Code of Federal Regulations (Last Updated: October 10, 2024) |
Title 40 - Protection of Environment |
Chapter I - Environmental Protection Agency |
SubChapter C - Air Programs |
Part 60 - Standards of Performance for New Stationary Sources |
Subpart A - General Provisions |
§ 60.1 - Applicability. |
§ 60.2 - Definitions. |
§ 60.3 - Units and abbreviations. |
§ 60.4 - Address. |
§ 60.5 - Determination of construction or modification. |
§ 60.6 - Review of plans. |
§ 60.7 - Notification and record keeping. |
§ 60.8 - Performance tests. |
§ 60.9 - Availability of information. |
§ 60.10 - State authority. |
§ 60.11 - Compliance with standards and maintenance requirements. |
§ 60.12 - Circumvention. |
§ 60.13 - Monitoring requirements. |
§ 60.14 - Modification. |
§ 60.15 - Reconstruction. |
§ 60.16 - Priority list. |
§ 60.17 - Incorporations by reference. |
§ 60.18 - General control device and work practice requirements. |
§ 60.19 - General notification and reporting requirements. |
Table 1 to Subpart A of Part 60 - Detection Sensitivity Levels (grams per hour) |
Subpart AA - Standards of Performance for Steel Plants: Electric Arc Furnaces Constructed After October 21, 1974, and On or Before August 17, 1983 |
§ 60.270 - Applicability and designation of affected facility. |
§ 60.271 - Definitions. |
§ 60.272 - Standard for particulate matter. |
§ 60.273 - Emission monitoring. |
§ 60.274 - Monitoring of operations. |
§ 60.275 - Test methods and procedures. |
§ 60.276 - Recordkeeping and reporting requirements. |
Subpart AAa - Standards of Performance for Steel Plants: Electric Arc Furnaces and Argon-Oxygen Decarbonization Vessels Constructed After August 17, 1983, and On or Before May 16, 2022 |
§ 60.530 - Am I subject to this subpart? |
§ 60.531 - What definitions must I know? |
§ 60.532 - What standards and associated requirements must I meet and by when? |
§ 60.533 - What compliance and certification requirements must I meet and by when? |
§ 60.534 - What test methods and procedures must I use to determine compliance with the standards and requirements for certification? |
§ 60.535 - What procedures must I use for EPA approval of a test laboratory or EPA approval of a third-party certifier? |
§ 60.536 - What requirements must I meet for permanent labels, temporary labels (hangtags), and owner's manuals? |
§ 60.537 - What records must I keep and what reports must I submit? |
§ 60.538 - What activities are prohibited under this subpart? |
§ 60.539 - What hearing and appeal procedures apply to me? |
§ 60.270a - Applicability and designation of affected facility. |
§ 60.271a - Definitions. |
§ 60.272a - Standard for particulate matter. |
§ 60.273a - Emission monitoring. |
§ 60.274a - Monitoring of operations. |
§ 60.275a - Test methods and procedures. |
§ 60.276a - Recordkeeping and reporting requirements. |
§ 60.539a - Who implements and enforces this subpart? |
§ 60.539b - What parts of the General Provisions do not apply to me? |
Other Monitoring Requirements |
§ 60.1315 - Must I meet other requirements for continuous monitoring? |
§ 60.1320 - How do I monitor the load of my municipal waste combustion unit? |
§ 60.1325 - How do I monitor the temperature of flue gases at the inlet of my particulate matter control device? |
§ 60.1330 - How do I monitor the injection rate of activated carbon? |
§ 60.1335 - What is the minimum amount of monitoring data I must collect with my continuous parameter monitoring systems and is the data collection requirement enforceable? |
Introduction |
§ 60.1000 - What does this subpart do? |
§ 60.1005 - When does this subpart become effective? |
Recordkeeping |
§ 60.1340 - What records must I keep? |
§ 60.1345 - Where must I keep my records and for how long? |
§ 60.1350 - What records must I keep for the materials separation plan and siting analysis? |
§ 60.1355 - What records must I keep for operator training and certification? |
§ 60.1360 - What records must I keep for stack tests? |
§ 60.1365 - What records must I keep for continuously monitored pollutants or parameters? |
§ 60.1370 - What records must I keep for municipal waste combustion units that use activated carbon? |
Continuous Emission Monitoring |
§ 60.1225 - What types of continuous emission monitoring must I perform? |
§ 60.1230 - What continuous emission monitoring systems must I install for gaseous pollutants? |
§ 60.1235 - How are the data from the continuous emission monitoring systems used? |
§ 60.1240 - How do I make sure my continuous emission monitoring systems are operating correctly? |
§ 60.1245 - Am I exempt from any appendix B or appendix F requirements to evaluate continuous emission monitoring systems? |
§ 60.1250 - What is my schedule for evaluating continuous emission monitoring systems? |
§ 60.1255 - What must I do if I choose to monitor carbon dioxide instead of oxygen as a diluent gas? |
§ 60.1260 - What is the minimum amount of monitoring data I must collect with my continuous emission monitoring systems and is the data collection requirement enforceable? |
§ 60.1265 - How do I convert my 1-hour arithmetic averages into the appropriate averaging times and units? |
§ 60.1270 - What is required for my continuous opacity monitoring system and how are the data used? |
§ 60.1275 - What additional requirements must I meet for the operation of my continuous emission monitoring systems and continuous opacity monitoring system? |
§ 60.1280 - What must I do if any of my continuous emission monitoring systems are temporarily unavailable to meet the data collection requirements? |
Reporting |
§ 60.1375 - What reports must I submit before I submit my notice of construction? |
§ 60.1380 - What must I include in my notice of construction? |
§ 60.1385 - What reports must I submit after I submit my notice of construction and in what form? |
§ 60.1390 - What are the appropriate units of measurement for reporting my data? |
§ 60.1395 - When must I submit the initial report? |
§ 60.1400 - What must I include in my initial report? |
§ 60.1405 - When must I submit the annual report? |
§ 60.1410 - What must I include in my annual report? |
§ 60.1415 - What must I do if I am out of compliance with the requirements of this subpart? |
§ 60.1420 - If a semiannual report is required, when must I submit it? |
§ 60.1425 - What must I include in the semiannual out-of-compliance reports? |
§ 60.1430 - Can reporting dates be changed? |
Emission Limits |
§ 60.1210 - What pollutants are regulated by this subpart? |
§ 60.1215 - What emission limits must I meet? By when? |
§ 60.1220 - What happens to the emission limits during periods of startup, shutdown, and malfunction? |
Preconstruction Requirements: Materials Separation Plan |
§ 60.1050 - Who must submit a materials separation plan? |
§ 60.1055 - What is a materials separation plan? |
§ 60.1060 - What steps must I complete for my materials separation plan? |
§ 60.1065 - What must I include in my draft materials separation plan? |
§ 60.1070 - How do I make my draft materials separation plan available to the public? |
§ 60.1075 - When must I accept comments on the materials separation plan? |
§ 60.1080 - Where and when must I hold a public meeting on my draft materials separation plan? |
§ 60.1085 - What must I do with any public comments I receive during the public comment period on my draft materials separation plan? |
§ 60.1090 - What must I do with my revised materials separation plan? |
§ 60.1095 - What must I include in the public meeting on my revised materials separation plan? |
§ 60.1100 - What must I do with any public comments I receive on my revised materials separation plan? |
§ 60.1105 - How do I submit my final materials separation plan? |
Preconstruction Requirements: Siting Analysis |
§ 60.1110 - Who must submit a siting analysis? |
§ 60.1115 - What is a siting analysis? |
§ 60.1120 - What steps must I complete for my siting analysis? |
§ 60.1125 - What must I include in my siting analysis? |
§ 60.1130 - How do I make my siting analysis available to the public? |
§ 60.1135 - When must I accept comments on the siting analysis and revised materials separation plan? |
§ 60.1140 - Where and when must I hold a public meeting on the siting analysis? |
§ 60.1145 - What must I do with any public comments I receive during the public comment period on my siting analysis? |
§ 60.1150 - How do I submit my siting analysis? |
Definitions |
§ 60.1465 - What definitions must I know? |
Equations |
§ 60.1460 - What equations must I use? |
Applicability |
§ 60.1010 - Does this subpart apply to my municipal waste combustion unit? |
§ 60.1015 - What is a new municipal waste combustion unit? |
§ 60.1020 - Does this subpart allow any exemptions? |
§ 60.1025 - Do subpart E new source performance standards also apply to my municipal waste combustion unit? |
§ 60.1030 - Can the Administrator delegate authority to enforce these Federal new source performance standards to a State agency? |
§ 60.1035 - How are these new source performance standards structured? |
§ 60.1040 - Do all five components of these new source performance standards apply at the same time? |
§ 60.1045 - Are there different subcategories of small municipal waste combustion units within this subpart? |
Good Combustion Practices: Operator Training |
§ 60.1155 - What types of training must I do? |
§ 60.1160 - Who must complete the operator training course? By when? |
§ 60.1165 - Who must complete the plant-specific training course? |
§ 60.1170 - What plant-specific training must I provide? |
§ 60.1175 - What information must I include in the plant-specific operating manual? |
§ 60.1180 - Where must I keep the plant-specific operating manual? |
Air Curtain Incinerators That Burn 100 Percent Yard Waste |
§ 60.1435 - What is an air curtain incinerator? |
§ 60.1440 - What is yard waste? |
§ 60.1445 - What are the emission limits for air curtain incinerators that burn 100 percent yard waste? |
§ 60.1450 - How must I monitor opacity for air curtain incinerators that burn 100 percent yard waste? |
§ 60.1455 - What are the recordkeeping and reporting requirements for air curtain incinerators that burn 100 percent yard waste? |
Stack Testing |
§ 60.1285 - What types of stack tests must I conduct? |
§ 60.1290 - How are the stack test data used? |
§ 60.1295 - What schedule must I follow for the stack testing? |
§ 60.1300 - What test methods must I use to stack test? |
§ 60.1305 - May I conduct stack testing less often? |
§ 60.1310 - May I deviate from the 13-month testing schedule if unforeseen circumstances arise? |
Good Combustion Practices: Operating Requirements |
§ 60.1200 - What are the operating practice requirements for my municipal waste combustion unit? |
§ 60.1205 - What happens to the operating requirements during periods of startup, shutdown, and malfunction? |
Table 1 of Subpart AAAA - Emission Limits for New Small Municipal Waste Combustion Units |
Table 2 of Subpart AAAA - Carbon Monoxide Emission Limits for New Small Municipal Waste Combustion Units |
Table 3 of Subpart AAAA - Requirements for Validating Continuous Emission Monitoring Systems (CEMS) |
Table 4 of Subpart AAAA - Requirements for Continuous Emission Monitoring Systems (CEMS) |
Table 5 of Subpart AAAA - Requirements for Stack Tests |
Table 3 of Subpart AAAA of Part 60 - Requirements for Validating Continuous Emission Monitoring Systems (CEMS) |
Table 4 of Subpart AAAA of Part 60 - Requirements for Continuous Emission Monitoring Systems (CEMS) |
Table 5 of Subpart AAAA of Part 60 - Requirements for Stack Tests |
Table 1 to Subpart AAAA of Part 60 - Emission Limits for New Small Municipal Waste Combustion Units |
Table 2 to Subpart AAAA of Part 60 - Carbon Monoxide Emission Limits for New Small Municipal Waste Combustion Units |
Table 3 to Subpart AAAA of Part 60 - Requirements for Validating Continuous Emission Monitoring Systems (CEMS) |
Table 4 to Subpart AAAA of Part 60 - Requirements for Continuous Emission Monitoring Systems (CEMS) |
Table 5 to Subpart AAAA of Part 60 - Requirements for Stack Tests |
Table 3 of Subpart AAAA to Part 60 - Requirements for Validating Continuous Emission Monitoring Systems (CEMS) |
Table 4 of Subpart AAAA to Part 60 - Requirements for Continuous Emission Monitoring Systems (CEMS) |
Table 5 of Subpart AAAA to Part 60 - Requirements for Stack Tests |
Good Combustion Practices: Operator Certification |
§ 60.1185 - What types of operator certification must the chief facility operator and shift supervisor obtain and by when must they obtain it? |
§ 60.1190 - After the required date for operator certification, who may operate the municipal waste combustion unit? |
§ 60.1195 - What if all the certified operators must be temporarily offsite? |
Subpart B - Adoption and Submittal of State Plans for Designated Facilities |
§ 60.20 - Applicability. |
§ 60.21 - Definitions. |
§ 60.22 - Publication of guideline documents, emission guidelines, and final compliance times. |
§ 60.23 - Adoption and submittal of State plans; public hearings. |
§ 60.24 - Emission standards and compliance schedules. |
§ 60.25 - Emission inventories, source surveillance, reports. |
§ 60.26 - Legal authority. |
§ 60.27 - Actions by the Administrator. |
§ 60.28 - Plan revisions by the State. |
§ 60.29 - Plan revisions by the Administrator. |
Subpart BB - Standards of Performance for Kraft Pulp Mills |
§ 60.280 - Applicability and designation of affected facility. |
§ 60.281 - Definitions. |
§ 60.282 - Standard for particulate matter. |
§ 60.283 - Standard for total reduced sulfur (TRS). |
§ 60.284 - Monitoring of emissions and operations. |
§ 60.285 - Test methods and procedures. |
Subpart BBB - Standards of Performance for the Rubber Tire Manufacturing Industry |
§ 60.540 - Applicability and designation of affected facilities. |
§ 60.541 - Definitions. |
§ 60.542 - Standards for volatile organic compounds. |
§ 60.543 - Performance test and compliance provisions. |
§ 60.544 - Monitoring of operations. |
§ 60.545 - Recordkeeping requirements. |
§ 60.546 - Reporting requirements. |
§ 60.547 - Test methods and procedures. |
§ 60.548 - Delegation of authority. |
§ 60.542a - Alternate standard for volatile organic compounds. |
Subpart BBBB - Emission Guidelines and Compliance Times for Small Municipal Waste Combustion Units Constructed on or Before August 30, 1999 |
Model Rule—Emission Limits |
Model Rule - Other Monitoring Requirements |
§ 60.1805 - Must I meet other requirements for continuous monitoring? |
§ 60.1810 - How do I monitor the load of my municipal waste combustion unit? |
§ 60.1815 - How do I monitor the temperature of flue gases at the inlet of my particulate matter control device? |
§ 60.1820 - How do I monitor the injection rate of activated carbon? |
§ 60.1825 - What is the minimum amount of monitoring data I must collect with my continuous parameter monitoring systems and is the data collection requirement enforceable? |
Model Rule—Reporting |
Model Rule - Increments of Progress |
§ 60.1585 - What are my requirements for meeting increments of progress and achieving final compliance? |
§ 60.1590 - When must I complete each increment of progress? |
§ 60.1595 - What must I include in the notifications of achievement of my increments of progress? |
§ 60.1600 - When must I submit the notifications of achievement of increments of progress? |
§ 60.1605 - What if I do not meet an increment of progress? |
§ 60.1610 - How do I comply with the increment of progress for submittal of a control plan? |
§ 60.1615 - How do I comply with the increment of progress for awarding contracts? |
§ 60.1620 - How do I comply with the increment of progress for initiating onsite construction? |
§ 60.1625 - How do I comply with the increment of progress for completing onsite construction? |
§ 60.1630 - How do I comply with the increment of progress for achieving final compliance? |
§ 60.1635 - What must I do if I close my municipal waste combustion unit and then restart my municipal waste combustion unit? |
§ 60.1640 - What must I do if I plan to permanently close my municipal waste combustion unit and not restart it? |
Model Rule - Stack Testing |
§ 60.1775 - What types of stack tests must I conduct? |
§ 60.1780 - How are the stack test data used? |
§ 60.1785 - What schedule must I follow for the stack testing? |
§ 60.1790 - What test methods must I use to stack test? |
§ 60.1795 - May I conduct stack testing less often? |
§ 60.1800 - May I deviate from the 13-month testing schedule if unforeseen circumstances arise? |
Use of Model Rule |
§ 60.1570 - What is the “model rule” in this subpart? |
§ 60.1575 - How does the model rule relate to the required elements of my State plan? |
§ 60.1580 - What are the principal components of the model rule? |
Model Rule—Increments of Progress |
Model Rule - Good Combustion Practices: Operator Certification |
§ 60.1675 - What types of operator certification must the chief facility operator and shift supervisor obtain and by when must they obtain it? |
§ 60.1680 - After the required date for operator certification, who may operate the municipal waste combustion unit? |
§ 60.1685 - What if all the certified operators must be temporarily offsite? |
Model Rule—Recordkeeping |
Model Rule - Good Combustion Practices: Operator Training |
§ 60.1645 - What types of training must I do? |
§ 60.1650 - Who must complete the operator training course? By when? |
§ 60.1655 - Who must complete the plant-specific training course? |
§ 60.1660 - What plant-specific training must I provide? |
§ 60.1665 - What information must I include in the plant-specific operating manual? |
§ 60.1670 - Where must I keep the plant-specific operating manual? |
Equations |
§ 60.1935 - What equations must I use? |
Introduction |
§ 60.1500 - What is the purpose of this subpart? |
§ 60.1505 - Am I affected by this subpart? |
§ 60.1510 - Is a State plan required for all States? |
§ 60.1515 - What must I include in my State plan? |
§ 60.1520 - Is there an approval process for my State plan? |
§ 60.1525 - What if my State plan is not approvable? |
§ 60.1530 - Is there an approval process for a negative declaration letter? |
§ 60.1535 - What compliance schedule must I include in my State plan? |
§ 60.1540 - Are there any State plan requirements for this subpart that supersede the requirements specified in subpart B? |
§ 60.1545 - Does this subpart directly affect municipal waste combustion unit owners and operators in my State? |
Definitions |
§ 60.1940 - What definitions must I know? |
Model Rule—Good Combustion Practices: Operator Training |
Applicability of State Plans |
§ 60.1550 - What municipal waste combustion units must I address in my State plan? |
