stat. Ann. Art. 6252–17a) as amended May 27, 1975 07/23/81 12/15/81, 46 FR 61125 Ref 52.2299(c)(29). Standards of Conduct of State Officers and Employees (Tex. Rev. Civ. Stat. Ann. Art. 6252–9b) effective January 1, 1974 7/23/81 12/15/81, 46 FR 61125 Ref 52.2299(c)(29). Department of Public Safety and Texas Air Control Board Rules and Regulations, Texas Vehicle Inspection Act Article XV 11/9/84 06/26/85, 50 FR 26362 Ref 52.2299(c)(61). Documentation to Authorize and Support the Implementation and Enforcement of the Texas Vehicle parameter Inspection and Maintenance Program, Appendix X, containing the following documents: A. Senate Bill 1205 11/9/84 06/26/85, 50 FR 26362 Ref 52.2299(c)(61). B. Letters of Commitment from Texas Department of Public Safety City of Houston Police Department and Harris County Sheriff 11/9/84 06/26/85, 50 FR 26362 Ref 52.2299(c)(61). C. Parameter Vehicle Emission Inspection and Maintenance Rules and Regulations for Official Vehicle Inspection Stations and Certified Inspectors, July 1, 1984 11/9/84 06/26/85, 50 FR 26362 Ref 52.2299(c)(61). Texas Motor Vehicle Laws, 1981–1982—Rules and Regulations for Official Vehicle Inspection Stations and Certified Inspectors, November 11, 1983, Sections A,B,C, pages C–1, C–16, C–17, C–18, C–26, C–27, and C–28, D, and E pages E–1, E–6, E–7, E–8, and E–9 11/9/84 06/26/85, 50 FR 26362 Ref 52.2299(c)(61). VIMTCM, Appendix AJ, Excerpted Senate Bill 725, section 35(d) and (g) effective September 1, 1985; and House Bill 1593 sections 21 and 22 effective June 18, 1987 09/30/85 and 12/21/87 02/09/89, 54 FR 06287 Ref 52.2299(c)(66). Texas Clean Air Act (TCAA), Texas Health and Safety Code Ann. (Vernon 1992), Section 382.0365, “Small Business Stationary Source Assistance Program”, enacted by the Texas 1991 legislative session and effective September 1, 1991 11/13/92 08/19/94, 59 FR 42759 Ref 52.2299(c)(85). Legal opinion letter dated October 15, 1992 from Kirk P. Watson, Chairman, TACB, to Mr. B.J. Wynne, III, Regional Administrator, EPA Region 6, regarding the composition of the Small Business Compliance Advisory Panel of Texas 11/13/92 08/19/94, 59 FR 42759 Ref 52.2299(c)(85). House Bill 1969, an act relating to motor vehicle registration, inspections, and providing penalties amending: (1) Sections 382.037 and 382.038 of the Texas Health and Safety Code; 11/12/93 and 03/09/94 08/22/94, 59 FR 43046 Ref 52.2299(c)(87). (2) Section 2 Chapter 88, General Laws, Acts of the 41st legislature, 2nd called session, 1929 (Article 6675a-2, Vernon's Texas Civil Statutes); 11/12/93 and 03/09/94 08/22/94, 59 FR 43046 Ref 52.2299(c)(87). (3) Title 116, Article 6675b–4, 6675b–4A, and 6675b–4B; 11/12/93 and 03/09/94 08/22/94, 59 FR 43046 Ref 52.2299(c)(87). (4) Section 141(d), and section 142(h), Uniform Act Regulating Traffic on Highways (Article 6701d, Vernon's Civil Statutes); 11/12/93 and 03/09/94 08/22/94, 59 FR 43046 Ref 52.2299(c)(87). (5) Section 4.202, County Road and Bridge Act (Article 6702–1, Vernon's Texas Civil Statutes). Signed by the Governor on 1/8/93, effective 08/30/93 11/12/93 and 03/09/94 08/22/94, 59 FR 43046 Ref 52.2299(c)(87). Texas Health and Safety Code (Vernon 1990), the Texas Clean Air Act, sections 382.017, 382.037, 382.038, effective September 1, 1991 11/12/93 and 3/09/94 8/22/94, 59 FR 43046 Ref 52.2299(c)(87). Order No. 93–23, as adopted November 10, 1993, and Order No. 94–02 as adopted February 16, 1994 11/12/93 and 03/09/94 08/22/94, 59 FR 43046 Ref 52.2299(c)(87). Texas Civil Statutes, Articles 6675a–1 to 6675b–2 and 6687–1. (Vernon 1993) 11/12/93 and 03/09/94 08/22/94, 59 FR 43046 Ref 52.2299(c)(87). Texas Portable Fuel Container State Implementation Plan All Affected 1997 Eight-Hour Ozone Standard Nonattainment And Near Nonattainment Areas In The State Of Texas 3/4/2010 2/24/2011, 76 FR 10249 EPA Approved Nonregulatory Provisions and Quasi-Regulatory Measures in the Texas SIP
Name of SIP provision Applicable geographic or nonattainment area State submittal/effective date EPA approval date Comments Public Hearings Statewide 2/8/72 05/31/72, 37 FR 10895 Ref 52.2299(c)(1). HydroCarbon Emission Data Statewide 5/2/72 05/31/72, 37 FR 10895 Ref 52.2299(c)(2). Source Surveillance Statewide 5/3/72 5/31/72, 37 FR 10895 Ref 52.2299(c)(2). Minor Revisions Statewide 07/31/72 10/28/72, 37 FR 23092 Ref 52.2299(c)(4). Attainment Date Corrections Statewide 11/10/72 2/8/73, 38 FR 03600 Ref 52.2299(c)(6). Classification Revisions for PM, SOx, and CO Statewide 03/21/75 4/18/77, 42 FR 20131 Ref 52.2299(c)(9). Administrative Revisions Statewide 4/20/77, 42 FR 20463 Ref 52.2299(c)(11). Air Quality Surveillance Plan Statewide 08/02/76 4/18/77, 42 FR 20131 Ref 52.2299(c)(12). Air Quality Surveillance Plan Statewide 