§ 60.1555 - Are any small municipal waste combustion units exempt from my State plan? |
§ 60.1560 - Can an affected municipal waste combustion unit reduce its capacity to less than 35 tons per day rather than comply with my State plan? |
§ 60.1565 - What subcategories of small municipal waste combustion units must I include in my State plan? |
Model Rule - Emission Limits |
§ 60.1700 - What pollutants are regulated by this subpart? |
§ 60.1705 - What emission limits must I meet? By when? |
§ 60.1710 - What happens to the emission limits during periods of startup, shutdown, and malfunction? |
Model Rule—Other Monitoring Requirements |
Model Rule—Good Combustion Practices: Operating Requirements |
Model Rule - Good Combustion Practices: Operating Requirements |
§ 60.1690 - What are the operating practice requirements for my municipal waste combustion unit? |
§ 60.1695 - What happens to the operating requirements during periods of startup, shutdown, and malfunction? |
Model Rule—Air Curtain Incinerators That Burn 100 Percent Yard Waste |
Model Rule—Continuous Emission Monitoring |
Model Rule - Air Curtain Incinerators That Burn 100 Percent Yard Waste |
§ 60.1910 - What is an air curtain incinerator? |
§ 60.1915 - What is yard waste? |
§ 60.1920 - What are the emission limits for air curtain incinerators that burn 100 percent yard waste? |
§ 60.1925 - How must I monitor opacity for air curtain incinerators that burn 100 percent yard waste? |
§ 60.1930 - What are the recordkeeping and reporting requirements for air curtain incinerators that burn 100 percent yard waste? |
Model Rule - Continuous Emission Monitoring |
§ 60.1715 - What types of continuous emission monitoring must I perform? |
§ 60.1720 - What continuous emission monitoring systems must I install for gaseous pollutants? |
§ 60.1725 - How are the data from the continuous emission monitoring systems used? |
§ 60.1730 - How do I make sure my continuous emission monitoring systems are operating correctly? |
§ 60.1735 - Am I exempt from any appendix B or appendix F requirements to evaluate continuous emission monitoring systems? |
§ 60.1740 - What is my schedule for evaluating continuous emission monitoring systems? |
§ 60.1745 - What must I do if I choose to monitor carbon dioxide instead of oxygen as a diluent gas? |
§ 60.1750 - What is the minimum amount of monitoring data I must collect with my continuous emission monitoring systems and is the data collection requirement enforceable? |
§ 60.1755 - How do I convert my 1-hour arithmetic averages into appropriate averaging times and units? |
§ 60.1760 - What is required for my continuous opacity monitoring system and how are the data used? |
§ 60.1765 - What additional requirements must I meet for the operation of my continuous emission monitoring systems and continuous opacity monitoring system? |
§ 60.1770 - What must I do if any of my continuous emission monitoring systems are temporarily unavailable to meet the data collection requirements? |
Model Rule—Good Combustion Practices: Operator Certification |
Model Rule - Reporting |
§ 60.1860 - What reports must I submit and in what form? |
§ 60.1865 - What are the appropriate units of measurement for reporting my data? |
§ 60.1870 - When must I submit the initial report? |
§ 60.1875 - What must I include in my initial report? |
§ 60.1880 - When must I submit the annual report? |
§ 60.1885 - What must I include in my annual report? |
§ 60.1890 - What must I do if I am out of compliance with the requirements of this subpart? |
§ 60.1895 - If a semiannual report is required, when must I submit it? |
§ 60.1900 - What must I include in the semiannual out-of-compliance reports? |
§ 60.1905 - Can reporting dates be changed? |
Model Rule—Stack Testing |
Model Rule - Recordkeeping |
§ 60.1830 - What records must I keep? |
§ 60.1835 - Where must I keep my records and for how long? |
§ 60.1840 - What records must I keep for operator training and certification? |
§ 60.1845 - What records must I keep for stack tests? |
§ 60.1850 - What records must I keep for continuously monitored pollutants or parameters? |
§ 60.1855 - What records must I keep for municipal waste combustion units that use activated carbon? |
Table 1 of Subpart BBBB - Model Rule - Compliance Schedules and Increments of Progress |
Table 2 of Subpart BBBB - Model Rule - Class I Emission Limits for Existing Small Municipal Waste Combustion Units a |
Table 3 of Subpart BBBB - Model Rule - Class I Nitrogen OxidesEmission Limits for Existing Small Municipal Waste Combustion Unitsa,b,c |
Table 4 of Subpart BBBB - Model Rule - Class II Emission Limits for Existing Small Municipal Waste Combustion Unita |
Table 5 of Subpart BBBB - Model Rule - Carbon Monoxide Emission Limits for Existing Small Municipal Waste Combustion Units |
Table 6 of Subpart BBBB - Model Rule - Requirements for Validating Continuous Emission Monitoring Systems (CEMS) |
Table 7 of Subpart BBBB - “Model Rule - Requirements for ContinuousEmission Monitoring Systems (CEMS) |
Table 8 of Subpart BBBB - Model Rule - Requirements for Stack Tests |
Table 1 to Subpart BBBB of Part 60 - Model Rule - Compliance Schedules and Increments of Progress |
Table 2 to Subpart BBBB of Part 60 - Model Rule—Class I Emission Limits for Existing Small Municipal Waste Combustion Units a |
Table 3 to Subpart BBBB of Part 60 - Model Rule—Class I Nitrogen Oxides Emission Limits for Existing Small Municipal Waste Combustion Units a b c |
Table 4 to Subpart BBBB of Part 60 - Model Rule—Class II Emission Limits for Existing Small Municipal Waste Combustion Unit a |
Table 5 to Subpart BBBB of Part 60 - Model Rule - Carbon Monoxide Emission Limits for Existing Small Municipal Waste Combustion Units |
Table 6 to Subpart BBBB of Part 60 - Model Rule - Requirements for Validating Continuous Emission Monitoring Systems (CEMS) |
Table 7 to Subpart BBBB of Part 60 - Model Rule - Requirements for Continuous Emission Monitoring Systems (CEMS) |
Table 8 to Subpart BBBB of Part 60 - Model Rule - Requirements for Stack Tests |
Subpart C - Emission Guidelines and Compliance Times |
§ 60.30 - Scope. |
§ 60.31 - Definitions. |
Subpart CCC - XXX |
Subpart CCCC - Standards of Performance for Commercial and Industrial Solid Waste Incineration Units |
Operator Training and Qualification |
§ 60.2070 - What are the operator training and qualification requirements? |
§ 60.2075 - When must the operator training course be completed? |
§ 60.2080 - How do I obtain my operator qualification? |
§ 60.2085 - How do I maintain my operator qualification? |
§ 60.2090 - How do I renew my lapsed operator qualification? |
§ 60.2095 - What site-specific documentation is required? |
§ 60.2100 - What if all the qualified operators are temporarily not accessible? |
Recordkeeping and Reporting |
§ 60.2175 - What records must I keep? |
§ 60.2180 - Where and in what format must I keep my records? |
§ 60.2185 - What reports must I submit? |
§ 60.2190 - What must I submit prior to commencing construction? |
§ 60.2195 - What information must I submit prior to initial startup? |
§ 60.2200 - What information must I submit following my initial performance test? |
§ 60.2205 - When must I submit my annual report? |
§ 60.2210 - What information must I include in my annual report? |
§ 60.2215 - What else must I report if I have a deviation from the operating limits or the emission limitations? |
§ 60.2220 - What must I include in the deviation report? |
§ 60.2225 - What else must I report if I have a deviation from the requirement to have a qualified operator accessible? |
§ 60.2230 - Are there any other notifications or reports that I must submit? |
§ 60.2235 - In what form can I submit my reports? |
§ 60.2240 - Can reporting dates be changed? |
Continuous Compliance Requirements |
§ 60.2145 - How do I demonstrate continuous compliance with the emission limitations and the operating limits? |
§ 60.2150 - By what date must I conduct the annual performance test? |
§ 60.2151 - By what date must I conduct the annual air pollution control device inspection? |
§ 60.2155 - May I conduct performance testing less often? |
§ 60.2160 - May I conduct a repeat performance test to establish new operating limits? |
Air Curtain Incinerators (Acis) |
§ 60.2245 - What is an air curtain incinerator? |
§ 60.2250 - What are the emission limitations for air curtain incinerators? |
§ 60.2255 - How must I monitor opacity for air curtain incinerators? |
§ 60.2260 - What are the recordkeeping and reporting requirements for air curtain incinerators? |
Applicability |
§ 60.2010 - Does this subpart apply to my incineration unit? |
§ 60.2015 - What is a new incineration unit? |
§ 60.2020 - What combustion units are exempt from this subpart? |
§ 60.2025 - What if my chemical recovery unit is not listed in 60.2020(n)? |
§ 60.2030 - Who implements and enforces this subpart? |
§ 60.2035 - How are these new source performance standards structured? |
§ 60.2040 - Do all eleven components of these new source performance standards apply at the same time? |
Introduction |
§ 60.2000 - What does this subpart do? |
§ 60.2005 - When did this subpart become effective? |
Air Curtain Incinerators |
Definitions |
§ 60.2265 - What definitions must I know? |
Monitoring |
§ 60.2165 - What monitoring equipment must I install and what parameters must I monitor? |
§ 60.2170 - Is there a minimum amount of monitoring data I must obtain? |
Waste Management Plan |
§ 60.2055 - What is a waste management plan? |
§ 60.2060 - When must I submit my waste management plan? |
§ 60.2065 - What should I include in my waste management plan? |
Performance Testing |
§ 60.2125 - How do I conduct the initial and annual performance test? |
§ 60.2130 - How are the performance test data used? |
Emission Limitations and Operating Limits |
§ 60.2105 - What emission limitations must I meet and by when? |
§ 60.2110 - What operating limits must I meet and by when? |
§ 60.2120 - Affirmative defense for violation of emission standards during malfunction. |
Preconstruction Siting Analysis |
§ 60.2045 - Who must prepare a siting analysis? |
§ 60.2050 - What is a siting analysis? |
Initial Compliance Requirements |
§ 60.2135 - How do I demonstrate initial compliance with the emission limitations and establish the operating limits? |
§ 60.2140 - By what date must I conduct the initial performance test? |
§ 60.2141 - By what date must I conduct the initial air pollution control device inspection? |
Title V Operating Permits |
§ 60.2242 - Am I required to apply for and obtain a Title V operating permit for my unit? |
Table 2 to Subpart CCCC - Operating Limits for Wet Scrubbers |
Table 3 to Subpart CCCC - Toxic Equivalency Factors |
Table 2 to Subpart CCCC of Part 60 - Operating Limits for Wet Scrubbers |
Table 3 to Subpart CCCC of Part 60 - Toxic Equivalency Factors |
Table 4 to Subpart CCCC of Part 60 - Summary of Reporting Requirements |
Table 5 to Subpart CCCC of Part 60 - Emission Limitations for Incinerators That Commenced Construction After June 4, 2010, or That Commenced Reconstruction or Modification After August 7, 2013 |
Table 7 to Subpart CCCC of Part 60 - Emission Limitations for Waste-Burning Kilns That Commenced Construction After June 4, 2010, or Reconstruction or Modification After August 7, 2013 |
Subpart D - Standards of Performance for Fossil-Fuel-Fired Steam Generators |
§ 60.40 - Applicability and designation of affected facility. |
§ 60.41 - Definitions. |
§ 60.42 - Standard for particulate matter (PM). |
§ 60.43 - Standard for sulfur dioxide (SO2). |
§ 60.44 - Standard for nitrogen oxides (NOX). |
§ 60.45 - Emissions and fuel monitoring. |
§ 60.46 - Test methods and procedures. |
Subpart DD - Standards of Performance for Grain Elevators |
§ 60.300 - Applicability and designation of affected facility. |
§ 60.301 - Definitions. |
§ 60.302 - Standard for particulate matter. |
§ 60.303 - Test methods and procedures. |
§ 60.304 - Modifications. |
Subpart DDD - Standards of Performance for Volatile Organic Compound (VOC) Emissions from the Polymer Manufacturing Industry |
§ 60.560 - Applicability and designation of affected facilities. |
§ 60.561 - Definitions. |
§ 60.563 - Monitoring requirements. |
§ 60.564 - Test methods and procedures. |
§ 60.565 - Reporting and recordkeeping requirements. |
§ 60.566 - Delegation of authority. |
§ 60.562-1 - Standards: Process emissions. |
§ 60.562-2 - Standards: Equipment leaks of VOC. |
Subpart DDDD - Emissions Guidelines and Compliance Times for Commercial and Industrial Solid Waste Incineration Units |
Model Rule—Waste Management Plan |
Model Rule—Continuous Compliance Requirements |
Model Rule—Increments of Progress |
Model Rule - Air Curtain Incinerators |
Model Rule—Definitions |
Model Rule—Air Curtain Incinerators |
Use of Model Rule |
§ 60.2560 - What is the “model rule” in this subpart? |
§ 60.2565 - How does the model rule relate to the required elements of my state plan? |
§ 60.2570 - What are the principal components of the model rule? |
Model Rule—Initial Compliance Requirements |
Applicability of State Plans |
§ 60.2550 - What CISWIs must I address in my state plan? |
§ 60.2555 - What combustion units are exempt from my state plan? |
§ 60.2558 - What if a chemical recovery unit is not listed in 60.2555(n)? |
Model Rule - Title V Operating Permits |
§ 60.2805 - Am I required to apply for and obtain a Title V operating permit for my unit? |
Model Rule—Operator Training and Qualification |
Model Rule - Continuous Compliance Requirements |
§ 60.2710 - How do I demonstrate continuous compliance with the amended emission limitations and the operating limits? |
§ 60.2715 - By what date must I conduct the annual performance test? |
§ 60.2716 - By what date must I conduct the annual air pollution control device inspection? |
§ 60.2720 - May I conduct performance testing less often? |
§ 60.2725 - May I conduct a repeat performance test to establish new operating limits? |
Model Rule - Waste Management Plan |
§ 60.2620 - What is a waste management plan? |
§ 60.2625 - When must I submit my waste management plan? |
§ 60.2630 - What should I include in my waste management plan? |
Model Rule - Emission Limitations and Operating Limits |
§ 60.2670 - What emission limitations must I meet and by when? |
§ 60.2675 - What operating limits must I meet and by when? |
Model Rule - Definitions |
§ 60.2875 - What definitions must I know? |
Model Rule - Operator Training and Qualification |
§ 60.2635 - What are the operator training and qualification requirements? |
§ 60.2640 - When must the operator training course be completed? |
§ 60.2645 - How do I obtain my operator qualification? |
§ 60.2650 - How do I maintain my operator qualification? |
§ 60.2655 - How do I renew my lapsed operator qualification? |
§ 60.2660 - What site-specific documentation is required? |
§ 60.2665 - What if all the qualified operators are temporarily not accessible? |
Model Rule - Initial Compliance Requirements |
§ 60.2700 - How do I demonstrate initial compliance with the amended emission limitations and establish the operating limits? |
§ 60.2705 - By what date must I conduct the initial performance test? |
§ 60.2706 - By what date must I conduct the initial air pollution control device inspection? |
Model Rule - Increments of Progress |
§ 60.2575 - What are my requirements for meeting increments of progress and achieving final compliance? |
§ 60.2580 - When must I complete each increment of progress? |
§ 60.2585 - What must I include in the notifications of achievement of increments of progress? |
§ 60.2590 - When must I submit the notifications of achievement of increments of progress? |
§ 60.2595 - What if I do not meet an increment of progress? |
§ 60.2600 - How do I comply with the increment of progress for submittal of a control plan? |
§ 60.2605 - How do I comply with the increment of progress for achieving final compliance? |
§ 60.2610 - What must I do if I close my CISWI and then restart it? |
§ 60.2615 - What must I do if I plan to permanently close my CISWI and not restart it? |
Model Rule - Recordkeeping and Reporting |
§ 60.2740 - What records must I keep? |
§ 60.2745 - Where and in what format must I keep my records? |
§ 60.2750 - What reports must I submit? |
§ 60.2755 - When must I submit my waste management plan? |
§ 60.2760 - What information must I submit following my initial performance test? |
§ 60.2765 - When must I submit my annual report? |
§ 60.2770 - What information must I include in my annual report? |
§ 60.2775 - What else must I report if I have a deviation from the operating limits or the emission limitations? |
§ 60.2780 - What must I include in the deviation report? |
§ 60.2785 - What else must I report if I have a deviation from the requirement to have a qualified operator accessible? |
§ 60.2790 - Are there any other notifications or reports that I must submit? |
§ 60.2795 - In what form can I submit my reports? |
§ 60.2800 - Can reporting dates be changed? |
Model Rule—Recordkeeping and Reporting |
Model Rule - Air Curtain Incinerators (Acis) |
§ 60.2810 - What is an air curtain incinerator? |
§ 60.2815 - What are my requirements for meeting increments of progress and achieving final compliance? |
§ 60.2820 - When must I complete each increment of progress? |
§ 60.2825 - What must I include in the notifications of achievement of increments of progress? |
§ 60.2830 - When must I submit the notifications of achievement of increments of progress? |
§ 60.2835 - What if I do not meet an increment of progress? |
§ 60.2840 - How do I comply with the increment of progress for submittal of a control plan? |
§ 60.2845 - How do I comply with the increment of progress for achieving final compliance? |
§ 60.2850 - What must I do if I close my air curtain incinerator and then restart it? |
§ 60.2855 - What must I do if I plan to permanently close my air curtain incinerator and not restart it? |
§ 60.2860 - What are the emission limitations for air curtain incinerators? |
§ 60.2865 - How must I monitor opacity for air curtain incinerators? |
§ 60.2870 - What are the recordkeeping and reporting requirements for air curtain incinerators? |
Model Rule—Monitoring |
Introduction |
§ 60.2500 - What is the purpose of this subpart? |
§ 60.2505 - Am I affected by this subpart? |
§ 60.2510 - Is a state plan required for all states? |
§ 60.2515 - What must I include in my state plan? |
§ 60.2520 - Is there an approval process for my state plan? |
§ 60.2525 - What if my state plan is not approvable? |
§ 60.2530 - Is there an approval process for a negative declaration letter? |
§ 60.2535 - What compliance schedule must I include in my state plan? |