08/12/77 3/7/78, 43 FR 09276 Ref 52.2299(c)(13). Administrative Revisions to Section X Statewide 7/6/77, 42 FR 34518 Ref 52.2299(c)(14). Administrative Revisions to Section IX Statewide 08/14/78 4/11/79, 44 FR 21644 Ref 52.2299(c)(16). Board Order No. 78–6 Corpus Christi, TX 07/24/78 09/24/79, 44 FR 55005 Ref 52.2299(c)(17) (see 52.2275) Draft inspection/mainte- nance legislation and study schedule Harris County 4/13/79 12/18/79, 44 FR 74831 Ref 52.2299(c)(18). Adopted inspection/maintenance legislation and administrative revisions Harris County 08/09/79 12/19/79, 44 FR 74831 Ref 52.2299(c)(19). Plan Revisions (Part D requirements) Statewide 4/13/79 03/25/80, 45 FR 19244 Ref 52.2299(c)(20). Administrative Revisions to Transportation Control Statewide 08/09/79 03/25/80, 45 FR 19244 Ref 52.2299(c)(21). Transportation Control Measures for Harris County Harris County 12/28/79 08/06/80, 45 FR 52148 Ref 52.2299(c)(24). Board Order No. 78–8 General Portland, Inc., New Braunfels, Comal County, TX 09/13/78 08/28/81, 46 FR 43425 Ref 52.2299(c)(26). (See 52.2276). Administrative Revision to Section I Statewide 07/23/81 11/13/81, 46 FR 55970 Ref 52.2299(c)(28). Administrative Revision to Section V Statewide 07/23/81 12/15/81, 46 FR 61125 Ref 52.2299(c)(29). Plan Revisions for Intergovernmental Consultation and Composition Statewide 4/13/79 03/29/82, 47 FR 13143 Ref 52.2299(c)(32). Texas Lead SIP and Board Order No. 82–11 Statewide excluding Dallas and El Paso areas 06/12/80 10/4/83, 48 FR 45248 Ref 52.2299(c)(41). Texas Air Pollution Emergency Episode Contingency Plan Statewide 05/18/82 10/07/82, 47 FR 44261 Ref 52.2299(c)(42). Administrative Revision to Section XII Statewide 07/06/82 10/25/82, 47 FR 47247 Ref 52.2299(c)(47). Administrative Revision to Section III N/A 08/17/82 03/31/83, 48 FR 13428 Ref 52.2299(c)(51). Administrative Revision to Section IX Statewide 06/22/83 11/07/83, 48 FR 51153 Ref 52.2299(c)(52). Lead Plan for Dallas County, TX Dallas County, TX 4/6/84 08/15/84, 49 FR 32580 Ref 52.2299(c)(54). Revisions to Lead Plan for Dallas County, TX Dallas County, TX 07/16/84 08/15/84, 49 FR 32580 Ref 52.2299(c)(55). Lead Plan for El Paso County El Paso County, TX 06/20/84 08/13/84, 49 FR 32190 Ref 52.2299(c)(56). Alternative Emission Control Plan for Exxon Baytown Refinery Baytown, TX 03/18/83 07/10/85, 50 FR 26992 Ref 52.2299(c)(60) (Board Order No. 83–2). Plan for Ozone Attainment in Harris County Harris County, TX 12/09/82, 1/3/84, 03/18/85 06/26/85, 50 FR 26362 Ref 52.2299(c)(61). Alternative Emission Reduction Plan for Continental Can Company, Longview, TX Gregg County, (Longview), TX 07/25/85 05/05/89, 54 FR 19373 Ref 52.2299(c)(64). Revision to Lead Plan for El Paso County and Board Order No. 87–14 El Paso County, TX 10/26/87 05/06/88, 53 FR 16263 Ref 52.2299(c)(65). Ozone Attainment Plan for Dallas and Tarrant Counties Dallas and Tarrant Counties, TX 09/30/85 and 12/21/87 02/09/89, 54 FR 06287 Ref 52.2299(c)(66). Vehicle Inspection and Maintenance Dallas-Fort Worth, El Paso County and Houston-Galveston-Brazoria 6/11/2015 10/7/2016, 81 FR 69684 VIMTCM, Appendix AK, Portions 1 through 6 Dallas and Tarrant Counties, TX 12/18/87 02/09/89, 54 FR 06287 Ref 52.2299(c)(66). VIMTCM, Appendix AM, Sections 1, 2, and 3 Dallas and Tarrant Counties, TX 12/18/87 02/09/89, 54 FR 06287 Ref 52.2299(c)(66). VIMTCM, Appendix AN Dallas and Tarrant Counties, TX 12/18/87 02/09/89, 54 FR 06287 Ref 52.2299(c)(66). Part II of the Visibility Protection Plan and Board Order No. 87–15 Big Bend and Guadalupe Mountain National Parks 09/18/87 02/23/89, 54 FR 07770 Ref 52.2299(c)(67). Alternative Emission Reduction Plan (Bubble) for E.I. DuPont de Nemours & Company's Sabine River Works, Orange, TX Orange County, TX 03/12/82 4/13/90 Ref 52.2299(c)(70). Revisions to Texas Air Pollution Episode Contingency Plan Statewide 10/02/87 09/06/90, 55 FR 36634 Ref 52.2299(c)(71). Revisions to Ozone Attainment Plan for Dallas and Tarrant Counties Dallas and Tarrant Counties, TX 03/05/90 08/03/90, 55 FR 31587 Ref 52.2299(c)(72). Revisions for Prevention of Significant Deterioration and Board Orders No. 85–07, 87–09, and 88–08 Statewide 12/11/85, 10/26/87,
9/29/8806/4/92, 57 FR 28098 Ref 52.2299(c)(73).
For Board Order 87–09, the provisions at paragraphs 7(a) and 7(b) have been replaced by EPA's SIP-approval of 30 TAC 39.411(f)(8)(A) and 39.605(1)(D). See 1/6/14, 79 FR 551Board Order No. 90–07 Tarrant County 06/22/90 10/12/90, 55 FR 41525 Ref 52.2299(c)(74). Board Order No. 92–19 Statewide 09/18/92 08/30/93, 58 FR 45457 Ref 52.2299(c)(76). Revision for Prevention of Significant Deterioration and Board Order No. 90–13 Statewide 12/14/90 09/09/94, 59 FR 46557 Ref 52.2299(c)(78). Revision addressing PM–10 nonattainment area requirements for El Paso and Board Orders 89–03 and 91–15 El Paso, TX 11/05/91 1/18/94, 59 FR 02535 Ref 52.2299(c)(79). City of El Paso, TX, Ordinance, Title 9 El Paso, TX 12/11/90 1/18/94, 59 FR 02535 Ref 52.2299(c)(79). Board Order No. 92–16 Ozone nonattainment areas 10/16/92 4/15/94, 59 FR 17943 Ref 52.2299(c)(81). Board Order No. 92–20 Ozone nonattainment areas 08/20/92 08/26/94, 59 FR 44039 Ref 52.2299(c)(82). Revision for the El Paso CO nonattainment area and Board Order No. 92–15 El Paso County, TX 09/18/92 09/12/94, 59 FR 46766 Ref 52.2299(c)(84). Small Business Stationary Source Technical and Environmental Compliance Assistance Program Statewide 11/13/92 08/19/94, 59 FR 42759 Ref 52.2299(c)(85). Board Order No. 92–22 Statewide 11/06/92 08/19/94, 59 FR 42759 Ref 52.2299(c)(85). Board Order No. 92–04 N/A 5/8/92 3/7/95, 60 FR 12438 Ref 52.2299(c)(88). Board Order No. 92–16 N/A 10/16/92 3/7/95, 60 FR 12438 Ref 52.2299(c)(88). Revision to Modify SLAMS and NAMS Monitoring Systems and Board Order No. 93–24 Statewide 11/10/93 10/4/94, 59 FR 50504 Ref 52.2299(c)(90). Employer Trip Reduction Program and Board Order No. 92–14 Brazoria, Chambers, Fort Bend, Galveston, Harris, Liberty, Montgomery, and Waller Counties 11/13/92 03/07/95, 60 FR 12442 Ref 52.2299(c)(91). Revision limiting SO2 by agreed orders 94–09 through 94–22 Certain Nonpermitted facilities in Harris County 08/03/94 03/06/95, 60 FR 12125 Ref 52.2299(c)(93). Revision addressing visible emissions with Board Orders 89–03, 90–12, 92–19, and 93–06 Statewide 08/21/89, 1/29/91, 10/15/92, and 8/4/93 05/8/96, 61 FR 20732 Ref 52.2299(c)(94). Alternative Emission Reduction (Bubble) for Shell Oil Company's Deer Park manufacturing complex Deer Park, TX 07/26/93 06/19/95, 60 FR 31915 Ref 52.2299(c)(95). Transportation Conformity and Board Order No. 94–40 Areas designated nonattainment and areas subject to a maintenance plan 10/12/94 11/8/95, 60 FR 56244 Ref 52.2299(c)(96). Revision to Permitting Regulations and Board Orders No. 85–07, 87–09, 87–17, 88–08, 89–06, 90–05, 91–10, 92–06, 92–18, and 93–17 Statewide 07/26/85, 07/17/87, 12/18/87, 07/15/88, 08/11/89, 05/18/90, 09/20/91, 5/8/92, 10/16/92, 08/16/93 09/27/95, 60 FR 49781 Ref 52.2299(c)(97). VOC RACT Negative Declarations Beaumont/Port Arthur, Dallas/Fort Worth, El Paso, Houston/Galveston 1/10/96 10/30/96, 61 FR 55894 Ref 52.2299(c)(103). VOC RACT Negative Declaration for SOCMI Batch Processing Source Category El Paso 1/10/96 6/7/07, 72 FR 31457. Alternate Control Strategy for Bell Helicopter Textron, Inc. Ft Worth, TX, Plant 1 facility 4/18/96 05/30/97, 62 FR 29297 Ref 52.2299(c)(100). Revisions to the Plan concerning Sulfur Dioxide in Milam County Rockdale, TX 10/15/92 and 09/20/95 09/30/97, 61 FR 49685 Ref 52.2299(c)(101). TNRCC Order No. 93–20, 94–06, 94–26, 94–0676–SIP The four ozone nonattainment areas in TX 11/10/93, 5/4/94, 07/13/94, 11/9/94 05/22/97, 62 FR 27964 Ref 52.2299(c)(104). 15% ROP Plan Beaumont/Port Arthur ozone nonattainment area 08/09/96 2/10/98, 63 FR 6659 Ref 52.2299(c)(107). 15% ROP Plan Dallas/Ft Worth, El Paso, and Houston/Galveston ozone nonattainment areas 8/9/96 11/10/98, 63 FR 62943 Ref 52.2299(c)(113) See also 52.2309. Lead Maintenance Plan for Gould National Battery, Incorporated Collin County 08/31/99 10/13/99, 64 FR 55425 Ref. 59 FR 60905 (11/29/94). Post 96 Rate of Progress Plan Houston, Texas 5/19/98 4/25/01 66 FR 20750 Originally submitted 11/9/94 and revised 8/9/96. Contingency Measures Houston, Texas 5/19/98 4/25/01 66 FR 20751 Originally submitted 11/9/94 and revised 8/9/96. Post 96 Rate of Progress Plan Houston, Texas 5/19/98 4/25/01 66 FR 20750 Originally submitted 11/9/94 and revised 8/9/96. Contingency Measures Houston, Texas 5/19/98 4/25/01 66 FR 20751 Originally submitted 11/9/94 and revised 8/9/96. Attainment Demonstration for the 1-hour Ozone NAAQS Houston/Galveston, TX 1 12/09/00 11/14/01, 66 FR 57195 Speed Limit Reduction Houston/Galveston, TX 9/26/02 11/14/02, 67 FR 68944 Section 6.3.12 Voluntary Mobile Emissions Program Houston/Galveston, TX 9/26/02 11/14/02, 67 FR 68944 Texas Senate Bill 5 Houston/Galveston, TX 9/26/00 11/14/01, 66 FR 57195 Transportation Control Measures Appendix I Houston/Galveston, TX 12/09/00 11/14/01, 66 FR 57195 Commitment to Mid-course review Houston/Galveston, TX 4/19/01 11/14/01, 66 FR 57195 Table 7.1–1 Enforceable Commitments Houston/Galveston, TX 9/26/01 11/14/01, 66 FR 57195 15% Rate of Progress Plan Houston/Galveston, TX 12/09/00 11/14/01, 66 FR 57195 Revisions to the 1990 Base Year Inventory Houston/Galveston, TX 12/09/00 11/14/01, 66 FR 57195 Reasonably Available Control Measure Analysis Houston/Galveston, TX 9/26/01 11/14/01, 66 FR 57195 Memorandum of Agreement