§ 60.2540 - Are there any State plan requirements for this subpart that apply instead of the requirements specified in subpart B? |
§ 60.2541 - In lieu of a state plan submittal, are there other acceptable option(s) for a state to meet its Clean Air Act section 111(d)/129(b)(2) obligations? |
§ 60.2542 - What authorities will not be delegated to state, local, or tribal agencies? |
§ 60.2545 - Does this subpart directly affect CISWI owners and operators in my state? |
Model Rule - Monitoring |
§ 60.2730 - What monitoring equipment must I install and what parameters must I monitor? |
§ 60.2735 - Is there a minimum amount of monitoring data I must obtain? |
Model Rule—Title V Operating Permits |
Model Rule—Performance Testing |
Model Rule - Performance Testing |
§ 60.2690 - How do I conduct the initial and annual performance test? |
§ 60.2695 - How are the performance test data used? |
Model Rule—Emission Limitations and Operating Limits |
§ 60.2685 - Affirmative defense for violation of emission standards during malfunction. |
Model Rule—Air Curtain Incinerators (ACIs) |
Table 1 to Subpart DDDD - Model Rule - Increments of Progress and Compliance Schedules |
Table 2 to Subpart DDDD - Model Rule - Emission Limitations |
Table 3 to Subpart DDDD - Model Rule - Operating Limits for Wet Scrubbers |
Table 4 to Subpart DDDD - Model Rule - Toxic Equivalency Factors |
Table 5 to Subpart DDDD - Model Rule - Summary of Reporting Requirementsa |
Table 1 to Subpart DDDD of Part 60 - Model Rule - Increments of Progress and Compliance Schedules |
Table 2 to Subpart DDDD of Part 60 - Model Rule - Emission Limitations That Apply to Incinerators Before [Date To Be Specified in State Plan] |
Table 3 to Subpart DDDD of Part 60 - Model Rule - Operating Limits for Wet Scrubbers |
Table 4 to Subpart DDDD of Part 60 - Model Rule - Toxic Equivalency Factors |
Table 5 to Subpart DDDD of Part 60 - Model Rule - Summary of Reporting Requirements |
Table 6 to Subpart DDDD of Part 60 - Model Rule - Emission Limitations That Apply to Incinerators on and After [Date To Be Specified in State Plan] 1 |
Table 7 to Subpart DDDD of Part 60 - Model Rule - Emission Limitations That Apply to Energy Recovery Units After May 20, 2011 |
Table 8 to Subpart DDDD of Part 60 - Model Rule - Emission Limitations That Apply to Waste-Burning Kilns After May 20, 2011 |
Table 9 to Subpart DDDD of Part 60 - Model Rule - Emission Limitations That Apply to Small, Remote Incinerators After May 20, 2011 [Date To Be Specified in State Plan] 1 |
Subpart E - Standards of Performance for Incinerators |
§ 60.50 - Applicability and designation of affected facility. |
§ 60.51 - Definitions. |
§ 60.52 - Standard for particulate matter. |
§ 60.53 - Monitoring of operations. |
§ 60.54 - Test methods and procedures. |
Subpart EE - Standards of Performance for Surface Coating of Metal Furniture |
§ 60.310 - Applicability and designation of affected facility. |
§ 60.311 - Definitions and symbols. |
§ 60.312 - Standard for volatile organic compounds (VOC). |
§ 60.313 - Performance tests and compliance provisions. |
§ 60.314 - Monitoring of emissions and operations. |
§ 60.315 - Reporting and recordkeeping requirements. |
§ 60.316 - Test methods and procedures. |
Subpart EEE - XXX |
Continuous Compliance Requirements |
§ 60.2932 - How do I demonstrate continuous compliance with the emission limitations and the operating limits? |
§ 60.2933 - By what date must I conduct the annual performance test? |
§ 60.2934 - May I conduct performance testing less often? |
§ 60.2935 - May I conduct a repeat performance test to establish new operating limits? |
Equations |
§ 60.2975 - What equations must I use? |
Initial Compliance Requirements |
§ 60.2927 - How do I demonstrate initial compliance with the emission limitations and establish the operating limits? |
§ 60.2928 - By what date must I conduct the initial performance test? |
Emission Limitations and Operating Limits |
§ 60.2915 - What emission limitations must I meet and by when? |
§ 60.2916 - What operating limits must I meet and by when? |
§ 60.2917 - What if I do not use a wet scrubber to comply with the emission limitations? |
§ 60.2918 - What happens during periods of startup, shutdown, and malfunction? |
Title V Operating Permits |
§ 60.2966 - Am I required to apply for and obtain a title V operating permit for my unit? |
§ 60.2967 - When must I submit a title V permit application for my new unit? |
Definitions |
§ 60.2977 - What definitions must I know? |
Recordkeeping and Reporting |
§ 60.2949 - What records must I keep? |
§ 60.2950 - Where and in what format must I keep my records? |
§ 60.2951 - What reports must I submit? |
§ 60.2952 - What must I submit prior to commencing construction? |
§ 60.2953 - What information must I submit prior to initial startup? |
§ 60.2954 - What information must I submit following my initial performance test? |
§ 60.2955 - When must I submit my annual report? |
§ 60.2956 - What information must I include in my annual report? |
§ 60.2957 - What else must I report if I have a deviation from the operating limits or the emission limitations? |
§ 60.2958 - What must I include in the deviation report? |
§ 60.2959 - What else must I report if I have a deviation from the requirement to have a qualified operator accessible? |
§ 60.2960 - Are there any other notifications or reports that I must submit? |
§ 60.2961 - In what form can I submit my reports? |
§ 60.2962 - Can reporting dates be changed? |
Performance Testing |
§ 60.2922 - How do I conduct the initial and annual performance test? |
§ 60.2923 - How are the performance test data used? |
Waste Management Plan |
§ 60.2899 - What is a waste management plan? |
§ 60.2900 - When must I submit my waste management plan? |
§ 60.2901 - What should I include in my waste management plan? |
Air Curtain Incinerators That Burn Only Wood Waste, Clean Lumber, and Yard Waste |
§ 60.2970 - What is an air curtain incinerator? |
§ 60.2971 - What are the emission limitations for air curtain incinerators that burn only wood waste, clean lumber, and yard waste? |
§ 60.2972 - How must I monitor opacity for air curtain incinerators that burn only wood waste, clean lumber, and yard waste? |
§ 60.2973 - What are the recordkeeping and reporting requirements for air curtain incinerators that burn only wood waste, clean lumber, and yard waste? |
§ 60.2974 - [Reserved] |
Preconstruction Siting Analysis |
§ 60.2894 - Who must prepare a siting analysis? |
§ 60.2895 - What is a siting analysis? |
Operator Training and Qualification |
§ 60.2905 - What are the operator training and qualification requirements? |
§ 60.2906 - When must the operator training course be completed? |
§ 60.2907 - How do I obtain my operator qualification? |
§ 60.2908 - How do I maintain my operator qualification? |
§ 60.2909 - How do I renew my lapsed operator qualification? |
§ 60.2910 - What site-specific documentation is required? |
§ 60.2911 - What if all the qualified operators are temporarily not accessible? |
Temporary-Use Incinerators and Air Curtain Incinerators Used in Disaster Recovery |
§ 60.2969 - [Reserved] |
Monitoring |
§ 60.2939 - What continuous emission monitoring systems must I install? |
§ 60.2940 - How do I make sure my continuous emission monitoring systems are operating correctly? |
§ 60.2941 - What is my schedule for evaluating continuous emission monitoring systems? |
§ 60.2942 - What is the minimum amount of monitoring data I must collect with my continuous emission monitoring systems, and is the data collection requirement enforceable? |
§ 60.2943 - How do I convert my 1-hour arithmetic averages into the appropriate averaging times and units? |
§ 60.2944 - What operating parameter monitoring equipment must I install, and what operating parameters must I monitor? |
§ 60.2945 - Is there a minimum amount of operating parameter monitoring data I must obtain? |
Applicability |
§ 60.2885 - Does this subpart apply to my incineration unit? |
§ 60.2886 - What is a new incineration unit? |
§ 60.2887 - What combustion units are excluded from this subpart? |
§ 60.2888 - Are air curtain incinerators regulated under this subpart? |
§ 60.2889 - Who implements and enforces this subpart? |
§ 60.2890 - How are these new source performance standards structured? |
§ 60.2891 - Do all components of these new source performance standards apply at the same time? |
Introduction |
§ 60.2880 - What does this subpart do? |
§ 60.2881 - When does this subpart become effective? |
Table 1 to Subpart EEEE of Part 60 - Emission Limitations |
Table 2 to Subpart EEEE of Part 60 - Operating Limits for Incinerators and Wet Scrubbers |
Table 3 to Subpart EEEE of Part 60 - Requirements for Continuous Emission Monitoring Systems (CEMS) |
Table 4 to Subpart EEEE of Part 60 - Summary of Reporting Requirements |
Subpart F - Standards of Performance for Portland Cement Plants |
§ 60.60 - Applicability and designation of affected facility. |
§ 60.61 - Definitions. |
§ 60.62 - Standards. |
§ 60.63 - Monitoring of operations. |
§ 60.64 - Test methods and procedures. |
§ 60.65 - Recordkeeping and reporting requirements. |
§ 60.66 - Delegation of authority. |
Subpart FF - XXX |
Subpart FFF - Standards of Performance for Flexible Vinyl and Urethane Coating and Printing |
§ 60.580 - Applicability and designation of affected facility. |
§ 60.581 - Definitions and symbols. |
§ 60.582 - Standard for volatile organic compounds. |
§ 60.583 - Test methods and procedures. |
§ 60.584 - Monitoring of operations and recordkeeping requirements. |
§ 60.585 - Reporting requirements. |
Subpart FFFF - Emission Guidelines and Compliance Times for Other Solid Waste |
Model Rule—Initial Compliance Requirements |
Introduction |
§ 60.2980 - What is the purpose of this subpart? |
§ 60.2981 - Am I affected by this subpart? |
§ 60.2982 - Is a State plan required for all States? |
§ 60.2983 - What must I include in my State plan? |
§ 60.2984 - Is there an approval process for my State plan? |
§ 60.2985 - What if my State plan is not approvable? |
§ 60.2986 - Is there an approval process for a negative declaration letter? |
§ 60.2987 - What compliance schedule must I include in my State plan? |
§ 60.2988 - Are there any State plan requirements for this subpart that apply instead of the requirements specified in subpart B of this part? |
§ 60.2989 - Does this subpart directly affect incineration unit owners and operators in my State? |
§ 60.2990 - What Authorities are withheld by EPA? |
Model Rule - Operator Training and Qualification |
§ 60.3014 - What are the operator training and qualification requirements? |
§ 60.3015 - When must the operator training course be completed? |
§ 60.3016 - How do I obtain my operator qualification? |
§ 60.3017 - How do I maintain my operator qualification? |
§ 60.3018 - How do I renew my lapsed operator qualification? |
§ 60.3019 - What site-specific documentation is required? |
§ 60.3020 - What if all the qualified operators are temporarily not accessible? |
Model Rule - Temporary-Use Incinerators and Air Curtain Incinerators Used in Disaster Recovery |
§ 60.3061 - What are the requirements for temporary-use incinerators and air curtain incinerators used in disaster recovery? |
Model Rule—Recordkeeping and Reporting |
Model Rule - Initial Compliance Requirements |
§ 60.3030 - How do I demonstrate initial compliance with the emission limitations and establish the operating limits? |
§ 60.3031 - By what date must I conduct the initial performance test? |
Model Rule - Definitions |
§ 60.3078 - What definitions must I know? |
Model Rule - Use of Model Rule |
§ 60.2996 - What is the purpose of the “model rule” in this subpart? |
§ 60.2997 - How does the model rule relate to the required elements of my State plan? |
§ 60.2998 - What are the principal components of the model rule? |
Model Rule—Air Curtain Incinerators That Burn Only Wood Waste, Clean Lumber, and Yard Waste |
Model Rule—Use of Model Rule |
Model Rule—Monitoring |
Model Rule - Waste Management Plan |
§ 60.3010 - What is a waste management plan? |
§ 60.3011 - When must I submit my waste management plan? |
§ 60.3012 - What should I include in my waste management plan? |
Model Rule - Equations |
§ 60.3076 - What equations must I use? |
Model Rule - Compliance Schedule |
§ 60.3000 - When must I comply? |
§ 60.3001 - What must I do if I close my OSWI unit and then restart it? |
§ 60.3002 - What must I do if I plan to permanently close my OSWI unit and not restart it? |
Model Rule - Emission Limitations and Operating Limits |
§ 60.3022 - What emission limitations must I meet and by when? |
§ 60.3023 - What operating limits must I meet and by when? |
§ 60.3024 - What if I do not use a wet scrubber to comply with the emission limitations? |
§ 60.3025 - What happens during periods of startup, shutdown, and malfunction? |
Model Rule—Definitions |
Model Rule—Compliance Schedule |
Model Rule—Equations |
Model Rule—Temporary-Use Incinerators and Air Curtain Incinerators Used in Disaster Recovery |
Model Rule - Air Curtain Incinerators That Burn Only Wood Waste, Clean Lumber, and Yard Waste |
§ 60.3062 - What is an air curtain incinerator? |
§ 60.3063 - When must I comply if my air curtain incinerator burns only wood waste, clean lumber, and yard waste? |
§ 60.3064 - What must I do if I close my air curtain incinerator that burns only wood waste, clean lumber, and yard waste and then restart it? |
§ 60.3065 - What must I do if I plan to permanently close my air curtain incinerator that burns only wood waste, clean lumber, and yard waste and not restart it? |
§ 60.3066 - What are the emission limitations for air curtain incinerators that burn only wood waste, clean lumber, and yard waste? |
§ 60.3067 - How must I monitor opacity for air curtain incinerators that burn only wood waste, clean lumber, and yard waste? |
§ 60.3068 - What are the recordkeeping and reporting requirements for air curtain incinerators that burn only wood waste, clean lumber, and yard waste? |
§ 60.3069 - Am I required to apply for and obtain a title V operating permit for my air curtain incinerator that burns only wood waste, clean lumber, and yard waste? |
Model Rule - Continuous Compliance Requirements |
§ 60.3033 - How do I demonstrate continuous compliance with the emission limitations and the operating limits? |
§ 60.3034 - By what date must I conduct the annual performance test? |
§ 60.3035 - May I conduct performance testing less often? |
§ 60.3036 - May I conduct a repeat performance test to establish new operating limits? |
Applicability of State Plans |
§ 60.2991 - What incineration units must I address in my State plan? |
§ 60.2992 - What is an existing incineration unit? |
§ 60.2993 - Are any combustion units excluded from my State plan? |
§ 60.2994 - Are air curtain incinerators regulated under this subpart? |
Model Rule—Performance Testing |
Model Rule—Title V Operating Permits |
§ 60.3059 - Am I required to apply for and obtain a title V operating permit for my unit? |
§ 60.3060 - [Reserved] |
Model Rule—Waste Management Plan |
Model Rule - Recordkeeping and Reporting |
§ 60.3046 - What records must I keep? |
§ 60.3047 - Where and in what format must I keep my records? |
§ 60.3048 - What reports must I submit? |
§ 60.3049 - What information must I submit following my initial performance test? |
§ 60.3050 - When must I submit my annual report? |
§ 60.3051 - What information must I include in my annual report? |
§ 60.3052 - What else must I report if I have a deviation from the operating limits or the emission limitations? |
§ 60.3053 - What must I include in the deviation report? |
§ 60.3054 - What else must I report if I have a deviation from the requirement to have a qualified operator accessible? |
§ 60.3055 - Are there any other notifications or reports that I must submit? |
§ 60.3056 - In what form can I submit my reports? |
§ 60.3057 - Can reporting dates be changed? |
Model Rule - Monitoring |
§ 60.3038 - What continuous emission monitoring systems must I install? |
§ 60.3039 - How do I make sure my continuous emission monitoring systems are operating correctly? |
§ 60.3040 - What is my schedule for evaluating continuous emission monitoring systems? |
§ 60.3041 - What is the minimum amount of monitoring data I must collect with my continuous emission monitoring systems, and is the data collection requirement enforceable? |
§ 60.3042 - How do I convert my 1-hour arithmetic averages into the appropriate averaging times and units? |
§ 60.3043 - What operating parameter monitoring equipment must I install, and what operating parameters must I monitor? |
§ 60.3044 - Is there a minimum amount of operating parameter monitoring data I must obtain? |
Model Rule - Title V Operating Permits |
Model Rule—Emission Limitations and Operating Limits |
Model Rule - Performance Testing |
§ 60.3027 - How do I conduct the initial and annual performance test? |
§ 60.3028 - How are the performance test data used? |
Model Rule—Operator Training and Qualification |
Table 1 to Subpart FFFF of Part 60 - Model Rule - Compliance Schedule |
Table 2 to Subpart FFFF of Part 60 - Model Rule - Emission Limitations |
Table 3 to Subpart FFFF of Part 60 - Model Rule - Operating Limits for Incinerators and Wet Scrubbers |
Table 4 to Subpart FFFF of Part 60 - Model Rule - Requirements for Continuous Emission Monitoring Systems (CEMS) |
Table 5 to Subpart FFFF of Part 60 - Model Rule - Summary of Reporting Requirements |
Tables to Subpart FFFF of Part 60 |
Table 5 to Subpart FFFF of the Part 60 - Model Rule - Summary of Reporting Requirements |
Model Rule—Continuous Compliance Requirements |
Subpart G - Standards of Performance for Nitric Acid Plants |
§ 60.70 - Applicability and designation of affected facility. |
§ 60.71 - Definitions. |
§ 60.72 - Standard for nitrogen oxides. |
§ 60.73 - Emission monitoring. |
§ 60.74 - Test methods and procedures. |
Subpart GG - Standards of Performance for Stationary Gas Turbines |
§ 60.330 - Applicability and designation of affected facility. |
§ 60.331 - Definitions. |
§ 60.332 - Standard for nitrogen oxides. |
§ 60.333 - Standard for sulfur dioxide. |
§ 60.334 - Monitoring of operations. |
§ 60.335 - Test methods and procedures. |
§ 60.590 - Applicability and designation of affected facility. |
§ 60.591 - Definitions. |
§ 60.592 - Standards. |
§ 60.593 - Exceptions. |
Subparts GGGG--HHHH - XXX |
Subpart H - Standards of Performance for Sulfuric Acid Plants |
§ 60.80 - Applicability and designation of affected facility. |
§ 60.81 - Definitions. |
§ 60.82 - Standard for sulfur dioxide. |
§ 60.83 - Standard for acid mist. |
§ 60.84 - Emission monitoring. |
§ 60.85 - Test methods and procedures. |