between TNRCC and Houston Airport System Houston/Galveston Area Ozone Nonattainment Area 10/18/2000 11/14/01, 66 FR 57222 HGA, Texas 1-hour ozone standard attainment demonstrations. Vehicle Miles Traveled Offset Plan Houston/Galveston Ozone nonattainment area 05/09/00 11/14/01, 66 FR 57251 Originally submitted 11/12/93 and revised 11/06/94, 8/25/97, and 05/17/00. Memorandum of Agreement between TNRCC and the City of Dallas, Texas Dallas/Fort Worth Ozone Nonattainment Area. 5/23/01 4/22/02, 67 FR 19516 DFW, Texas 1-hour ozone standard attainment demonstrations. Memorandum of Agreement between TNRCC and the City of Fort Worth, Texas Dallas/Fort Worth Ozone Nonattainment Area. 5/23/01 4/22/02, 67 FR 19516 DFW, Texas 1-hour ozone standard attainment demonstrations. Memorandum of Agreement between TNRCC and the D/FW International Airport Board, Texas Dallas/Fort Worth Ozone Nonattainment Area. 5/23/01 4/22/02, 67 FR 19516 DFW, Texas 1-hour ozone standard attainment demonstrations. Transportation Control Measures SIP Revision All Nonattainment and Maintenance Areas 5/9/2000 12/5/2002, 67 FR 72382 Chapter 1. Introduction, Chapter 2. General, and Chapter 3. Criteria and Procedures. Section 179B Demonstration of Attainment for Carbon Monoxide for El Paso El Paso CO nonattainment area 09/27/95 07/02/03, 68 FR 39460 Supplemented 02/11/98. Carbon Monoxide On-Road Emissions Budget for Conformity El Paso CO nonattainment area 09/27/95 07/02/03 Contingency Measure for El Paso Carbon Monoxide Area El Paso CO nonattainment area 09/27/95 07/02/03, 68 FR 39460 Section 179B Attainment Demonstration Report El Paso ozone nonattainment area 10/03/94 6/10/04 Approval includes a revision submitted 08/09/96. Deferral of the post 1996 RFP El Paso ozone nonattainment area 6/10/04 Enforceable commitment to conduct additional modeling for the area as new data become available. This modeling effort will be conducted under the auspices of the 1983 La Paz Agreement between the United States and Mexico El Paso ozone nonattainment area 10/03/94 6/10/04 VOC and NOX Motor Vehicle Emissions Budget for Conformity El Paso ozone nonattainment area 12/11/97 6/10/04 Second 10-year maintenance plan for Victoria County Victoria 2/5/03 1/3/05, 70 FR 22 Post 1999 Rate of Progress Plan Houston/Galveston, TX 11/16/04 2/14/05, 70 FR 7407 Revisions to the 1990 Base Year Inventory Houston/Galveston, TX 11/16/04 2/14/05, 70 FR 7407 Approval of the Post-1996 Rate-of-Progress Plan and Motor Vehicle Emission Budgets Dallas-Fort Worth 10/25/1999 3/28/05, 70 FR 15592 Adjustments to the 1990 base year emissions inventory Dallas-Fort Worth 10/25/1999 3/28/05, 70 FR 15592 Approval of the 15% Rate of Progress Plan and the Motor Vehicle Emissions Budget Dallas-Fort Worth 9/8/1996 4/12/2005, 70 FR 18993 Memorandum of Agreement between Texas Council on Environmental Quality and the North Central Texas Council of Governments Providing Emissions Offsets to Dallas Fort Worth International Airport Dallas-Fort Worth 1/14/04 4/22/05, 70 FR 20816 Clean Air Action Plan, 8-hour ozone standard attainment demonstration, and Transportation Emission Reduction Measures (TERMs) for the Austin EAC area Bastrop, Caldwell, Hays, Travis and Williamson Counties, TX 12/06/04 8/19/05, 70 FR 48640 Clean Air Action Plan and 8-hour ozone standard attainment demonstration for the Northeast Texas Early Action Compact area Gregg, Harrison, Rusk, Smith and Upshur Counties, TX 12/06/04 8/19/05, 70 FR 48642 Clean Air Plan, 8-hour ozone standard attainment demonstration and Transportation Emission Reduction Measures (TERMs) for the San Antonio EAC area Bexar, Comal, Guadalupe, and Wilson Counties, TX 12/06/04 8/22/05, 70 FR 48877 Voluntary Mobile Emission Program Dallas/Fort Worth, TX 4/25/00 8/26/05, 70 FR 50208 Dallas—Fort Worth SIP, Appendix G; Transportation Control Measures in the Dallas/Fort Worth Ozone Nonattainment Area Dallas/Fort Worth Ozone Nonattainment Area 1/14/04 09/27/05, 70 FR 56374 Approval of the Speed Limits Local Initiative Measure in the DFW nine county area. Affected counties are Dallas, Tarrant, Collin, Denton, Parker, Johnson, Ellis, Kaufman, Rockwall Dallas-Fort Worth 9/16/2010 1/9/2014, 79 FR 1596 Recategorized as a Transportation Control Measure. Memorandum of Understanding Between the Texas Department of Transportation and the Texas Natural Resource Conservation Commission Statewide 08/15/02 12/12/2005, 70 FR 73380 Post 1996 Rate of Progress Plan Beaumont/Port Arthur, TX 11/16/04 2/22/06, 71 FR 8965 Revisions to the 1990 Base Year Inventory Beaumont/Port Arthur, TX 11/16/04 2/22/06, 71 FR 8965 Attainment Demonstration for Houston/Galveston/Brazoria (HGB) One-hour Ozone Nonattainment Area Adopting Strategy Based on NOX and Point Source Highly-Reactive VOC Emission Reductions Houston/Galveston, TX 12/1/04 09/06/06, 71 FR 52670 Texas Clean Air Interstate Rule Nitrogen Oxides Annual Trading Program Abbreviated SIP Revision Statewide 07/12/06 07/30/07, 72 FR 41453 Only CAIR Phase I NOX Annual and CSP Allocations approved into SIP. 2002 Emissions Inventory Collin, Dallas, Denton, Ellis, Johnson, Kaufman, Parker, Rockwall and Tarrant Counties, TX 4/27/05 8/15/2008, 73 FR 47835 Energy Efficiency Measures Collin, Dallas, Denton, Ellis, Johnson, Kaufman, Parker, Rockwall and Tarrant Counties, TX 4/27/05 8/15/2008, 73 FR 47835 El Paso County Carbon Monoxide Maintenance Plan El Paso, TX 2/13/08 8/4/08, 73 FR 45162 Dallas-Fort Worth 1997 8-hour ozone Attainment Demonstration SIP and its 2009 attainment MVEBs, RACM demonstration, and Failure-to-Attain Contingency Measures Plan Collin, Dallas, Denton, Ellis, Johnson, Kaufman, Parker, Rockwall and Tarrant Counties, TX May 23, 2007, November 7, 2008 January 14, 2009, 74 FR 1903 Conditional Approval. Transportation Control Measures Collin, Dallas, Denton, Ellis, Johnson, Kaufman, Parker, Rockwall and Tarrant Counties, TX May 23, 2007 January 14, 2009, 74 FR 1903 VMEP Collin, Dallas, Denton, Ellis, Johnson, Kaufman, Parker, Rockwall and Tarrant Counties, TX May 23, 2007 January 14, 2009, 74 FR 1903 VOC RACT finding for the 1-hour ozone NAAQS and the 1997 8-hour ozone NAAQS Collin, Dallas, Denton, Ellis, Johnson, Kaufman, Parker, Rockwall and Tarrant Counties, TX May 23, 2007 January 14, 2009, 74 FR 1903 El Paso County 1997 8-Hour Ozone Maintenance Plan El Paso, TX 1/11/06 1/15/09, 74 FR 2387 Approval of the 1997 8-hour Ozone 15% Reasonable Further Progress Plan, and 2008 RFP Motor Vehicle Emission Budgets Dallas/Fort Worth, TX 05/23/07 10/7/08, 73 FR 58475 Revised 2002 Base Year Emissions Inventory Dallas/Fort Worth, TX 05/23/07 10/7/08, 73 FR 58475 Approval of the 1997 8-hour Ozone 15% Reasonable Further Progress Plan, and 2008 RFP Motor Vehicle Emission Budgets Houston-Galveston-Brazoria, TX 5/23/07 4/22/09, 74 FR 18298 2002 Base Year Emissions Inventory Houston-Galveston-Brazoria, TX 5/23/07 4/22/09, 74 FR 18298 VOC and NOX RACT demonstration for the 1-hour ozone NAAQS Beaumont/Port Arthur Area: Hardin, Jefferson, and Orange Counties 9/28/2005 7/10/2009, 74 FR 33146 Redesignation Request for the 1997 8-hour Ozone NAAQS (Hardin, Jefferson, and Orange Counties) Beaumont/Port Arthur, TX 12/10/2008 10/20/2010, 75 FR 64675 Determination of Attainment for the 1-hour Ozone NAAQS (Hardin, Jefferson, and Orange Counties) Beaumont/Port Arthur, TX 12/10/2008 10/20/2010, 75 FR 64675 2002 Base Year Emissions Inventory
(1997 8-hour Ozone NAAQS)Beaumont/Port Arthur, TX 12/10/2008 10/20/2010, 75 FR 64675 Texas Clean-Fuel Vehicle Program Equivalency Demonstration (1-hour Ozone NAAQS) Beaumont/Port Arthur, TX 12/10/2008 10/20/2010, 75 FR 64675 Substitute Control Measures for the SIP-Approved Failure-to-attain Contingency Measures (1-hour Ozone NAAQS) Beaumont/Port Arthur, TX 12/10/2008 10/20/2010, 75 FR 64675 Post 1996 Rate of Progress Plan Contingency Measures (1-hour Ozone NAAQS) Beaumont/Port Arthur, TX 11/16/2004 10/20/2010, 75 FR 64675 Maintenance Plan (1997 8-hour Ozone NAAQS, CAA Section 175A) Beaumont/Port Arthur, TX 12/10/2008 10/20/2010, 75 FR 64675 2021 Motor Vehicle Emissions Budget (1997 8-hour Ozone NAAQS) Beaumont/Port Arthur, TX 12/10/2008 10/20/2010, 75 FR 64675 Infrastructure and Interstate Transport for the 1997 Ozone and the 1997 and 2006 PM2.5 NAAQS. Statewide 12/12/2007, 3/11/2008, 4/4/2008, 5/1/2008, 11/23/2009 12/28/2011, 76 FR 81371 Approval for CAA elements 110(a)(2)(A), (B), (E), (F), (G), (H), (K), (L), and (M). Full approval for CAA elements 110(a)(2)(C), (D)(i)(II), (D)(ii) and (J) with approval of the GHG PSD revision (11/10/2014, 79 FR66626). 1997 and 2006 PM2.5 element D(i)(I) approved 5/14/2018, 83 FR 22208. 1997 ozone element D(i)(I) approved 12/6/2018, 83 FR 62720 Letter of explanation and interpretation of the Texas SIP for NSR Reform Statewide 5/3/2012 10/25/2012, 77 FR 65119 Letter dated 5/3/2012 from TCEQ to EPA explains and clarifies TCEQ's interpretation of section 116.12(22); and section 116.186(a), (b)(9), and (c)(2). On-Road Mobile Source Emissions Inventory and Motor Vehicle Emissions Budget Update Beaumont/Port Arthur, TX 12/10/2012 2/4/2013, 78 FR 7673 MOVES update to motor vehicle emissions budgets. Voluntary Mobile Emission Reduction Program (VMEP) Brazoria, Chambers, Fort Bend, Galveston, Harris, Liberty, Montgomery and Waller Counties, TX June 13, 2007 4/2/13, 78 FR 19599 NOX RACT finding for the 1997 8-hour ozone NAAQS Brazoria, Chambers, Fort Bend, Galveston, Harris, Liberty, Montgomery and Waller Counties, TX April 