Subpart HH - Standards of Performance for Lime Manufacturing Plants |
§ 60.340 - Applicability and designation of affected facility. |
§ 60.341 - Definitions. |
§ 60.342 - Standard for particulate matter. |
§ 60.343 - Monitoring of emissions and operations. |
§ 60.344 - Test methods and procedures. |
Subpart HHH - Standards of Performance for Synthetic Fiber Production Facilities |
§ 60.600 - Applicability and designation of affected facility. |
§ 60.601 - Definitions. |
§ 60.602 - Standard for volatile organic compounds. |
§ 60.603 - Performance test and compliance provisions. |
§ 60.604 - Reporting requirements. |
Subpart HHHH - Emission Guidelines and Compliance Times for Coal-Fired Electric Steam Generating Units |
Hg Allowance Tracking System |
§ 60.4150 - [Reserved] |
§ 60.4151 - Establishment of accounts. |
§ 60.4152 - Responsibilities of Hg authorized account representative. |
§ 60.4153 - Recordation of Hg allowance allocations. |
§ 60.4154 - Compliance with Hg budget emissions limitation. |
§ 60.4155 - Banking. |
§ 60.4156 - Account error. |
§ 60.4157 - Closing of general accounts. |
Monitoring and Reporting |
§ 60.4170 - General requirements. |
§ 60.4171 - Initial certification and recertification procedures. |
§ 60.4172 - Out of control periods. |
§ 60.4173 - Notifications. |
§ 60.4174 - Recordkeeping and reporting. |
§ 60.4175 - Petitions. |
§ 60.4176 - Additional requirements to provide heat input data. |
Hg Allowance Transfers |
§ 60.4160 - Submission of Hg allowance transfers. |
§ 60.4161 - EPA recordation. |
§ 60.4162 - Notification. |
Hg Designated Representative for Hg Budget Sources |
§ 60.4110 - Authorization and Responsibilities of Hg designated representative. |
§ 60.4111 - Alternate Hg designated representative. |
§ 60.4112 - Changing Hg designated representative and alternate Hg designated representative; changes in owners and operators. |
§ 60.4113 - Certificate of representation. |
§ 60.4114 - Objections concerning Hg designated representative. |
Permits |
§ 60.4120 - General Hg budget trading program permit requirements. |
§ 60.4121 - Submission of Hg budget permit applications. |
§ 60.4122 - Information requirements for Hg budget permit applications. |
§ 60.4123 - Hg budget permit contents and term. |
§ 60.4124 - Hg budget permit revisions. |
§ 60.4130 - [Reserved] |
Hg Budget Trading Program General Provisions |
§ 60.4101 - Purpose. |
§ 60.4102 - Definitions. |
§ 60.4103 - Measurements, abbreviations, and acronyms. |
§ 60.4104 - Applicability. |
§ 60.4105 - Retired unit exemption. |
§ 60.4106 - Standard requirements. |
§ 60.4107 - Computation of time. |
§ 60.4108 - Appeal procedures. |
Hg Allowance Allocations |
§ 60.4140 - State trading budgets. |
§ 60.4141 - Timing requirements for Hg allowance allocations. |
§ 60.4142 - Hg allowance allocations. |
Subpart I - Standards of Performance for Hot Mix Asphalt Facilities |
§ 60.90 - Applicability and designation of affected facility. |
§ 60.91 - Definitions. |
§ 60.92 - Standard for particulate matter. |
§ 60.93 - Test methods and procedures. |
§ 60.610 - Applicability and designation of affected facility. |
§ 60.611 - Definitions. |
§ 60.612 - Standards. |
§ 60.613 - Monitoring of emissions and operations. |
§ 60.614 - Test methods and procedures. |
§ 60.615 - Reporting and recordkeeping requirements. |
§ 60.616 - Reconstruction. |
§ 60.617 - Chemicals affected by subpart III. |
§ 60.618 - Delegation of authority. |
Subpart IIII - Standards of Performance for Stationary Compression Ignition Internal Combustion Engines |
Special Requirements |
§ 60.4215 - What requirements must I meet for engines used in Guam, American Samoa, or the Commonwealth of the Northern Mariana Islands? |
§ 60.4216 - What requirements must I meet for engines used in Alaska? |
§ 60.4217 - What emission standards must I meet if I am an owner or operator of a stationary internal combustion engine using special fuels? |
Emission Standards for Owners and Operators |
§ 60.4204 - What emission standards must I meet for non-emergency engines if I am an owner or operator of a stationary CI internal combustion engine? |
§ 60.4205 - What emission standards must I meet for emergency engines if I am an owner or operator of a stationary CI internal combustion engine? |
§ 60.4206 - How long must I meet the emission standards if I am an owner or operator of a stationary CI internal combustion engine? |
Testing Requirements for Owners and Operators |
§ 60.4212 - What test methods and other procedures must I use if I am an owner or operator of a stationary CI internal combustion engine with a displacement of less than 30 liters per cylinder? |
Other Requirements for Owners and Operators |
§ 60.4208 - What is the deadline for importing or installing stationary CI ICE produced in previous model years? |
§ 60.4209 - What are the monitoring requirements if I am an owner or operator of a stationary CI internal combustion engine? |
Compliance Requirements |
§ 60.4210 - What are my compliance requirements if I am a stationary CI internal combustion engine manufacturer? |
§ 60.4211 - What are my compliance requirements if I am an owner or operator of a stationary CI internal combustion engine? |
Definitions |
§ 60.4219 - What definitions apply to this subpart? |
Emission Standards for Manufacturers |
§ 60.4201 - What emission standards must I meet for non-emergency engines if I am a stationary CI internal combustion engine manufacturer? |
§ 60.4202 - What emission standards must I meet for emergency engines if I am a stationary CI internal combustion engine manufacturer? |
§ 60.4203 - How long must my engines meet the emission standards if I am a manufacturer of stationary CI internal combustion engines? |
Notification, Reports, and Records for Owners and Operators |
§ 60.4214 - What are my notification, reporting, and recordkeeping requirements if I am an owner or operator of a stationary CI internal combustion engine? |
Fuel Requirements for Owners and Operators |
§ 60.4207 - What fuel requirements must I meet if I am an owner or operator of a stationary CI internal combustion engine subject to this subpart? |
General Provisions |
§ 60.4218 - What General Provisions and confidential information provisions apply to me? |
What This Subpart Covers |
§ 60.4200 - Am I subject to this subpart? |
Table 2 to Subpart IIII of Part 60 - Emission Standards for 2008 Model Year and Later Emergency Stationary CI ICE <37 KW (50 HP) With a Displacement of <10 Liters per Cylinder |
Table 3 to Subpart IIII of Part 60 - Certification Requirements for Stationary Fire Pump Engines |
Table 4 to Subpart IIII of Part 60 - —Emission Standards for Stationary Fire Pump Engines |
Table 5 to Subpart IIII of Part 60 - Labeling and Recordkeeping Requirements for New Stationary Emergency Engines |
Table 6 to Subpart IIII of Part 60 - Optional 3-Mode Test Cycle for Stationary Fire Pump Engines |
Table 7 to Subpart IIII of Part 60 - Requirements for Performance Tests for Stationary CI ICE With a Displacement of =30 Liters per Cylinder |
Table 8 to Subpart IIII of Part 60 - Applicability of General Provisions to Subpart IIII |
Subpart J - Standards of Performance for Petroleum Refineries |
§ 60.100 - Applicability, designation of affected facility, and reconstruction. |
§ 60.101 - Definitions. |
§ 60.102 - Standard for particulate matter. |
§ 60.103 - Standard for carbon monoxide. |
§ 60.104 - Standards for sulfur oxides. |
§ 60.105 - Monitoring of emissions and operations. |
§ 60.106 - Test methods and procedures. |
§ 60.107 - Reporting and recordkeeping requirements. |
§ 60.108 - Performance test and compliance provisions. |
§ 60.109 - Delegation of authority. |
Subpart JJJ - Standards of Performance for Petroleum Dry Cleaners |
§ 60.620 - Applicability and designation of affected facility. |
§ 60.621 - Definitions. |
§ 60.622 - Standards for volatile organic compounds. |
§ 60.623 - Equivalent equipment and procedures. |
§ 60.624 - Test methods and procedures. |
§ 60.625 - Recordkeeping requirements. |
Subpart JJJJ - Standards of Performance for Stationary Spark Ignition Internal Combustion Engines |
Other Requirements for Owners and Operators |
§ 60.4235 - What fuel requirements must I meet if I am an owner or operator of a stationary SI gasoline fired internal combustion engine subject to this subpart? |
§ 60.4236 - What is the deadline for importing or installing stationary SI ICE produced in previous model years? |
§ 60.4237 - What are the monitoring requirements if I am an owner or operator of an emergency stationary SI internal combustion engine? |
General Provisions |
§ 60.4246 - What General Provisions and confidential information provisions apply to me? |
Testing Requirements for Owners and Operators |
§ 60.4244 - What test methods and other procedures must I use if I am an owner or operator of a stationary SI internal combustion engine? |
Compliance Requirements for Owners and Operators |
§ 60.4243 - What are my compliance requirements if I am an owner or operator of a stationary SI internal combustion engine? |
Mobile Source Provisions |
§ 60.4247 - What parts of the mobile source provisions apply to me if I am a manufacturer of stationary SI internal combustion engines or a manufacturer of equipment containing such engines? |
Definitions |
§ 60.4248 - What definitions apply to this subpart? |
Emission Standards for Manufacturers |
§ 60.4231 - What emission standards must I meet if I am a manufacturer of stationary SI internal combustion engines or equipment containing such engines? |
§ 60.4232 - How long must my engines meet the emission standards if I am a manufacturer of stationary SI internal combustion engines? |
Notification, Reports, and Records for Owners and Operators |
§ 60.4245 - What are my notification, reporting, and recordkeeping requirements if I am an owner or operator of a stationary SI internal combustion engine? |
Compliance Requirements for Manufacturers |
§ 60.4238 - What are my compliance requirements if I am a manufacturer of stationary SI internal combustion engines =19 KW (25 HP) or a manufacturer of equipment containing such engines? |
Emission Standards for Owners and Operators |
§ 60.4233 - What emission standards must I meet if I am an owner or operator of a stationary SI internal combustion engine? |
§ 60.4234 - How long must I meet the emission standards if I am an owner or operator of a stationary SI internal combustion engine? |
What This Subpart Covers |
§ 60.4230 - Am I subject to this subpart? |
Table 2 to Subpart JJJJ of Part 60 - Requirements for Performance Tests |
Table 3 to Subpart JJJJ of Part 60 - Applicability of General Provisions to Subpart JJJJ |
Subpart K - Standards of Performance for Storage Vessels for Petroleum Liquids for Which Construction, Reconstruction, or Modification Commenced After June 11, 1973, and Prior to May 19, 1978 |
§ 60.110 - Applicability and designation of affected facility. |
§ 60.111 - Definitions. |
§ 60.112 - Standard for volatile organic compounds (VOC). |
§ 60.113 - Monitoring of operations. |
§ 60.370 - Applicability and designation of affected facility. |
§ 60.371 - Definitions. |
§ 60.372 - Standards for lead. |
§ 60.373 - Monitoring of emissions and operations. |
§ 60.374 - Test methods and procedures. |
§ 60.630 - Applicability and designation of affected facility. |
§ 60.631 - Definitions. |
§ 60.632 - Standards. |
§ 60.633 - Exceptions. |
§ 60.634 - Alternative means of emission limitation. |
§ 60.635 - Recordkeeping requirements. |
§ 60.636 - Reporting requirements. |
Subpart KKKK - Standards of Performance for Stationary Combustion Turbines |
Monitoring |
§ 60.4335 - How do I demonstrate compliance for NOX if I use water or steam injection? |
§ 60.4340 - How do I demonstrate continuous compliance for NOX if I do not use water or steam injection? |
§ 60.4345 - What are the requirements for the continuous emission monitoring system equipment, if I choose to use this option? |
§ 60.4350 - How do I use data from the continuous emission monitoring equipment to identify excess emissions? |
§ 60.4355 - How do I establish and document a proper parameter monitoring plan? |
§ 60.4360 - How do I determine the total sulfur content of the turbine's combustion fuel? |
§ 60.4365 - How can I be exempted from monitoring the total sulfur content of the fuel? |
§ 60.4370 - How often must I determine the sulfur content of the fuel? |
Introduction |
§ 60.4300 - What is the purpose of this subpart? |
Definitions |
§ 60.4420 - What definitions apply to this subpart? |
Emission Limits |
§ 60.4315 - What pollutants are regulated by this subpart? |
§ 60.4320 - What emission limits must I meet for nitrogen oxides (NOX)? |
§ 60.4325 - What emission limits must I meet for NOX if my turbine burns both natural gas and distillate oil (or some other combination of fuels)? |
§ 60.4330 - What emission limits must I meet for sulfur dioxide (SO2? |
Applicability |
§ 60.4305 - Does this subpart apply to my stationary combustion turbine? |
§ 60.4310 - What types of operations are exempt from these standards of performance? |
Performance Tests |
§ 60.4400 - How do I conduct the initial and subsequent performance tests, regarding NOX? |
§ 60.4405 - How do I perform the initial performance test if I have chosen to install a NOX-diluent CEMS? |
§ 60.4410 - How do I establish a valid parameter range if I have chosen to continuously monitor parameters? |
§ 60.4415 - How do I conduct the initial and subsequent performance tests for sulfur? |
General Compliance Requirements |
§ 60.4333 - What are my general requirements for complying with this subpart? |
Reporting |
§ 60.4375 - What reports must I submit? |
§ 60.4380 - How are excess emissions and monitor downtime defined for NOX? |
§ 60.4385 - How are excess emissions and monitoring downtime defined for SO2? |
§ 60.4390 - What are my reporting requirements if I operate an emergency combustion turbine or a research and development turbine? |
§ 60.4395 - When must I submit my reports? |
Table 1 to Subpart KKKK of Part 60 - Nitrogen Oxide Emission Limits for New Stationary Combustion Turbines |
Subpart L - Standards of Performance for Secondary Lead Smelters for Which Construction, Reconstruction, or Modification Commenced After June 11, 1973, and On or Before December 1, 2022 |
§ 60.120 - Applicability and designation of affected facility. |
§ 60.121 - Definitions. |
§ 60.122 - Standard for particulate matter. |
§ 60.123 - Test methods and procedures. |
§ 60.124 - Monitoring requirements. |
§ 60.125 - Notification, recordkeeping, and reporting requirements. |
Subpart LL - Standards of Performance for Metallic Mineral Processing Plants |
§ 60.380 - Applicability and designation of affected facility. |
§ 60.381 - Definitions. |
§ 60.382 - Standard for particulate matter. |
§ 60.383 - Reconstruction. |
§ 60.384 - Monitoring of operations. |
§ 60.385 - Recordkeeping and reporting requirements. |
§ 60.386 - Test methods and procedures. |
§ 60.640 - Applicability and designation of affected facilities. |
§ 60.641 - Definitions. |
§ 60.642 - Standards for sulfur dioxide. |
§ 60.643 - Compliance provisions. |
§ 60.644 - Test methods and procedures. |
§ 60.645 - [Reserved] |
§ 60.646 - Monitoring of emissions and operations. |
§ 60.647 - Recordkeeping and reporting requirements. |
§ 60.648 - Optional procedure for measuring hydrogen sulfide in acid gas - Tutwiler Procedure. |
Subpart LLLL - Standards of Performance for New Sewage Sludge Incineration Units |
Operator Training and Qualification |
§ 60.4810 - What are the operator training and qualification requirements? |
§ 60.4815 - When must the operator training course be completed? |
§ 60.4820 - How do I obtain my operator qualification? |
§ 60.4825 - How do I maintain my operator qualification? |
§ 60.4830 - How do I renew my lapsed operator qualification? |
§ 60.4835 - What if all the qualified operators are temporarily not accessible? |
§ 60.4840 - What site-specific documentation is required and how often must it be reviewed by qualified operators and plant personnel? |
Emission Limits, Emission Standards, and Operating Limits and Requirements |
§ 60.4845 - What emission limits and standards must I meet and by when? |
§ 60.4850 - What operating limits and requirements must I meet and by when? |
§ 60.4860 - Do the emission limits, emission standards, and operating limits apply during periods of startup, shutdown, and malfunction? |
§ 60.4861 - How do I establish an affirmative defense for exceedance of an emission limit or standard during malfunction? |
Recordkeeping and Reporting |
§ 60.4910 - What records must I keep? |
§ 60.4915 - What reports must I submit? |
Title V Operating Permits |
§ 60.4920 - Am I required to apply for and obtain a title V operating permit for my unit? |
§ 60.4925 - When must I submit a title V permit application for my new SSI unit? |
Definitions |
§ 60.4930 - What definitions must I know? |
Continuous Compliance Requirements |
§ 60.4885 - How and when do I demonstrate continuous compliance with the emission limits and standards? |
§ 60.4890 - How do I demonstrate continuous compliance with my operating limits? |
§ 60.4895 - By what date must I conduct annual air pollution control device inspections and make any necessary repairs? |
Initial Compliance Requirements |
§ 60.4865 - How and when do I demonstrate initial compliance with the emission limits and standards? |
§ 60.4870 - How do I establish my operating limits? |
§ 60.4875 - By what date must I conduct the initial air pollution control device inspection and make any necessary repairs? |
Introduction |
§ 60.4760 - What does this subpart do? |
§ 60.4765 - When does this subpart become effective? |
Performance Testing, Monitoring, and Calibration Requirements |
§ 60.4900 - What are the performance testing, monitoring, and calibration requirements for compliance with the emission limits and standards? |
§ 60.4905 - What are the monitoring and calibration requirements for compliance with my operating limits? |
Preconstruction Siting Analysis |
§ 60.4800 - Who must prepare a siting analysis? |
§ 60.4805 - What is a siting analysis? |
Applicability and Delegation of Authority |
§ 60.4770 - Does this subpart apply to my sewage sludge incineration unit? |
§ 60.4775 - What is a new sewage sludge incineration unit? |
§ 60.4780 - What sewage sludge incineration units are exempt from this subpart? |
§ 60.4785 - Who implements and enforces this subpart? |
§ 60.4790 - How are these new source performance standards structured? |
§ 60.4795 - Do all nine components of these new source performance standards apply at the same time? |
Table 1 to Subpart LLLL of Part 60 - Emission Limits and Standards for New Fluidized Bed Sewage Sludge Incineration Units |