6, 2010 4/2/13, 78 FR 19599 VOC RACT finding for the 1997 8-hour ozone NAAQS Brazoria, Chambers, Fort Bend, Galveston, Harris, Liberty, Montgomery and Waller Counties, TX April 6, 2010 4/2/13, 78 FR 19599 For selected categories. Victoria County 1997 8-Hour Ozone Maintenance Plan Victoria, TX 7/28/2010 8/8/2013, 78 FR 48318 Reasonable Further Progress Plan (RFP), RFP Contingency Measures Houston-Galveston-Brazoria, TX 4/1/2010, 5/6/2013, 79 FR 51 RFP Motor Vehicle Emission Budgets (2008, 2011, 2014, 2017 and 2018) Houston-Galveston-Brazoria, TX 5/6/2013, 79 FR 51 Vehicle miles traveled offset analysis Houston-Galveston-Brazoria, TX 5/6/2013, 79 FR 51 Houston-Galveston-Brazoria 1997 8-hour Ozone NAAQS Attainment Demonstration SIP and its MECT and HECT air pollution control program revisions, VMEP measures and TCMs, 2018 MVEB, RACM demonstration, and Failure to attain contingency measure plan Houston-Galveston-Brazoria, TX 4/6/2010
5/6/20131/2/2014, 79 FR 57 Stage II Vapor Recovery Program SIP Statewide 10/9/2013 3/17/14, 79 FR 14611 VOC RACT negative declaration for Fiberglass Boat Manufacturing Materials, Leather Tanning and Finishing, Surface Coating for Flat Wood Paneling, Letterpress Printing, Automobile and Light-Duty Truck Assembly Coating, Rubber Tire Manufacturing, and Vegetable Oil Manufacturing Operations Brazoria, Chambers, Fort Bend, Galveston, Harris, Liberty, Montgomery and Waller Counties, TX April 6, 2010. VOC RACT finding for the 1997 8-hour ozone NAAQS, except for the 2006–2010 EPA-issued CTG series Brazoria, Chambers, Fort Bend, Galveston, Harris, Liberty, Montgomery and Waller Counties, TX April 6, 2010 4/15/14, 79 FR 21144 Flexible Permits Interpretative Letter from the TCEQ Statewide December 9, 2013 7/14/2014
79 FR 40666Clarifies how the TCEQ implements the rules regarding (1) Director discretion; (2) BACT; (3) changes made by Standard Permits or Permits by Rule; (4) compliance with permit and permit application; and (5) start-up and shutdown emissions to ensure compliance with CAA requirements. Vehicle Inspection and Maintenance Dallas-Fort Worth, El Paso County and Houston-Galveston-Brazoria 6/11/2015 10/7/2016, 81 FR 69684 VOC RACT finding for Lithographic Printing under the 1997 8-hour ozone NAAQS, including the 2006 EPA-issued CTG Houston-Galveston-Brazoria (Brazoria, Chambers, Fort Bend, Galveston, Harris, Liberty, Montgomery and Waller Counties, TX) 4/6/2010 8/4/2014, 79 FR 45106 HGB as Severe. VOC RACT finding for Lithographic Printing under the 1997 8-hour ozone NAAQS, including the 2006 EPA-issued CTG Dallas-Fort Worth (Collin, Dallas, Denton, Ellis, Johnson, Kaufman, Parker, Rockwall, and Tarrant Counties, TX) 4/6/2010 8/4/2014, 79 FR 45106 DFW as Moderate and Serious. Conformity with the National Ambient Air Quality Standards Statewide 10/28/2011 7/18/2014, 79 FR 41908 The General Conformity SIP is removed from the Texas SIP; the federal rules at 40 CFR Part 93, subpart B apply now. Commitment Letter from the TCEQ regarding regulation of PSD pollutants into the future Statewide December 2, 2013 11/10/2014, 79 FR 66626 Clarifies that the TCEQ has the authority under the Texas Clean Air Act to apply the Texas PSD program to all pollutants newly subject to regulation, including non-NAAQS pollutants into the future. Clarification Letter from the TCEQ regarding authority to administer EPA issued GHG PSD permits Statewide January 13, 2014 11/10/2014, 79 FR 66626 Clarifies that the TCEQ has the general authority to administer EPA issued GHG PSD permits. Also clarifies that the TCEQ has authority to process and issue any and all subsequent PSD actions relating to EPA issued GHG PSD permits. Clarification Letter from the TCEQ regarding Judicial Review for PSD Permits Statewide May 30, 2014 11/10/2014, 79 FR 66626 Clarifies the judicial review process for Texas PSD permits. Failure-to-Attain Contingency Measures Plan Collin, Dallas, Denton, Ellis, Johnson, Kaufman, Parker, Rockwall and Tarrant Counties, TX 3/10/2010 11/12/2014, 79 FR 67071] Reasonable Further Progress Plan (RFP), RFP Contingency Measures, RFP Motor Vehicle Emission Budgets for 2011 and 2012, and Revised 2002 Base Year Emissions Inventory Collin, Dallas, Denton, Ellis, Johnson, Kaufman, Parker, Rockwall and Tarrant Counties, TX 12/7/2011 11/12/2014, 79 FR 67071] Enhanced Ambient Monitoring and the Clean-fuel Fleet Programs Collin, Dallas, Denton, Ellis, Johnson, Kaufman, Parker, Rockwall and Tarrant Counties, TX 12/7/2011 11/12/2014, 79 FR 67071] DFW nine-county area ESL TCM to traffic signalization TCMs Dallas-Fort Worth: Dallas, Tarrant, Collin, Denton, Parker, Johnson, Ellis, Kaufman and Rockwall Counties 9/16/2010 1/9/2014, 79 FR 1596 DFW ESLs recategorized as TCM 1/9/2014, substituted with traffic signalization TCMs 11/3/2014. 