Table 2 to Subpart LLLL of Part 60 - Emission Limits and Standards for New Multiple Hearth Sewage Sludge Incineration Units |
Table 3 to Subpart LLLL of Part 60 - Operating Parameters for New Sewage Sludge Incineration Units a |
Table 4 to Subpart LLLL of Part 60 - Toxic Equivalency Factors |
Table 5 to Subpart LLLL of Part 60 - Summary of Reporting Requirements for New Sewage Sludge Incineration Units a |
Subpart M - Standards of Performance for Secondary Brass and Bronze Production Plants |
§ 60.130 - Applicability and designation of affected facility. |
§ 60.131 - Definitions. |
§ 60.132 - Standard for particulate matter. |
§ 60.133 - Test methods and procedures. |
§ 60.390 - Applicability and designation of affected facility. |
§ 60.391 - Definitions. |
§ 60.392 - Standards for volatile organic compounds. |
§ 60.393 - Performance test and compliance provisions. |
§ 60.394 - Monitoring of emissions and operations. |
§ 60.395 - Reporting and recordkeeping requirements. |
§ 60.396 - Reference methods and procedures. |
§ 60.397 - Modifications. |
§ 60.398 - Innovative technology waivers. |
Subpart MMM - XXX |
Subpart MMMM - Emission Guidelines and Compliance Times for Existing Sewage Sludge Incineration Units |
Model Rule—Operator Training and Qualification |
Model Rule—Recordkeeping and Reporting |
Model Rule - Emission Limits, Emission Standards, and Operating Limits and Requirements |
§ 60.5165 - What emission limits and standards must I meet and by when? |
§ 60.5170 - What operating limits and requirements must I meet and by when? |
§ 60.5180 - Do the emission limits, emission standards, and operating limits apply during periods of startup, shutdown, and malfunction? |
§ 60.5181 - How do I establish an affirmative defense for exceedance of an emission limit or standard during malfunction? |
Model Rule - Recordkeeping and Reporting |
§ 60.5230 - What records must I keep? |
§ 60.5235 - What reports must I submit? |
Model Rule - Initial Compliance Requirements |
§ 60.5185 - How and when do I demonstrate initial compliance with the emission limits and standards? |
§ 60.5190 - How do I establish my operating limits? |
§ 60.5195 - By what date must I conduct the initial air pollution control device inspection and make any necessary repairs? |
Model Rule - Performance Testing, Monitoring, and Calibration Requirements |
§ 60.5220 - What are the performance testing, monitoring, and calibration requirements for compliance with the emission limits and standards? |
§ 60.5225 - What are the monitoring and calibration requirements for compliance with my operating limits? |
Model Rule—Increments of Progress |
Model Rule—Initial Compliance Requirements |
Model Rule-Definitions |
§ 60.5250 - What definitions must I know? |
Model Rule - Title V Operating Permits |
§ 60.5240 - Am I required to apply for and obtain a Title V operating permit for my existing SSI unit? |
§ 60.5245 - When must I submit a title V permit application for my existing SSI unit? |
Applicability of State Plans |
§ 60.5060 - What SSI units must I address in my state plan? |
§ 60.5065 - What SSI units are exempt from my state plan? |
Model Rule—Performance Testing, Monitoring, and Calibration Requirements |
Introduction |
§ 60.5000 - What is the purpose of this subpart? |
§ 60.5005 - Am I affected by this subpart? |
§ 60.5010 - Is a state plan required for all states? |
§ 60.5015 - What must I include in my state plan? |
§ 60.5020 - Is there an approval process for my state plan? |
§ 60.5025 - What if my state plan is not approvable? |
§ 60.5030 - Is there an approval process for a negative declaration letter? |
§ 60.5035 - What compliance schedule must I include in my state plan? |
§ 60.5040 - Are there any state plan requirements for this subpart that apply instead of the requirements specified in subpart B? |
§ 60.5045 - In lieu of a state plan submittal, are there other acceptable option(s) for a state to meet its section 111(d)/129 (b)(2) obligations? |
§ 60.5050 - What authorities will not be delegated to state, local, or tribal agencies? |
§ 60.5055 - Does this subpart directly affect SSI unit owners and operators in my state? |
Model Rule—Emission Limits, Emission Standards, and Operating Limits and Requirements |
Model Rule - Increments of Progress |
§ 60.5085 - What are my requirements for meeting increments of progress and achieving final compliance? |
§ 60.5090 - When must I complete each increment of progress? |
§ 60.5095 - What must I include in the notifications of achievement of increments of progress? |
§ 60.5100 - When must I submit the notifications of achievement of increments of progress? |
§ 60.5105 - What if I do not meet an increment of progress? |
§ 60.5110 - How do I comply with the increment of progress for submittal of a control plan? |
§ 60.5115 - How do I comply with the increment of progress for achieving final compliance? |
§ 60.5120 - What must I do if I close my SSI unit and then restart it? |
§ 60.5125 - What must I do if I plan to permanently close my SSI unit and not restart it? |
Model Rule - Continuous Compliance Requirements |
§ 60.5205 - How and when do I demonstrate continuous compliance with the emission limits and standards? |
§ 60.5210 - How do I demonstrate continuous compliance with my operating limits? |
§ 60.5215 - By what date must I conduct annual air pollution control device inspections and make any necessary repairs? |
Use of Model Rule |
§ 60.5070 - What is the “model rule” in this subpart? |
§ 60.5075 - How does the model rule relate to the required elements of my state plan? |
§ 60.5080 - What are the principal components of the model rule? |
Model Rule—Title V Operating Permits |
Model Rule - Operator Training and Qualification |
§ 60.5130 - What are the operator training and qualification requirements? |
§ 60.5135 - When must the operator training course be completed? |
§ 60.5140 - How do I obtain my operator qualification? |
§ 60.5145 - How do I maintain my operator qualification? |
§ 60.5150 - How do I renew my lapsed operator qualification? |
§ 60.5155 - What if all the qualified operators are temporarily not accessible? |
§ 60.5160 - What site-specific documentation is required and how often must it be reviewed by qualified operators and plant personnel? |
Model Rule—Continuous Compliance Requirements |
Table 1 to Subpart MMMM of Part 60 - Model Rule - Increments of Progress and Compliance Schedules for Existing Sewage Sludge Incineration Units |
Table 2 to Subpart MMMM of Part 60 - Model Rule - Emission Limits and Standards for Existing Fluidized Bed Sewage Sludge Incineration Units |
Table 3 to Subpart MMMM of Part 60 - Model Rule - Emission Limits and Standards for Existing Multiple Hearth Sewage Sludge Incineration Units |
Table 4 to Subpart MMMM of Part 60 - Model Rule - Operating Parameters for Existing Sewage Sludge Incineration Units a |
Table 5 to Subpart MMMM of Part 60 - Model Rule - Toxic Equivalency Factors |
Table 6 to Subpart MMMM of Part 60 - Model Rule - Summary of Reporting Requirements for Existing Sewage Sludge Incineration Units a |
Subpart N - Standards of Performance for Primary Emissions from Basic Oxygen Process Furnaces for Which Construction is Commenced After June 11, 1973 |
§ 60.140 - Applicability and designation of affected facility. |
§ 60.141 - Definitions. |
§ 60.142 - Standard for particulate matter. |
§ 60.143 - Monitoring of operations. |
§ 60.144 - Test methods and procedures. |
Subpart NN - Standards of Performance for Phosphate Rock Plants |
§ 60.400 - Applicability and designation of affected facility. |
§ 60.401 - Definitions. |
§ 60.402 - Standard for particulate matter. |
§ 60.403 - Monitoring of emissions and operations. |
§ 60.404 - Test methods and procedures. |
§ 60.660 - Applicability and designation of affected facility. |
§ 60.661 - Definitions. |
§ 60.662 - Standards. |
§ 60.663 - Monitoring of emissions and operations. |
§ 60.664 - Test methods and procedures. |
§ 60.665 - Reporting and recordkeeping requirements. |
§ 60.666 - Reconstruction. |
§ 60.667 - Chemicals affected by subpart NNN. |
§ 60.668 - Delegation of authority. |
Subpart NNNN - XXX |
Subpart O - Standards of Performance for Sewage Treatment Plants |
§ 60.150 - Applicability and designation of affected facility. |
§ 60.151 - Definitions. |
§ 60.152 - Standard for particulate matter. |
§ 60.153 - Monitoring of operations. |
§ 60.154 - Test methods and procedures. |
§ 60.155 - Reporting. |
§ 60.156 - Delegation of authority. |
Subpart OOO - Standards of Performance for Nonmetallic Mineral Processing Plants |
§ 60.670 - Applicability and designation of affected facility. |
§ 60.671 - Definitions. |
§ 60.672 - Standard for particulate matter (PM). |
§ 60.673 - Reconstruction. |
§ 60.674 - Monitoring of operations. |
§ 60.675 - Test methods and procedures. |
§ 60.676 - Reporting and recordkeeping. |
Table 1 to Subpart OOO - Exceptions to Applicability of Subpart A to Subpart OOO |
Table 2 to Subpart OOO - Stack Emission Limits for Affected Facilities With Capture Systems |
Table 3 to Subpart OOO - Fugitive Emission Limits |
Table 1 to Subpart OOO of Part 60 - Exceptions to Applicability of Subpart A to Subpart OOO |
Table 2 to Subpart OOO of Part 60 - Stack Emission Limits for Affected Facilities With Capture Systems |
Table 3 to Subpart OOO of Part 60 - Fugitive Emission Limits |
§ 60.5360 - What is the purpose of this subpart? |
§ 60.5365 - Am I subject to this subpart? |
§ 60.5370 - When must I comply with this subpart? |
§ 60.5371 - What standards apply to super-emitter events? |
§ 60.5375 - What standards apply to gas well affected facilities? |
§ 60.5380 - What standards apply to centrifugal compressor affected facilities? |
§ 60.5385 - What standards apply to reciprocating compressor affected facilities? |
§ 60.5390 - What standards apply to pneumatic controller affected facilities? |
§ 60.5395 - What standards apply to storage vessel affected facilities? |
§ 60.5400 - What equipment leak standards apply to affected facilities at an onshore natural gas processing plant? |
§ 60.5401 - What are the exceptions to the equipment leak standards for affected facilities at onshore natural gas processing plants? |
§ 60.5402 - What are the alternative emission limitations for equipment leaks from onshore natural gas processing plants? |
§ 60.5405 - What standards apply to sweetening units at onshore natural gas processing plants? |
§ 60.5406 - What test methods and procedures must I use for my sweetening units affected facilities at onshore natural gas processing plants? |
§ 60.5407 - What are the requirements for monitoring of emissions and operations from my sweetening unit affected facilities at onshore natural gas processing plants? |
§ 60.5408 - What is an optional procedure for measuring hydrogen sulfide in acid gas - Tutwiler Procedure? |
§ 60.5413 - What are the performance testing procedures for control devices used to demonstrate compliance at my storage vessel or centrifugal compressor affected facility? |
§ 60.5417 - What are the continuous control device monitoring requirements for my storage vessel or centrifugal compressor affected facility? |
§ 60.5420 - What are my notification, reporting, and recordkeeping requirements? |
§ 60.5421 - What are my additional recordkeeping requirements for my affected facility subject to VOC requirements for onshore natural gas processing plants? |
§ 60.5422 - What are my additional reporting requirements for my affected facility subject to VOC requirements for onshore natural gas processing plants? |
§ 60.5423 - What additional recordkeeping and reporting requirements apply to my sweetening unit affected facilities at onshore natural gas processing plants? |
§ 60.5425 - What part of the General Provisions apply to me? |
§ 60.5430 - What definitions apply to this subpart? |
Table 1 to Subpart OOOO of Part 60 - Required Minimum Initial SO2 Emission Reduction Efficiency (Zi) |
Table 2 to Subpart OOOO of Part 60 - Required Minimum SO2 Emission Reduction Efficiency (Zc) |
Table 3 to Subpart OOOO of Part 60 - Applicability of General Provisions to Subpart OOOO |
§§ 60.5431--60.5499 - [Reserved] |
Subpart P - Standards of Performance for Primary Copper Smelters |
§ 60.160 - Applicability and designation of affected facility. |
§ 60.161 - Definitions. |
§ 60.162 - Standard for particulate matter. |
§ 60.163 - Standard for sulfur dioxide. |
§ 60.164 - Standard for visible emissions. |
§ 60.165 - Monitoring of operations. |
§ 60.166 - Test methods and procedures. |
Subpart PP - Standards of Performance for Ammonium Sulfate Manufacture |
§ 60.420 - Applicability and designation of affected facility. |
§ 60.421 - Definitions. |
§ 60.422 - Standards for particulate matter. |
§ 60.423 - Monitoring of operations. |
§ 60.424 - Test methods and procedures. |
Subpart PPP - Standard of Performance for Wool Fiberglass Insulation Manufacturing Plants |
§ 60.680 - Applicability and designation of affected facility. |
§ 60.681 - Definitions. |
§ 60.682 - Standard for particulate matter. |
§ 60.683 - Monitoring of operations. |
§ 60.684 - Recordkeeping and reporting requirements. |
§ 60.685 - Test methods and procedures. |
Subpart PPPP - XXX |
Subpart Q - Standards of Performance for Primary Zinc Smelters |
§ 60.170 - Applicability and designation of affected facility. |
§ 60.171 - Definitions. |
§ 60.172 - Standard for particulate matter. |
§ 60.173 - Standard for sulfur dioxide. |
§ 60.174 - Standard for visible emissions. |
§ 60.175 - Monitoring of operations. |
§ 60.176 - Test methods and procedures. |
Subpart QQ - Standards of Performance for the Graphic Arts Industry: Publication Rotogravure Printing |
§ 60.430 - Applicability and designation of affected facility. |
§ 60.431 - Definitions and notations. |
§ 60.432 - Standard for volatile organic compounds. |
§ 60.433 - Performance test and compliance provisions. |
§ 60.434 - Monitoring of operations and recordkeeping. |
§ 60.435 - Test methods and procedures. |
Subpart QQQ - Standards of Performance for VOC Emissions From Petroleum Refinery Wastewater Systems |
§ 60.690 - Applicability and designation of affected facility. |
§ 60.691 - Definitions. |
§ 60.694 - Permission to use alternative means of emission limitation. |
§ 60.695 - Monitoring of operations. |
§ 60.696 - Performance test methods and procedures and compliance provisions. |
§ 60.697 - Recordkeeping requirements. |
§ 60.698 - Reporting requirements. |
§ 60.699 - Delegation of authority. |
§ 60.692-1 - Standards: General. |
§ 60.692-2 - Standards: Individual drain systems. |
§ 60.692-3 - Standards: Oil-water separators. |
§ 60.692-4 - Standards: Aggregate facility. |
§ 60.692-5 - Standards: Closed vent systems and control devices. |
§ 60.692-6 - Standards: Delay of repair. |
§ 60.692-7 - Standards: Delay of compliance. |
§ 60.693-1 - Alternative standards for individual drain systems. |
§ 60.693-2 - Alternative standards for oil-water separators. |
Subpart QQQQ - Standards of Performance for New Residential Hydronic Heaters and Forced-Air Furnaces |
§ 60.5472 - Am I subject to this subpart? |
§ 60.5473 - What definitions must I know? |
§ 60.5474 - What standards and requirements must I meet and by when? |
§ 60.5475 - What compliance and certification requirements must I meet and by when? |
§ 60.5476 - What test methods and procedures must I use to determine compliance with the standards and requirements for certification? |
§ 60.5477 - What procedures must I use for EPA approval of a test laboratory or EPA approval of a third-party certifier? |
§ 60.5478 - What requirements must I meet for permanent labels, temporary labels (hangtags), and owner's manuals? |
§ 60.5479 - What records must I keep and what reports must I submit? |
§ 60.5480 - What activities are prohibited under this subpart? |
§ 60.5481 - What hearing and appeal procedures apply to me? |
§ 60.5482 - Who implements and enforces this subpart? |
§ 60.5483 - What parts of the General Provisions do not apply to me? |
Subpart R - Standards of Performance for Primary Lead Smelters |
§ 60.180 - Applicability and designation of affected facility. |
§ 60.181 - Definitions. |
§ 60.182 - Standard for particulate matter. |
§ 60.183 - Standard for sulfur dioxide. |
§ 60.184 - Standard for visible emissions. |
§ 60.185 - Monitoring of operations. |
§ 60.186 - Test methods and procedures. |
Subpart RR - Standards of Performance for Pressure Sensitive Tape and Label Surface Coating Operations |
§ 60.440 - Applicability and designation of affected facility. |
§ 60.441 - Definitions and symbols. |
§ 60.442 - Standard for volatile organic compounds. |
§ 60.443 - Compliance provisions. |
§ 60.444 - Performance test procedures. |
§ 60.445 - Monitoring of operations and recordkeeping. |
§ 60.446 - Test methods and procedures. |
§ 60.447 - Reporting requirements. |
§ 60.700 - Applicability and designation of affected facility. |
§ 60.701 - Definitions. |
§ 60.702 - Standards. |
§ 60.703 - Monitoring of emissions and operations. |
§ 60.704 - Test methods and procedures. |
§ 60.705 - Reporting and recordkeeping requirements. |
§ 60.706 - Reconstruction. |
§ 60.707 - Chemicals affected by subpart RRR. |
§ 60.708 - Delegation of authority. |
Subpart S - Standards of Performance for Primary Aluminum Reduction Plants |
§ 60.190 - Applicability and designation of affected facility. |
§ 60.191 - Definitions. |
§ 60.192 - Standard for fluorides. |
§ 60.193 - Standard for visible emissions. |
§ 60.194 - Monitoring of operations. |
§ 60.195 - Test methods and procedures. |
Subpart SS - Standards of Performance for Industrial Surface Coating: Large Appliances |
§ 60.450 - Applicability and designation of affected facility. |
§ 60.451 - Definitions. |
§ 60.452 - Standard for volatile organic compounds. |
§ 60.453 - Performance test and compliance provisions. |
§ 60.454 - Monitoring of emissions and operations. |
§ 60.455 - Reporting and recordkeeping requirements. |
§ 60.456 - Test methods and procedures. |
Subpart SSS - Standards of Performance for Magnetic Tape Coating Facilities |
§ 60.710 - Applicability and designation of affected facility. |
§ 60.711 - Definitions, symbols, and cross reference tables. |
§ 60.712 - Standards for volatile organic compounds. |
§ 60.713 - Compliance provisions. |
§ 60.714 - Installation of monitoring devices and recordkeeping. |
§ 60.715 - Test methods and procedures. |
§ 60.716 - Permission to use alternative means of emission limitation. |
§ 60.717 - Reporting and monitoring requirements. |
§ 60.718 - Delegation of authority. |
Subpart T - Standards of Performance for the Phosphate Fertilizer Industry: Wet-Process Phosphoric Acid Plants |
§ 60.200 - Applicability and designation of affected facility. |
§ 60.201 - Definitions. |
§ 60.202 - Standard for fluorides. |
§ 60.203 - Monitoring of operations. |
§ 60.204 - Test methods and procedures. |
§ 60.205 - Recordkeeping. |
Subpart TT - Standards of Performance for Metal Coil Surface Coating |
§ 60.460 - Applicability and designation of affected facility. |
§ 60.461 - Definitions. |
§ 60.462 - Standards for volatile organic compounds. |
§ 60.463 - Performance test and compliance provisions. |
§ 60.464 - Monitoring of emissions and operations. |
§ 60.465 - Reporting and recordkeeping requirements. |
§ 60.466 - Test methods and procedures. |
Subpart TTT - Standards of Performance for Industrial Surface Coating: Surface Coating of Plastic Parts for Business Machines |
§ 60.720 - Applicability and designation of affected facility. |
§ 60.721 - Definitions. |
§ 60.722 - Standards for volatile organic compounds. |
§ 60.723 - Performance tests and compliance provisions. |
§ 60.724 - Reporting and recordkeeping requirements. |
§ 60.725 - Test methods and procedures. |
§ 60.726 - Delegation of authority. |
Subpart TTTT - Standards of Performance for Greenhouse Gas Emissions for Electric Generating Units |
Monitoring and Compliance Determination Procedures |
§ 60.5535 - How do I monitor and collect data to demonstrate compliance? |
§ 60.5540 - How do I demonstrate compliance with my CO2 emissions standard and determine excess emissions? |
Other Requirements and Information |
§ 60.5570 - What parts of the general provisions apply to my affected EGU? |
§ 60.5575 - Who implements and enforces this subpart? |
§ 60.5580 - What definitions apply to this subpart? |
Applicability |
§ 60.5508 - What is the purpose of this subpart? |
§ 60.5509 - What are my general requirements for complying with this subpart? |
Notification, Reports, and Records |
§ 60.5550 - What notifications must I submit and when? |
§ 60.5555 - What reports must I submit and when? |
§ 60.5560 - What records must I maintain? |
§ 60.5565 - In what form and how long must I keep my records? |
Emission Standards |
§ 60.5515 - Which pollutants are regulated by this subpart? |
§ 60.5520 - What CO2 emissions standard must I meet? |
General Compliance Requirements |
§ 60.5525 - What are my general requirements for complying with this subpart? |
Table 3 to Subpart TTTT of Part 60 - —Applicability of Subpart A of Part 60 (General Provisions) to Subpart TTTT |
Subpart U - Standards of Performance for the Phosphate Fertilizer Industry: Superphosphoric Acid Plants |
§ 60.210 - Applicability and designation of affected facility. |
§ 60.211 - Definitions. |
§ 60.212 - Standard for fluorides. |
§ 60.213 - Monitoring of operations. |
§ 60.214 - Test methods and procedures. |
§ 60.215 - Recordkeeping. |
Subpart UU - Standards of Performance for Asphalt Processing and Asphalt Roofing Manufacture |
§ 60.470 - Applicability and designation of affected facilities. |
§ 60.471 - Definitions. |
§ 60.472 - Standards for particulate matter. |
§ 60.473 - Monitoring of operations. |
§ 60.474 - Test methods and procedures. |
Subpart UUU - Standards of Performance for Calciners and Dryers in Mineral Industries |
§ 60.730 - Applicability and designation of affected facility. |
§ 60.731 - Definitions. |
§ 60.732 - Standards for particulate matter. |
§ 60.733 - Reconstruction. |
§ 60.734 - Monitoring of emissions and operations. |
§ 60.735 - Recordkeeping and reporting requirements. |
§ 60.736 - Test methods and procedures. |
§ 60.737 - Delegation of authority. |
Subpart UUUU - Emission Guidelines for Greenhouse Gas Emissions and Compliance Times for Electric Utility Generating Units |
Emission Rate Credit Requirements |
§ 60.5795 - What affected EGUs qualify for generation of ERCs? |
§ 60.5800 - What other resources qualify for issuance of ERCs? |
§ 60.5805 - What is the process for the issuance of ERCs? |
§ 60.5810 - What applicable requirements are there for an ERC tracking system? |
Recordkeeping and Reporting Requirements |
§ 60.5865 - What are my recordkeeping requirements? |
§ 60.5870 - What are my reporting and notification requirements? |
§ 60.5875 - How do I submit information required by these emission guidelines to the EPA? |
Mass Allocation Requirements |
§ 60.5815 - What are the requirements for State allocation of allowances in a mass-based program? |
§ 60.5820 - What are my allowance tracking requirements? |
§ 60.5825 - What is the process for affected EGUs to demonstrate compliance in a mass-based program? |
Applicability of Plans to Affected Egus |
§ 60.5840 - Does this subpart directly affect EGU owners or operators in my State? |
§ 60.5845 - What affected EGUs must I address in my State plan? |
§ 60.5850 - What EGUs are excluded from being affected EGUs? |
§ 60.5855 - What are the CO2 emission performance rates for affected EGUs? |
§ 60.5860 - What applicable monitoring, recordkeeping, and reporting requirements do I need to include in my plan for affected EGUs? |
State and Multi-State Plan Requirements |
§ 60.5740 - What must I include in my federally enforceable State or multi-State plan? |
§ 60.5745 - What must I include in my final plan submittal? |
§ 60.5750 - Can I work with other States to develop a multi-State plan? |
§ 60.5760 - What are the timing requirements for submitting my plan? |
§ 60.5765 - What must I include in an initial submittal if requesting an extension for a final plan submittal? |
§ 60.5770 - What schedules, performance periods, and compliance periods must I include in my plan? |
§ 60.5775 - What emission standards must I include in my plan? |
§ 60.5780 - What State measures may I rely upon in support of my plan? |
§ 60.5785 - What is the procedure for revising my plan? |
§ 60.5790 - What must I do to meet my plan obligations? |
Evaluation Measurement and Verification Plans and Monitoring and Verification Reports |
§ 60.5830 - What are the requirements for EM&V plans for eligible resources? |
§ 60.5835 - What are the requirements for M&V reports for eligible resources? |
Introduction |
§ 60.5700 - What is the purpose of this subpart? |
§ 60.5705 - Which pollutants are regulated by this subpart? |
§ 60.5710 - Am I affected by this subpart? |
§ 60.5715 - What is the review and approval process for my plan? |
§ 60.5720 - What if I do not submit a plan or my plan is not approvable? |
§ 60.5725 - In lieu of a State plan submittal, are there other acceptable option(s) for a State to meet its CAA section 111(d) obligations? |
§ 60.5730 - Is there an approval process for a negative declaration letter? |
§ 60.5735 - What authorities will not be delegated to State, local, or tribal agencies? |
§ 60.5736 - Will the EPA impose any sanctions? |
§ 60.5737 - What is the Clean Energy Incentive Program and how do I participate? |
Definitions |
§ 60.5880 - What definitions apply to this subpart? |
Table 1 to Subpart UUUU of Part 60 - CO2 Emission Performance Rates |
Table 2 to Subpart UUUU of Part 60 - Statewide Rate-Based CO2 Emission Goals |
Table 3 to Subpart UUUU of Part 60 - Statewide Mass-Based CO2 Emission Goals |
Table 4 to Subpart UUUU of Part 60 - Statewide Mass-based CO2 Goals plus New Source CO2 Emission Complement |
Subpart V - Standards of Performance for the Phosphate Fertilizer Industry: Diammonium Phosphate Plants |
§ 60.220 - Applicability and designation of affected facility. |
§ 60.221 - Definitions. |
§ 60.222 - Standard for fluorides. |
§ 60.223 - Monitoring of operations. |
§ 60.224 - Test methods and procedures. |
§ 60.225 - Recordkeeping. |
§ 60.480 - Applicability and designation of affected facility. |
§ 60.481 - Definitions. |
§ 60.484 - Equivalence of means of emission limitation. |
§ 60.485 - Test methods and procedures. |
§ 60.486 - Recordkeeping requirements. |
§ 60.487 - Reporting requirements. |
§ 60.488 - Reconstruction. |
§ 60.489 - List of chemicals produced by affected facilities. |
§ 60.482-1 - Standards: General. |
§ 60.482-2 - Standards: Pumps in light liquid service. |
§ 60.482-3 - Standards: Compressors. |
§ 60.482-4 - Standards: Pressure relief devices in gas/vapor service. |
§ 60.482-5 - Standards: Sampling connection systems. |
§ 60.482-6 - Standards: Open-ended valves or lines. |
§ 60.482-7 - Standards: Valves in gas/vapor service and in light liquid service. |
§ 60.482-8 - Standards: Pumps and valves in heavy liquid service, pressure relief devices in light liquid or heavy liquid service, and connectors. |
§ 60.482-9 - Standards: Delay of repair. |
§ 60.482-10 - Standards: Closed vent systems and control devices. |
§ 60.483-1 - Alternative standards for valves - allowable percentage of valves leaking. |
§ 60.483-2 - Alternative standards for valves - skip period leak detection and repair. |
Subpart VVV - Standards of Performance for Polymeric Coating of Supporting Substrates Facilities |
§ 60.740 - Applicability and designation of affected facility. |
§ 60.741 - Definitions, symbols, and cross-reference tables. |
§ 60.742 - Standards for volatile organic compounds. |
§ 60.743 - Compliance provisions. |
§ 60.744 - Monitoring requirements. |
§ 60.745 - Test methods and procedures. |
§ 60.746 - Permission to use alternative means of emission limitation. |
§ 60.747 - Reporting and recordkeeping requirements. |
§ 60.748 - Delegation of authority. |
Subpart W - Standards of Performance for the Phosphate Fertilizer Industry: Triple Superphosphate Plants |
§ 60.230 - Applicability and designation of affected facility. |
§ 60.231 - Definitions. |
§ 60.232 - Standard for fluorides. |
§ 60.233 - Monitoring of operations. |
§ 60.234 - Test methods and procedures. |
§ 60.235 - Recordkeeping. |
Subpart WW - Standards of Performance for the Beverage Can Surface Coating Industry |
§ 60.490 - Applicability and designation of affected facility. |
§ 60.491 - Definitions. |
§ 60.492 - Standards for volatile organic compounds. |
§ 60.493 - Performance test and compliance provisions. |
§ 60.494 - Monitoring of emissions and operations. |
§ 60.495 - Reporting and recordkeeping requirements. |
§ 60.496 - Test methods and procedures. |
Subpart WWW - Standards of Performance for Municipal Solid Waste Landfills That Commenced Construction, Reconstruction, or Modification on or After May 30, 1991, but Before July 18, 2014 |
§ 60.750 - Applicability, designation of affected facility, and delegation of authority. |
§ 60.751 - Definitions. |
§ 60.752 - Standards for air emissions from municipal solid waste landfills. |
§ 60.753 - Operational standards for collection and control systems. |
§ 60.754 - Test methods and procedures. |
§ 60.755 - Compliance provisions. |
§ 60.756 - Monitoring of operations. |
§ 60.757 - Reporting requirements. |
§ 60.758 - Recordkeeping requirements. |
§ 60.759 - Specifications for active collection systems. |
Method 1 - Sample and Velocity Traverses for Stationary Sources |
Method 2A - Direct Measurement of Gas Volume Through Pipes and Small Ducts |
Method 2C - Determination of Stack Gas Velocity and Volumetric Flow Rate in Small Stacks or Ducts (Standard Pitot Tube) |
Method 2F - Determination of Stack Gas Velocity And Volumetric Flow Rate With Three-Dimensional Probes |
Appendix A to Part 60 - Test Methods |
Subpart X - Standards of Performance for the Phosphate Fertilizer Industry: Granular Triple Superphosphate Storage Facilities |
§ 60.240 - Applicability and designation of affected facility. |
§ 60.241 - Definitions. |
§ 60.242 - Standard for fluorides. |
§ 60.243 - Monitoring of operations. |
§ 60.244 - Test methods and procedures. |
§ 60.245 - Recordkeeping. |
Subpart XX - Standards of Performance for Bulk Gasoline Terminals That Commenced Construction, Modification, or Reconstruction After December 17, 1980, and On or Before June 10, 2022 |
§ 60.500 - Applicability and designation of affected facility. |
§ 60.501 - Definitions. |
§ 60.502 - Standard for Volatile Organic Compound (VOC) emissions from bulk gasoline terminals. |
§ 60.503 - Test methods and procedures. |
§ 60.504 - [Reserved] |
§ 60.505 - Reporting and recordkeeping. |
§ 60.506 - Reconstruction. |
Subpart XXX - Standards of Performance for Municipal Solid Waste Landfills That Commenced Construction, Reconstruction, or Modification After July 17, 2014 |
§ 60.760 - Applicability, designation of affected source, and delegation of authority. |
§ 60.761 - Definitions. |
§ 60.762 - Standards for air emissions from municipal solid waste landfills. |
§ 60.763 - Operational standards for collection and control systems. |
§ 60.764 - Test methods and procedures. |
§ 60.765 - Compliance provisions. |
§ 60.766 - Monitoring of operations. |
§ 60.767 - Reporting requirements. |
§ 60.768 - Recordkeeping requirements. |
§ 60.769 - Specifications for active collection systems. |
Subpart Y - Standards of Performance for Coal Preparation and Processing Plants |
§ 60.250 - Applicability and designation of affected facility. |
§ 60.251 - Definitions. |
§ 60.252 - Standards for thermal dryers. |
§ 60.253 - Standards for pneumatic coal-cleaning equipment. |
§ 60.254 - Standards for coal processing and conveying equipment, coal storage systems, transfer and loading systems, and open storage piles. |
§ 60.255 - Performance tests and other compliance requirements. |
§ 60.256 - Continuous monitoring requirements. |
§ 60.257 - Test methods and procedures. |
§ 60.258 - Reporting and recordkeeping. |
Subparts YYY--ZZZ - XXX |
Subpart Z - Standards of Performance for Ferroalloy Production Facilities |
§ 60.260 - Applicability and designation of affected facility. |
§ 60.261 - Definitions. |
§ 60.262 - Standard for particulate matter. |
§ 60.263 - Standard for carbon monoxide. |
§ 60.264 - Emission monitoring. |
§ 60.265 - Monitoring of operations. |
§ 60.266 - Test methods and procedures. |
Subpart Ba - Adoption and Submittal of State Plans for Designated Facilities |
§ 60.20a - Applicability. |
§ 60.21a - Definitions. |
§ 60.22a - Publication of emission guidelines. |
§ 60.23a - Adoption and submittal of State plans; public hearings. |
§ 60.24a - Standards of performance and compliance schedules. |
§ 60.25a - Emission inventories, source surveillance, reports. |
§ 60.26a - Legal authority. |
§ 60.27a - Actions by the Administrator. |
§ 60.28a - Plan revisions by the State. |
§ 60.29a - Plan revisions by the Administrator. |
Subpart Ca - XXX |
Subpart Cb - Emissions Guidelines and Compliance Times for Large Municipal Waste Combustors That are Constructed on or Before September 20, 1994 |
§ 60.30b - Scope and delegation of authority. |
Table 1 to Subpart Cb of Part 60 - Nitrogen Oxides Guidelines for Designated Facilities |
Table 2 to Subpart Cb of Part 60 - Nitrogen Oxides Limits for Existing Designated Facilities Included in an Emissions Averaging Plan at a Municipal Waste Combustor Plant b |
Table 3 to Subpart Cb of Part 60 - Municipal Waste Combustor Operating Guidelines |
§ 60.31b - Definitions. |
§ 60.32b - Designated facilities. |
§ 60.33b - Emission guidelines for municipal waste combustor metals, acid gases, organics, and nitrogen oxides. |
§ 60.34b - Emission guidelines for municipal waste combustor operating practices. |
§ 60.35b - Emission guidelines for municipal waste combustor operator training and certification. |
§ 60.36b - Emission guidelines for municipal waste combustor fugitive ash emissions. |
§ 60.37b - Emission guidelines for air curtain incinerators. |
§ 60.38b - Compliance and performance testing. |
§ 60.39b - Reporting and recordkeeping guidelines and compliance schedules. |
Subpart Da - Standards of Performance for Electric Utility Steam Generating Units |
§ 60.40a - Applicability and designation of affected facility. |
§ 60.40Da - Applicability and designation of affected facility. |
§ 60.50Da - Compliance determination procedures and methods. |
§ 60.41a - Definitions. |
§ 60.41Da - Definitions. |
§ 60.51Da - Reporting requirements. |
§ 60.42a - Standard for particulate matter. |
§ 60.42Da - Standards for particulate matter (PM). |
§ 60.52Da - Recordkeeping requirements. |
§ 60.43a - Standard for sulfur dioxide. |
§ 60.43Da - Standards for sulfur dioxide (SO2). |
§ 60.44a - Standard for nitrogen oxides. |
§ 60.44Da - Standards for nitrogen oxides (NO2). |
§ 60.45a - Commercial demonstration permit. |
§ 60.45Da - Alternative standards for combined nitrogen oxides (NOX) and carbon monoxide (CO). |
§ 60.46a - Compliance provisions. |
§ 60.46Da - [Reserved] |
§ 60.47a - Emission monitoring. |
§ 60.47Da - Commercial demonstration permit. |
§ 60.48a - Compliance determination pro-cedures and methods. |
§ 60.48Da - Compliance provisions. |
§ 60.49a - Reporting requirements. |
§ 60.49Da - Emission monitoring. |
Subpart Cc - Emission Guidelines and Compliance Times for Municipal Solid Waste Landfills |
§ 60.290 - Applicability and designation of affected facility. |
§ 60.291 - Definitions. |
§ 60.292 - Standards for particulate matter. |
§ 60.293 - Standards for particulate matter from glass melting furnace with modified-processes. |
§ 60.296 - Test methods and procedures. |
§ 60.30c - Scope. |
§ 60.31c - Definitions. |
§ 60.32c - Designated facilities. |
§ 60.33c - Emission guidelines for municipal solid waste landfill emissions. |
§§ 60.294--60.295 - [Reserved] |
§ 60.34c - Test methods and procedures. |
§ 60.35c - Reporting and recordkeeping guidelines. |
§ 60.36c - Compliance times. |
Subpart Db - Standards of Performance for Industrial-Commercial-Institutional Steam Generating Units |
§ 60.40b - Applicability and delegation of authority. |
§ 60.41b - Definitions. |
§ 60.42b - Standard for sulfur dioxide (SO2). |
§ 60.43b - Standard for particulate matter (PM). |
§ 60.44b - Standard for nitrogen oxides (NO2). |
§ 60.45b - Compliance and performance test methods and procedures for sulfur dioxide. |
§ 60.46b - Compliance and performance test methods and procedures for particulate matter and nitrogen oxides. |
§ 60.47b - Emission monitoring for sulfur dioxide. |
§ 60.48b - Emission monitoring for particulate matter and nitrogen oxides. |
§ 60.49b - Reporting and recordkeeping requirements. |
Subpart Ea - Standards of Performance for Municipal Waste Combustors for Which Construction Is Commenced After December 20, 1989 and On or Before September 20, 1994 |
§ 60.50a - Applicability and delegation of authority. |
§ 60.51a - Definitions. |
§ 60.52a - Standard for municipal waste combustor metals. |
§ 60.53a - Standard for municipal waste combustor organics. |
§ 60.54a - Standard for municipal waste combustor acid gases. |
§ 60.55a - Standard for nitrogen oxides. |
§ 60.56a - Standards for municipal waste combustor operating practices. |
§ 60.57a - [Reserved] |
§ 60.58a - Compliance and performance testing. |