2011 Emissions Inventory for the 2008 Ozone NAAQS Dallas-Fort Worth and Houston-Galveston-Brazoria Ozone Nonattainment Areas 7/16/2014 2/20/2015, 80 FR 9204 NOX RACT finding for the 1997 8-hour ozone NAAQS Collin, Dallas, Denton, Tarrant, Ellis, Johnson, Kaufman, Parker, and Rockwall Counties, TX 1/17/12 3/27/15, 80 FR 16291 DFW as Moderate and Serious. VOC RACT finding of negative declaration for Fiberglass Boat Manufacturing Materials, Ship Building and Ship Repair Coating, Leather Tanning and Finishing, Surface Coating for Flat Wood Paneling, Vegetable Oil Manufacturing, Letterpress Printing, Plywood Veneer Dryers, Rubber Tire Manufacturing, and Batch Processes Operations Collin, Dallas, Denton, Tarrant, Ellis, Johnson, Kaufman, Parker, and Rockwall Counties, TX 1/17/12 3/27/15, 80 FR 16291 DFW as Moderate and Serious. VOC RACT finding for all sectors under the 1997 8-hour ozone NAAQS, including the 2006–2008 EPA-issued CTG series and non-CTG major sources Collin, Dallas, Denton, Tarrant, Ellis, Johnson, Kaufman, Parker, and Rockwall Counties, TX 1/17/12 3/27/15, 80 FR 16291 DFW as Moderate and Serious. VOC RACT finding for all sectors under the 1997 8-hour ozone NAAQS, including the 2006–2008 EPA-issued CTG series and non-CTG major sources Brazoria, Chambers, Fort Bend, Galveston, Harris, Liberty, Montgomery and Waller Counties, TX 1/17/12 3/27/15, 80 FR 16291 HGB as Severe. Revision to El Paso PM10 Attainment Demonstration SIP (dust control contingency measures) El Paso, TX 3/7/2012 12/14/2015, 80 FR 77254 Texas Regional Haze SIP Statewide 3/19/2009 1/5/2016, 81 FR 350 The following sections are not approved as part of the SIP: The reasonable progress four-factor analysis, reasonable progress goals and the calculation of the emission reductions needed to achieve the uniform rates of progress for the Guadalupe Mountains and Big Bend; calculation of natural visibility conditions; calculation of the number of deciviews by which baseline conditions exceed natural visibility conditions; long-term strategy consultations with Oklahoma; Texas securing its share of reductions necessary to achieve the reasonable progress goals at Big Bend, the Guadalupe Mountains, and the Wichita Mountains; technical basis for its long-term strategy and emission limitations and schedules for compliance to achieve the RPGs for Big Bend, the Guadalupe Mountains and Wichita Mountains. Infrastructure and Transport SIP Revision for the 2010 SO2 NAAQS Statewide 5/6/2013 1/11/2016, 81 FR 1128 Approval for CAA elements 110(a)(2)(A), (B), (C), (D)(i)(II) (PSD portion), D(ii), (E), (F), (G), (H), (J), (K), (L), and (M). Infrastructure and Interstate Transport for the 2008 Pb NAAQS Statewide 9/8/2011, 10/13/2011 1/14/2016, 81 FR 1882, Infrastructure and Transport SIP Revisions for the 2010 Nitrogen Dioxide Standard Statewide 12/7/2012 9/9/2016, 81 FR 62378 Approval for 110(a)(2)(A), (B), (C), (D)(i) (portions pertaining to nonattainment and interference with maintenance), D(ii), (E), (F), (G), (H), (K), (L) and (M). Approval for 110(a)(2)(J) on 10/7/2016, 81 FR 69684 Infrastructure and Transport SIP Revisions for the 2008 Ozone Standard Statewide 12/13/2012 9/9/2016, 81 FR 62375 Approval for 110(a)(2)(A), (B), (C), (D)(i) (portion pertaining to PSD), D(ii), (E), (F), (G), (H), (K), (L) and (M). Approval for 110(a)(2)(J) 10/7/2016, 81 FR 69684 Revisions to the State Implementation Plan (SIP) Concerning the Qualified Facility Program as Authorized by Senate Bill 1126 Statewide 9/15/2010 9/9/2016, 81 FR 62385 DFW nine-county area US67/IH–35E HOV Lane TCM to traffic signalization TCMs Dallas-Fort Worth: Dallas, Tarrant, Collin, Denton, Parker, Johnson, Ellis, Kaufman and Rockwall Counties 8/16/2016 11/9/2016, 81 FR 78724 Austin Early Action Compact area Vehicle Inspection and Maintenance Travis and Williamson Counties 6/11/2015 10/7/2016, 81 FR 69684 DFW Reasonable Further Progress (RFP) Plan, RFP Contingency Measures, RFP Motor Vehicle Emission Budgets for 2017, and Revised 2011 Base Year Emissions Inventory for the 2008 Ozone NAAQS Collin, Dallas, Denton, Ellis, Johnson, Kaufman, Parker, Rockwall, Tarrant and Wise Counties, TX 7/10/2015 12/7/2016, 81 FR 88125 Supplement submitted on April 22, 2016. Discrete Emissions Reduction Credits (DERC) SIP Collin, Dallas, Denton, Ellis, Johnson, Kaufman, Parker, Rockwall and Tarrant Counties, TX 12/10/2008 5/11/2017, 82 FR 21925 Vehicle Inspection and Maintenance, Nonattainment New Source Review and Emission Statement Requirements for the 2008 Ozone NAAQS Houston-Galveston-Brazoria, TX 12/29/2016 5/15/2017, 82 FR 22294 Vehicle Inspection and Maintenance and Nonattainment New Source Review Requirements for the 2008 Ozone NAAQS Dallas-Fort Worth, TX 7/6/2016 6/14/2017, 82 FR 27125 Second 10-year Lead maintenance plan for 1978 Lead NAAQS Collin County, TX 9/15/2009 6/29/2017, 82 FR 29430 Lead Attainment Demonstration for 2008 Lead NAAQS Collin County, TX 10/10/2012 6/29/2017, 82 FR 29430 Maintenance Plan for 2008 Lead NAAQS Collin County, TX 11/02/2016 6/29/2017, 82 FR 29430 Second 10-year Carbon Monoxide maintenance plan (limited maintenance plan) for the El Paso CO area El Paso, TX 9/21/2016 9/8/2017, 82 FR 42457 NOX RACT finding under the 2008 8-Hour ozone NAAQS Collin, Dallas, Denton, Tarrant, Ellis, Johnson, Kaufman, Parker, Rockwall, and Wise Counties, TX 07/10/15 09/22/17, 82 FR 44322 DFW as Moderate and Serious. NOX RACT finding of negative declarations for nitric acid and adipic acid operations under the 2008 8-Hour ozone NAAQS Collin, Dallas, Denton, Tarrant, Ellis, Johnson, Kaufman, Parker, Rockwall, and Wise Counties, TX 07/10/15 09/22/17, 82 FR 44322 DFW as Moderate and Serious. Texas Regional Haze BART Requirement for EGUs for PM Statewide 3/31/2009 10/17/2017, 82 FR 48363 DFW VOC RACT Demonstration DFW 2008 Ozone NAAQS non-attainment area 7/10/2015 12/21/2017, 82 FR 60547 Infrastructure and Interstate Transport for the 2012 PM2.5 NAAQS Statewide 12/1/2015 6/5/2018, 83 FR 25922 Approval for CAA elements 110(a)(2)(A), (B), (C), (D)(i)(I), (D)(i)(II) (portion pertaining to PSD), (D)(ii), (E), (F), (G), (H), (J), (K), (L), and (M). 6/5/2018, 83 FR 25921 Emission Statement Requirements for the 2008 Ozone NAAQS Dallas-Fort Worth, TX 8/21/2018 12/4/2018, 83 FR 62470 HGB Area Reasonable Further Progress (RFP) Plan, RFP Contingency Measures, RFP Motor Vehicle Emission Budgets for 2017, and Revised 2011 Base Year Emissions Inventory for the 2008 Ozone NAAQS Brazoria, Chambers, Fort Bend, Galveston, Harris, Liberty, Montgomery and Waller Counties, TX 12/29/2016 2/13/2019, 84 FR 3710 NOX RACT finding under the 2008 8-Hour ozone NAAQS Collin, Dallas, Denton, Tarrant, Ellis, Johnson, Kaufman, Parker, Rockwall, and Wise Counties, TX 8/21/2018 02/22/19, 84 FR 5602 DFW as Moderate and Serious, also converts conditional approval 09/22/17, 82 FR 44322 to full approval. HGB VOC and NOX RACT Finding, except for the 2016 EPA-issued CTG for the Oil and Natural Gas Industry, EPA–453/B–16–001 HGB 2008 Ozone NAAQS non-attainment area 12/29/2016 4/30/2019, 84 FR 18145 Vegetable Oil Mfg category, previously sited under negative declarations for HGB area, is added to RACT determinations. Infrastructure and Interstate Transport for the 2015 Ozone NAAQS Statewide 8/17/2018 9/23/2019, 84 FR 49667 Approval for CAA elements 110(a)(2)(A), (B), (C), (D)(i)(II) (portion pertaining to PSD), (D)(ii), (E), (F), (G), (H), (J), (K), (L), and (M). Houston-Galveston-Brazoria Redesignation Request and Maintenance Plan for the 1-hour and 1997 8-hour Ozone Standards Houston-Galveston-Brazoria, TX 12/12/2018 2/14/2020, 85 FR 8426 Dallas-Fort Worth Redesignation Request and Maintenance Plan for the 1-hour and 1997 8-hour Ozone Standards Dallas Fort-Worth, TX 3/29/2019 4/6/2020, 85 FR 19108 Beaumont-Port Arthur Second 10-Year Maintenance Plan for the 1997 8-hour Ozone Standard Hardin, Jefferson and Orange Counties 2/5/2019 9/2/2020, 85 FR 54506 Reasonable Further Progress Plan (RFP), RFP Motor Vehicle Emission Budgets for 2020, and Revised 2011 Base Year Emissions Inventory Brazoria, Chambers, Fort Bend, Galveston, Harris, Liberty, Montgomery, and Waller Counties, TX 3/4/2020 5/10/2021, 86 FR 24718 2017 Emissions Inventory for the 2015 Ozone NAAQS Dallas-Fort Worth, Houston Galveston-Brazoria, and Bexar County Ozone Nonattainment Areas 6/24/20 6/29/2021 86 FR 34140 Nonattainment New Source Review and Emission Statement Requirements for the 2015 Ozone NAAQS Dallas-Fort Worth, Houston Galveston-Brazoria, and Bexar County Ozone Nonattainment Areas June 24, 2020 9/9/2021, 86 FR 50458 Revised 2011 Base Year Emissions Inventory Collin, Dallas, Denton, Ellis, Johnson, Kaufman, Parker, Rockwall, Tarrant, and Wise Counties, TX 3/4/2020 9/16/2022, 87 FR 56893 Nonattainment New Source Review for the 2008 Ozone NAAQS Dallas-Fort Worth and Houston-Galveston-Brazoria nonattainment areas 5/13,2020 10/3/2022, 87 FR 59699 For the Serious classification. Reasonable Further Progress (RFP) Plan and RFP Motor Vehicle Emission Budgets for 2020 Collin, Dallas, Denton, Ellis, Johnson, Kaufman, Parker, Rockwall, Tarrant and Wise Counties, TX 3/4/2020 4/24/2023 88 FR 24698 Enhanced Vehicle Inspection and Maintenance (I/M) Requirement for the 2008 Ozone NAAQS Serious Nonattainment Areas Dallas-Fort Worth and Houston-Galveston-Brazoria Ozone Nonattainment Areas 5/13/2020 9/8/2023, 88 FR 61976 [64 FR 36589, July 7, 1999]