§ 60.59a - Reporting and recordkeeping requirements. |
Subpart Cd - Emissions Guidelines and Compliance Times for Sulfuric Acid Production Units |
§ 60.30d - Designated facilities. |
§ 60.31d - Emissions guidelines. |
§ 60.32d - Compliance times. |
Subpart Dc - Standards of Performance for Small Industrial-Commercial-Institutional Steam Generating Units |
§ 60.40c - Applicability and delegation of authority. |
§ 60.41c - Definitions. |
§ 60.42c - Standard for sulfur dioxide (SO2). |
§ 60.43c - Standard for particulate matter (PM). |
§ 60.44c - Compliance and performance test methods and procedures for sulfur dioxide. |
§ 60.45c - Compliance and performance test methods and procedures for particulate matter. |
§ 60.46c - Emission monitoring for sulfur dioxide. |
§ 60.47c - Emission monitoring for particulate matter. |
§ 60.48c - Reporting and recordkeeping requirements. |
§ 60.50b - Applicability and delegation of authority. |
§ 60.51b - Definitions. |
§ 60.52b - Standards for municipal waste combustor metals, acid gases, organics, and nitrogen oxides. |
§ 60.53b - Standards for municipal waste combustor operating practices. |
§ 60.54b - Standards for municipal waste combustor operator training and certification. |
§ 60.55b - Standards for municipal waste combustor fugitive ash emissions. |
§ 60.56b - Standards for air curtain incinerators. |
§ 60.57b - Siting requirements. |
§ 60.58b - Compliance and performance testing. |
§ 60.59b - Reporting and recordkeeping requirements. |
Subpart Ce - Emission Guidelines and Compliance Times for Hospital/Medical/Infectious Waste Incinerators |
§ 60.30e - Scope. |
Table 1 to Subpart Ce - Emission Limits for Small, Medium, and Large HMIWI |
Table 2 to Subpart Ce - Emissions Limits for Small HMIWI Which Meet the Criteria Under § 60.33e(b) |
Table 1A to Subpart Ce of Part 60 - Emissions Limits for Small, Medium, and Large HMIWI at Designated Facilities as Defined in § 60.32e(a)(1) |
Table 2A to Subpart Ce of Part 60 - Emissions Limits for Small HMIWI Which Meet the Criteria Under § 60.33e(b)(1) |
Table 1B to Subpart Ce of Part 60 - Emissions Limits for Small, Medium, and Large HMIWI at Designated Facilities as Defined in § 60.32e(a)(1) and (a)(2) |
Table 2B to Subpart Ce of Part 60 - Emissions Limits for Small HMIWI Which Meet the Criteria Under § 60.33e(b)(2) |
§ 60.31e - Definitions. |
§ 60.32e - Designated facilities. |
§ 60.33e - Emissions guidelines. |
§ 60.34e - Operator training and qualification guidelines. |
§ 60.35e - Waste management guidelines. |
§ 60.36e - Inspection guidelines. |
§ 60.37e - Compliance, performance testing, and monitoring guidelines. |
§ 60.38e - Reporting and recordkeeping guidelines. |
§ 60.39e - Compliance times. |
Subpart Ec - Standards of Performance for New Stationary Sources: Hospital/Medical/Infectious Waste Incinerators |
§ 60.50c - Applicability and delegation of authority. |
Table 1 to Subpart Ec - Emission Limits for Small, Medium, and Large HMIWI |
Table 3 to Subpart Ec - Operating Parameters to be Monitored and Minimum Measurement and Recording Frequencies |
Table 2 To Supbart Ec - Toxic Equivalency Factors |
Table 2 of Subpart Ec of Part 60 - Toxic Equivalency Factors |
Table 1 to Subpart Ec of Part 60 - Emission Limits for Small, Medium, and Large HMIWI |
Table 2 of Subpart Ec to Part 60 - Toxic Equivalency Factors |
Table 2 to Subpart Ec of Part 60 - Toxic Equivalency Factors |
Table 3 to Subpart Ec of Part 60 - Operating Parameters To Be Monitored and Minimum Measurement and Recording Frequencies |
Table 1A to Subpart Ec of Part 60 - Emissions Limits for Small, Medium, and Large HMIWI at Affected Facilities as Defined in § 60.50c(a)(1) and (2) |
Table 1B to Subpart Ec of Part 60 - Emissions Limits for Small, Medium, and Large HMIWI at Affected Facilities as Defined in § 60.50c(a)(3) and (4) |
§ 60.51c - Definitions. |
§ 60.52c - Emission limits. |
§ 60.53c - Operator training and qualification requirements. |
§ 60.54c - Siting requirements. |
§ 60.55c - Waste management plan. |
§ 60.56c - Compliance and performance testing. |
§ 60.57c - Monitoring requirements. |
§ 60.58c - Reporting and recordkeeping requirements. |
Subpart Ga - Standards of Performance for Nitric Acid Plants for Which Construction, Reconstruction, or Modification Commenced After October 14, 2011 |
§ 60.70a - Applicability and designation of affected facility. |
§ 60.71a - Definitions. |
§ 60.72a - Standards. |
§ 60.73a - Emissions testing and monitoring. |
§ 60.74a - Affirmative defense for violations of emission standards during malfunction. |
§ 60.75a - Calculations. |
§ 60.76a - Recordkeeping. |
§ 60.77a - Reporting. |
Subpart Cf - Emission Guidelines and Compliance Times for Municipal Solid Waste Landfills |
§ 60.30f - Scope and delegated authorities. |
§ 60.40f - Specifications for active collection systems. |
§ 60.31f - Designated facilities. |
§ 60.41f - Definitions. |
§ 60.32f - Compliance times. |
§ 60.33f - Emission Guidelines for municipal solid waste landfill emissions. |
§ 60.34f - Operational standards for collection and control systems. |
§ 60.35f - Test methods and procedures. |
§ 60.36f - Compliance provisions. |
§ 60.37f - Monitoring of operations. |
§ 60.38f - Reporting guidelines. |
§ 60.39f - Recordkeeping guidelines. |
Subpart Ja - Standards of Performance for Petroleum Refineries for Which Construction, Reconstruction, or Modification Commenced After May 14, 2007 |
§ 60.100a - Applicability, designation of affected facility, and reconstruction. |
Table 1 to Subpart Ja of Part 60 - Molar Exhaust Volumes and Molar Heat Content of Fuel Gas Constituents |
§ 60.101a - Definitions. |
§ 60.102a - Emissions limitations. |
§ 60.103a - Design, equipment, work practice or operational standards. |
§ 60.104a - Performance tests. |
§ 60.105a - Monitoring of emissions and operations for fluid catalytic cracking units (FCCU) and fluid coking units (FCU). |
§ 60.106a - Monitoring of emissions and operations for sulfur recovery plants. |
§ 60.107a - Monitoring of emissions and operations for fuel gas combustion devices and flares. |
§ 60.108a - Recordkeeping and reporting requirements. |
§ 60.109a - Delegation of authority. |
Subpart Ka - Standards of Performance for Storage Vessels for Petroleum Liquids for Which Construction, Reconstruction, or Modification Commenced After May 18, 1978, and Prior to July 23, 1984 |
§ 60.110a - Applicability and designation of affected facility. |
§ 60.111a - Definitions. |
§ 60.112a - Standard for volatile organic compounds (VOC). |
§ 60.113a - Testing and procedures. |
§ 60.114a - Alternative means of emission limitation. |
§ 60.115a - Monitoring of operations. |
§ 60.110b - Applicability and designation of affected facility. |
§ 60.111b - Definitions. |
§ 60.112b - Standard for volatile organic compounds (VOC). |
§ 60.113b - Testing and procedures. |
§ 60.114b - Alternative means of emission limitation. |
§ 60.115b - Reporting and recordkeeping requirements. |
§ 60.116b - Monitoring of operations. |
§ 60.117b - Delegation of authority. |
Subpart La - Standards of Performance for Secondary Lead Smelters for Which Construction, Reconstruction, or Modification Commenced After December 1, 2022 |
§ 60.120a - Applicability and designation of affected facility. |
§ 60.121a - Definitions. |
§ 60.122a - Standard for particulate matter. |
§ 60.123a - Test methods and procedures. |
§ 60.124a - Monitoring requirements. |
§ 60.125a - Notification, recordkeeping, and reporting requirements. |
Subpart Na - Standards of Performance for Secondary Emissions from Basic Oxygen Process Steelmaking Facilities for Which Construction is Commenced After January 20, 1983 |
§ 60.140a - Applicability and designation of affected facilities. |
§ 60.141a - Definitions. |
§ 60.142a - Standards for particulate matter. |
§ 60.143a - Monitoring of operations. |
§ 60.144a - Test methods and procedures. |
§ 60.145a - Compliance provisions. |
Subpart AAb - Standards of Performance for Steel Plants: Electric Arc Furnaces and Argon-Oxygen Decarbonization Vessels Constructed After May 16, 2022 |
§ 60.270b - Applicability and designation of affected facility. |
§ 60.271b - Definitions. |
§ 60.272b - Standard for particulate matter. |
§ 60.273b - Emission monitoring. |
§ 60.274b - Monitoring of operations. |
§ 60.275b - Test methods and procedures. |
§ 60.276b - Recordkeeping and reporting requirements. |
Subpart BBa - Standards of Performance for Kraft Pulp Mill Affected Sources for Which Construction, Reconstruction, or Modification Commenced After May 23, 2013 |
§ 60.280a - Applicability and designation of affected facility. |
§ 60.281a - Definitions. |
§ 60.282a - Standard for filterable particulate matter. |
§ 60.283a - Standard for total reduced sulfur (TRS). |
§ 60.284a - Monitoring of emissions and operations. |
§ 60.285a - Test methods and procedures. |
§ 60.286a - Affirmative defense for violations of emission standards during malfunction. |
§ 60.287a - Recordkeeping. |
§ 60.288a - Reporting. |
Subpart KKa - Standards of Performance for Lead Acid Battery Manufacturing Plants for Which Construction, Modification or Reconstruction Commenced After February 23, 2022 |
§ 60.370a - Applicability and designation of affected facility. |
§ 60.371a - Definitions. |
§ 60.372a - Standards for lead. |
§ 60.373a - Monitoring of emissions and operations. |
§ 60.374a - Test methods and procedures. |
§ 60.375a - Recordkeeping and reporting requirements. |
Subpart MMa - Standards of Performance for Automobile and Light Duty Truck Surface Coating Operations for which Construction, Modification or Reconstruction Commenced After May 18, 2022 |
§ 60.390a - Applicability and designation of affected facility. |
Table 1 to Subpart MMa of Part 60 - Operating Limits for Capture Systems and Add-On Control Devices |
Appendix A to Subpart MMa of Part 60 - Determination of Capture Efficiency of Automobile and Light-Duty Truck Spray Booth Emissions From Solvent-Borne Coatings Using Panel Testing |
§ 60.391a - Definitions. |
§ 60.392a - Standards for volatile organic compounds. |
§ 60.393a - Performance test and compliance provisions. |
§ 60.394a - Add-on control device operating limits and monitoring requirements. |
§ 60.395a - Notifications, reports, and records. |
§ 60.396a - Add-on control device destruction efficiency. |
§ 60.397a - Emission capture system efficiency. |
§ 60.480a - Applicability and designation of affected facility. |
§ 60.482-10a - Standards: Closed vent systems and control devices. |
§ 60.481a - Definitions. |
§ 60.482-1a - Standards: General. |
§ 60.482-11a - Standards: Connectors in gas/vapor service and in light liquid service. |
§ 60.483-1a - Alternative standards for valves - allowable percentage of valves leaking. |
§ 60.482-2a - Standards: Pumps in light liquid service. |
§ 60.483-2a - Alternative standards for valves - skip period leak detection and repair. |
§ 60.482-3a - Standards: Compressors. |
§ 60.484a - Equivalence of means of emission limitation. |
§ 60.482-4a - Standards: Pressure relief devices in gas/vapor service. |
§ 60.485a - Test methods and procedures. |
§ 60.482-5a - Standards: Sampling connection systems. |
§ 60.486a - Recordkeeping requirements. |
§ 60.482-6a - Standards: Open-ended valves or lines. |
§ 60.487a - Reporting requirements. |
§ 60.482-7a - Standards: Valves in gas/vapor service and in light liquid service. |
§ 60.488a - Reconstruction. |
§ 60.482-8a - Standards: Pumps, valves, and connectors in heavy liquid service and pressure relief devices in light liquid or heavy liquid service. |
§ 60.489a - List of chemicals produced by affected facilities. |
§ 60.482-9a - Standards: Delay of repair. |
§ 60.480b - Applicability and designation of affected facility. |
§ 60.482-10b - Standards: Closed vent systems and control devices. |
§ 60.481b - Definitions. |
§ 60.482-1b - Standards: General. |
§ 60.482-11b - Standards: Connectors in gas/vapor service and in light liquid service. |
§ 60.483-1b - Alternative standards for valves—allowable percentage of valves leaking. |
§ 60.482-2b - Standards: Pumps in light liquid service. |
§ 60.483-2b - Alternative standards for valves—skip period leak detection and repair. |
§ 60.482-3b - Standards: Compressors. |
§ 60.482-4b - Standards: Pressure relief devices in gas/vapor service. |
§ 60.484b - Equivalence of means of emission limitation. |
§ 60.482-5b - Standards: Sampling connection systems. |
§ 60.485b - Test methods and procedures. |
§ 60.482-6b - Standards: Open-ended valves or lines. |
§ 60.486b - Recordkeeping requirements. |
§ 60.482-7b - Standards: Valves in gas/vapor service and in light liquid service. |
§ 60.487b - Reporting requirements. |
§ 60.482-8b - Standards: Pumps, valves, and connectors in heavy liquid service and pressure relief devices in light liquid or heavy liquid service. |
§ 60.488b - Reconstruction. |
§ 60.482-9b - Standards: Delay of repair. |
§ 60.489b - List of chemicals produced by affected facilities. |
Subpart XXa - Standards of Performance for Bulk Gasoline Terminals that Commenced Construction, Modification, or Reconstruction After June 10, 2022 |
§ 60.500a - Applicability and designation of affected facility. |
§ 60.501a - Definitions. |
§ 60.502a - Standard for volatile organic compound (VOC) emissions from bulk gasoline terminals. |
§ 60.503a - Test methods and procedures. |
§ 60.504a - Monitoring requirements. |
§ 60.505a - Recordkeeping and reporting. |
Subpart GGGa - Standards of Performance for Equipment Leaks of VOC in Petroleum Refineries for Which Construction, Reconstruction, or Modification Commenced After November 7, 2006 |
§ 60.590a - Applicability and designation of affected facility. |
§ 60.591a - Definitions. |
§ 60.592a - Standards. |
§ 60.593a - Exceptions. |
§ 60.610a - Am I subject to this subpart? |
§ 60.620a - What are my requirements for closed vent systems? |
Table 1 to Subpart IIIa of Part 60 - —Emission Limits and Standards for Vent Streams |
Table 2 to Subpart IIIa of Part 60 - —Monitoring Requirements for Complying With 98 Weight-Percent Reduction of Total Organic Compounds Emissions or a Limit of 20 Parts Per Million by Volume |
Table 3 to Subpart IIIa of Part 60 - —Operating Parameters, Operating Parameter Limits and Data Monitoring, Recordkeeping and Compliance Frequencies |
Table 4 to Subpart IIIa of Part 60 - —Calibration and Quality Control Requirements for Continuous Parameter Monitoring System (CPMS) |
§ 60.611a - What definitions must I know? |
§ 60.612a - What standards and associated requirements must I meet? |
§ 60.613a - What are my monitoring, installation, operation, and maintenance requirements? |
§ 60.614a - What test methods and procedures must I use to determine compliance with the standards? |
§ 60.615a - What records must I keep and what reports must I submit? |
§ 60.616a - What do the terms associated with reconstruction mean for this subpart? |
§ 60.617a - What are the chemicals that I must produce to be affected by subpart IIIa? |
§ 60.618a - [Reserved] |
§ 60.619a - What are my requirements if I use a flare to comply with this subpart? |
§ 60.660a - Am I subject to this subpart? |
§ 60.670a - What are my requirements for closed vent systems? |
Table 1 to Subpart NNNa of Part 60 - —Emission Limits and Standards for Vent Streams |
Table 2 to Subpart NNNa of Part 60 - —Monitoring Requirements for Complying With 98 Weight-Percent Reduction of Total Organic Compounds Emissions or a Limit of 20 Parts per Million by Volume |
Table 3 to Subpart NNNa of Part 60 - —Operating Parameters, Operating Parameter Limits and Data Monitoring, Recordkeeping and Compliance Frequencies |
Table 4 to Subpart NNNa of Part 60 - —Calibration and Quality Control Requirements for Continuous Parameter Monitoring System (CPMS) |
§ 60.661a - What definitions must I know? |
§ 60.662a - What standards and associated requirements must I meet? |
§ 60.663a - What are my monitoring, installation, operation, and maintenance requirements? |
§ 60.664a - What test methods and procedures must I use to determine compliance with the standards? |
§ 60.665a - What records must I keep and what reports must I submit? |
§ 60.666a - What do the terms associated with reconstruction mean for this subpart? |
§ 60.667a - What are the chemicals that I must produce to be affected by subpart NNNa? |
§ 60.668a - [Reserved] |
§ 60.669a - What are my requirements if I use a flare to comply with this subpart? |
§ 60.700a - Am I subject to this subpart? |
§ 60.710a - What are my requirements for closed vent systems? |
Table 1 to Subpart RRRa of Part 60 - —Emission Limits and Standards for Vent Streams |
Table 2 to Subpart RRRa of Part 60 - —Monitoring Requirements for Complying With 98 Weight-Percent Reduction of Total Organic Compounds Emissions or a Limit of 20 Parts Per Million by Volume |
Table 3 to Subpart RRRa of Part 60 - —Operating Parameters, Operating Parameter Limits and Data Monitoring, Recordkeeping and Compliance Frequencies |
Table 4 to Subpart RRRa of Part 60 - —Calibration and Quality Control Requirements for Continuous Parameter Monitoring System (CPMS) |
§ 60.701a - What definitions must I know? |
§ 60.702a - What standards and associated requirements must I meet? |
§ 60.703a - What are my monitoring, installation, operation, and maintenance requirements? |
§ 60.704a - What test methods and procedures must I use to determine compliance with the standards? |
§ 60.705a - What records must I keep and what reports must I submit? |
§ 60.706a - What do the terms associated with reconstruction mean for this subpart? |
§ 60.707a - What are the chemicals that I must produce to be affected by subpart RRRa? |
§ 60.708a - [Reserved] |
§ 60.709a - What are my requirements if I use a flare to comply with this subpart? |
§ 60.720a - Applicability and designation of affected facility. |
§ 60.721a - Definitions. |
§ 60.722a - Standards for volatile organic compounds. |
§ 60.723a - Performance tests and compliance provisions. |
§ 60.724a - Reporting and recordkeeping requirements. |
§ 60.725a - Test methods and procedures. |
§ 60.726a - Delegation of authority. |
Subpart - Operator Training and Qualification |
Air Curtain Incinerators That Burn Only Wood Waste, Clean Lumber, and Yard Waste |
Definitions |
Initial Compliance Requirements |
Temporary-Use Incinerators and Air Curtain Incinerators Used in Disaster Recovery |
Emission Limitations and Operating Limits |
Continuous Compliance Requirements |
Equations |
Recordkeeping and Reporting |
Title V Operating Permits |
Monitoring |
Performance Testing |
Tables to Subpart EEEE of Part 60 |
Subpart - Preconstruction Siting Analysis |
Waste Management Plan |
Subpart - Applicability |
§ 60.5360a - What is the purpose of this subpart? |
§ 60.5370a - When must I comply with this subpart? |
§ 60.5380a - What GHG and VOC standards apply to centrifugal compressor affected facilities? |
§ 60.5390a - What GHG and VOC standards apply to pneumatic controller affected facilities? |
§ 60.5400a - What equipment leak GHG and VOC standards apply to affected facilities at an onshore natural gas processing plant? |
§ 60.5420a - What are my notification, reporting, and recordkeeping requirements? |
§ 60.5430a - What definitions apply to this subpart? |
Table 1 to Subpart OOOOa of Part 60 - —Required Minimum Initial SO2 Emission Reduction Efficiency (Zi) |
Table 2 to Subpart OOOOa of Part 60 - —Required Minimum SO2 Emission Reduction Efficiency (Zc) |
Table 3 to Subpart OOOOa of Part 60 - Applicability of General Provisions to Subpart OOOOa |
§ 60.5401a - What are the exceptions to the equipment leak GHG and VOC standards for affected facilities at onshore natural gas processing plants? |
§ 60.5421a - What are my additional recordkeeping requirements for my affected facility subject to GHG and VOC requirements for onshore natural gas processing plants? |
§ 60.5371a - What standards apply to super-emitter events? |
§ 60.5402a - What are the alternative means of emission limitations for GHG and VOC equipment leaks from onshore natural gas processing plants? |
§ 60.5422a - What are my additional reporting requirements for my affected facility subject to GHG and VOC requirements for onshore natural gas processing plants? |
§ 60.5432a - How do I determine whether a well is a low pressure well using the low pressure well equation? |
§ 60.5393a - What GHG and VOC standards apply to pneumatic pump affected facilities? |
§ 60.5413a - What are the performance testing procedures for control devices used to demonstrate compliance at my centrifugal compressor and storage vessel affected facilities? |
§ 60.5423a - What additional recordkeeping and reporting requirements apply to my sweetening unit affected facilities? |
§§ 60.5433a--60.5439a - [Reserved] |
§§ 60.5433a--60.5499a - [Reserved] |
§ 60.5365a - Am I subject to this subpart? |
§ 60.5375a - What GHG and VOC standards apply to well affected facilities? |
§ 60.5385a - What GHG and VOC standards apply to reciprocating compressor affected facilities? |
§ 60.5395a - What VOC standards apply to storage vessel affected facilities? |
§ 60.5405a - What standards apply to sweetening unit affected facilities? |
§ 60.5425a - What parts of the General Provisions apply to me? |
§ 60.5406a - What test methods and procedures must I use for my sweetening unit affected facilities? |
§ 60.5407a - What are the requirements for monitoring of emissions and operations from my sweetening unit affected facilities? |
§ 60.5417a - What are the continuous control device monitoring requirements for my centrifugal compressor and storage vessel affected facilities? |
§ 60.5408a - What is an optional procedure for measuring hydrogen sulfide in acid gas - Tutwiler Procedure? |
Subpart OOOOb - Standards of Performance for Crude Oil and Natural Gas Facilities for Which Construction, Modification or Reconstruction Commenced After December 6, 2022 |
§ 60.5360b - What is the purpose of this subpart? |
§ 60.5370b - When must I comply with this subpart? |
§ 60.5380b - What GHG and VOC standards apply to centrifugal compressor affected facilities? |
§ 60.5390b - What GHG and VOC standards apply to process controller affected facilities? |
§ 60.5400b - What GHG and VOC standards apply to process unit equipment affected facilities? |
§ 60.5410b - How do I demonstrate initial compliance with the standards for each of my affected facilities? |
§ 60.5420b - What are my notification, reporting, and recordkeeping requirements? |
§ 60.5430b - What definitions apply to this subpart? |
Table 3 to Subpart OOOOb of Part 60 - —Required Minimum Initial SO2 Emission Reduction Efficiency (Zi) |
Table 4 to Subpart OOOOb of Part 60 - —Required Minimum SO2 Emission Reduction Efficiency (Zc) |
Table 5 to Subpart OOOOb of Part 60 - —Applicability of General Provisions to Subpart OOOOb |
§ 60.5371b - What GHG and VOC standards apply to super-emitter events? |
§ 60.5401b - What are the alternative GHG and VOC standards for process unit equipment affected facilities? |
§ 60.5411b - What additional requirements must I meet to determine initial compliance for my covers and closed vent systems? |
§ 60.5421b - What are my additional recordkeeping requirements for process unit equipment affected facilities? |
§ 60.5402b - What are the exceptions to the GHG and VOC standards for process unit equipment affected facilities? |
§ 60.5412b - What additional requirements must I meet for determining initial compliance of my control devices? |
§ 60.5422b - What are my additional reporting requirements for process unit equipment affected facilities? |
§ 60.5432b - How do I determine whether a well is a low pressure well using the low pressure well equation? |
§ 60.5393b - What GHG and VOC standards apply to pump affected facilities? |
§ 60.5403b - What test methods and procedures must I use for my process unit equipment affected facilities? |
§ 60.5413b - What are the performance testing procedures for control devices? |
§ 60.5423b - What are my additional recordkeeping and reporting requirements for sweetening unit affected facilities? |
§§ 60.5433b--60.5439b - [Reserved] |
§ 60.5365b - Am I subject to this subpart? |
§ 60.5375b - What GHG and VOC standards apply to well completions at well affected facilities? |
§ 60.5385b - What GHG and VOC standards apply to reciprocating compressor affected facilities? |
§ 60.5395b - What GHG and VOC standards apply to storage vessel affected facilities? |
§ 60.5405b - What standards apply to sweetening unit affected facilities? |
§ 60.5415b - How do I demonstrate continuous compliance with the standards for each of my affected facilities? |
§ 60.5425b - What parts of the General Provisions apply to me? |
§ 60.5376b - What GHG and VOC standards apply to gas well liquids unloading operations at well affected facilities? |
§ 60.5386b - What test methods and procedures must I use for my centrifugal compressor and reciprocating compressor affected facilities? |
§ 60.5406b - What test methods and procedures must I use for my sweetening unit affected facilities? |
§ 60.5416b - What are the initial and continuous cover and closed vent system inspection and monitoring requirements? |
§ 60.5377b - What GHG and VOC standards apply to associated gas wells at well affected facilities? |
§ 60.5397b - What GHG and VOC standards apply to fugitive emissions components affected facilities? |
§ 60.5407b - What are the requirements for monitoring of emissions and operations from my sweetening unit affected facilities? |
§ 60.5417b - What are the continuous monitoring requirements for my control devices? |
§ 60.5408b - What is an optional procedure for measuring hydrogen sulfide in acid gas—Tutwiler Procedure? |
Subpart OOOOc - Emissions Guidelines for Greenhouse Gas Emissions From Existing Crude Oil and Natural Gas Facilities |
Applicability of State or Tribal Plans |
§ 60.5375c - What designated facilities must I address in my state or Tribal plan? |
Model Rule—Definitions |
§ 60.5430c - What definitions apply to this subpart? |
§§ 60.5431c--60.5439c - [Reserved] |
Model Rule—Increments of Progress |
§ 60.5380c - What if I do not meet the final control plan increment of progress compliance date? |
§ 60.5381c - How do I comply with the increment of progress for submittal of a final compliance control plan? |
§ 60.5379c - What are my requirements for meeting increments of progress and achieving final compliance? |
Introduction |
§ 60.5360c - What is the purpose of this subpart? |
§ 60.5370c - What compliance schedule must I include in my state or Tribal plan? |
§ 60.5361c - Which pollutants are regulated by this subpart? |
§ 60.5371c - What requirements apply to revisions to my state or Tribal plan? |
§ 60.5362c - Am I affected by this subpart? |
§ 60.5372c - In lieu of a state or Tribal plan submittal, are there other acceptable option(s) for a state to meet its Clean Air Act section 111(d) obligations? |
§ 60.5363c - What must I include in my state or Tribal plan? |
§ 60.5373c - What authorities will not be delegated to state, local, or Tribal agencies? |
§ 60.5364c - How do I apply to use my state standards as part of my state or Tribal plan submission? |
§ 60.5374c - Does this subpart directly affect designated facility owners and operators in my state? |
§ 60.5365c - How do I apply for a less stringent standard taking into consideration the remaining useful life of a designated facility and other factors? |
§ 60.5366c - [Reserved] |
§ 60.5367c - Is there an approval process for my state or Tribal plan? |
§ 60.5368c - What if my state or Tribal plan is not approvable? |
§ 60.5369c - Is there an approval process for a negative declaration letter? |
Model Rule—Recordkeeping and Reporting |
§ 60.5420c - What are my notification, reporting, and recordkeeping requirements? |
§ 60.5421c - What are my additional recordkeeping requirements for process unit equipment designated facilities? |
§ 60.5422c - What are my additional reporting requirements for process unit equipment designated facilities? |
§ 60.5425c - What parts of the General Provisions apply to me? |
Model Rule—Test Methods and Performance Testing |
§ 60.5405c - What test methods and procedures must I use for my centrifugal compressor and reciprocating compressor designated facilities? |
§ 60.5406c - What test methods and procedures must I use for my process unit equipment designated facilities? |
Model Rule—Applicability |
§ 60.5385c - What is the purpose of this subpart? |
§ 60.5386c - Am I subject to this subpart? |
§ 60.5387c - When must I comply with this subpart? |
Model Rule—Initial Compliance Requirements |
§ 60.5410c - How do I demonstrate initial compliance with the standards for each of my designated facilities? |
§ 60.5411c - What additional requirements must I meet to determine initial compliance for my covers and closed vent systems? |
§ 60.5412c - What additional requirements must I meet for determining initial compliance of my control devices? |
§ 60.5413c - What are the performance testing procedures for control devices? |
Model Rule—Continuous Compliance Requirements |
§ 60.5415c - How do I demonstrate continuous compliance with the standards for each of my designated facilities? |
§ 60.5416c - What are the initial and continuous cover and closed vent system inspection and monitoring requirements? |
§ 60.5417c - What are the continuous monitoring requirements for my control devices? |
Use of Model Rule |
§ 60.5376c - What is the “model rule” in this subpart? |
§ 60.5377c - How does the model rule relate to the required elements of my state or Tribal plan? |
§ 60.5378c - What are the principal components of the model rule? |
Model Rule—Emission and Work Practice Standards |
§ 60.5390c - What GHG standards apply to gas well liquids unloading operations at well designated facilities? |
§ 60.5400c - What GHG standards apply to process unit equipment designated facilities? |
§ 60.5391c - What GHG standards apply to associated gas wells at well designated facilities? |
§ 60.5401c - What are the alternative GHG standards for process unit equipment designated facilities? |
§ 60.5392c - What GHG standards apply to centrifugal compressor designated facilities? |
§ 60.5402c - What are the exceptions to the GHG standards for process unit equipment designated facilities? |
§ 60.5393c - What GHG standards apply to reciprocating compressor designated facilities? |
§ 60.5394c - What GHG standards apply to process controller designated facilities? |
§ 60.5395c - What GHG standards apply to pump designated facilities? |
§ 60.5396c - What GHG standards apply to storage vessel designated facilities? |
§ 60.5397c - What GHG standards apply to fugitive emissions components designated facilities? |
§ 60.5388c - What standards apply to super-emitter events? |
Table 1 to Subpart OOOOc of Part 60 - —Designated Facility Presumptive Standards and Regulated Entity Compliance Dates |
Table 4 to Subpart OOOOc of Part 60 - —Applicability of General Provisions to Subpart OOOOc |
Notification, Reports, and Records |
§ 60.5550a - What notifications must I submit and when? |
§ 60.5560a - What records must I maintain? |
§ 60.5555a - What reports must I submit and when? |
§ 60.5565a - In what form and how long must I keep my records? |
Applicability |
§ 60.5508a - What is the purpose of this subpart? |
§ 60.5509a - Am I subject to this subpart? |
Monitoring and Compliance Determination Procedures |
§ 60.5540a - How do I demonstrate compliance with my CO2 emissions standard and determine excess emissions? |
§ 60.5535a - How do I monitor and collect data to demonstrate compliance? |
Emission Standards |
§ 60.5520a - What CO2 emissions standard must I meet? |
§ 60.5515a - Which pollutants are regulated by this subpart? |
§ 60.5525a - What are my general requirements for complying with this subpart? |
Other Requirements and Information |
§ 60.5570a - What parts of the general provisions apply to my affected EGU? |
§ 60.5580a - What definitions apply to this subpart? |
§ 60.5575a - Who implements and enforces this subpart? |
Table 2 to Subpart TTTTa of Part 60 - —CO2 Emission Standards for Affected Steam Generating Units or IGCC That Commenced Modification After May 23, 2023 |
Table 3 to Subpart TTTTa of Part 60 - —Applicability of Subpart A of Part 60 (General Provisions) to Subpart TTTTa |
Subpart UUUUa - Emission Guidelines for Greenhouse Gas Emissions From Existing Electric Utility Generating Units |
State Plan Requirements |
§ 60.5740a - What must I include in my plan submittal? |
§ 60.5750a - What schedules and compliance periods must I include in my plan? |
§ 60.5760a - What is the procedure for revising my plan? |
§ 60.5735a - What must I include in my federally enforceable State plan? |
§ 60.5745a - What are the timing requirements for submitting my plan? |
§ 60.5755a - What standards of performance must I include in my plan? |
§ 60.5765a - What must I do to meet my plan obligations? |
Definitions |
§ 60.5805a - What definitions apply to this subpart? |
Introduction |
§ 60.5700a - What is the purpose of this subpart? |
§ 60.5710a - Am I affected by this subpart? |
§ 60.5720a - What if I do not submit a plan, my plan is incomplete, or my plan is not approvable? |
§ 60.5730a - Is there an approval process for a negative declaration letter? |
§ 60.5705a - Which pollutants are regulated by this subpart? |
§ 60.5715a - What is the review and approval process for my plan? |
§ 60.5725a - In lieu of a State plan submittal, are there other acceptable option(s) for a State to meet its CAA section 111(d) obligations? |
Applicability of Plans to Designated Facilities |
§ 60.5770a - Does this subpart directly affect EGU owners or operators in my State? |
§ 60.5780a - What EGUs are excluded from being designated facilities? |
§ 60.5775a - What designated facilities must I address in my State plan? |
§ 60.5785a - What applicable monitoring, recordkeeping, and reporting requirements do I need to include in my plan for designated facilities? |
Recordkeeping and Reporting Requirements |
§ 60.5790a - What are my recordkeeping requirements? |
§ 60.5800a - How do I submit information required by these Emission Guidelines to the EPA? |
§ 60.5795a - What are my reporting and notification requirements? |
Subpart UUUUb - Emission Guidelines for Greenhouse Gas Emissions for Electric Utility Generating Units |
Definitions |
§ 60.5880b - What definitions apply to this subpart? |
Applicability of State Plans to Affected EGUs |
§ 60.5840b - Does this subpart directly affect EGU owners or operators in my State? |
§ 60.5850b - What EGUs are excluded from being affected EGUs? |
§ 60.5845b - What affected EGUs must I address in my State plan? |
Introduction |
§ 60.5700b - What is the purpose of this subpart? |
§ 60.5710b - Am I affected by this subpart? |
§ 60.5720b - What if I do not submit a State plan or my State plan is not approvable? |
§ 60.5730b - Is there an approval process for a negative declaration letter? |
§ 60.5705b - Which pollutants are regulated by this subpart? |
§ 60.5715b - What is the review and approval process for my State plan? |
§ 60.5725b - In lieu of a State plan submittal, are there other acceptable option(s) for a State to meet its CAA section 111(d) obligations? |
State Plan Requirements |
§ 60.5740b - What must I include in my federally enforceable State plan? |
§ 60.5780b - What compliance dates and compliance periods must I include in my State plan? |
§ 60.5790b - What is the procedure for revising my State plan? |
§ 60.5775b - What standards of performance must I include in my State plan? |
§ 60.5785b - What are the timing requirements for submitting my State plan? |
§ 60.5795b - Commitment to review emission guidelines for coal-fired affected EGUs |
Recordkeeping and Reporting Requirements |
§ 60.5860b - What applicable monitoring, recordkeeping, and reporting requirements do I need to include in my State plan for affected EGUs? |
§ 60.5870b - What are my reporting and notification requirements? |
§ 60.5865b - What are my recordkeeping requirements? |
§ 60.5875b - How do I submit information required by these emission guidelines to the EPA? |
§ 60.5876b - What are the recordkeeping and reporting requirements for EGUs that have committed to permanently cease operations by January 1, 2032? |
Appendix A–1 to Part 60 Test Methods 1 through 2F |
Appendix A-2 to Part 60 - Test Methods 2G through 3C |
Appendix A–3 to Part 60 Test Methods 4 through 5I |
Appendix A–4 to Part 60 Test Methods 6 through 10B |
Appendix A-5 to Part 60 - Test Methods 11 through 15A |
Appendix A-6 to Part 60 - Test Methods 16 through 18 |
Appendix A–7 to Part 60 Test Methods 19 through 25E |
Appendix A–8 to Part 60 Test Methods 26 through 30B |
Appendix B to Part 60 - —Performance Specifications |
Appendix C to Part 60 - Determination of Emission Rate Change |
Appendix D to Part 60 - Required Emission Inventory Information |
Appendix E to Part 60 |
Appendix E to Part 60 - [Reserved] |
Appendix F to Part 60 - —Quality Assurance Procedures |
Appendix G to Part 60 - Provisions for an Alternative Method of Demonstrating Compliance With 40 CFR 60.43 for the Newton Power Station of Central Illinois Public Service Company |
Appendix H to Part 60 |
Appendix H to Part 60 - [Reserved] |
Appendix I to Part 60 - Owner's Manuals and Temporary Labels for Wood Heaters Subject to Subparts AAA and QQQQ of Part 60 |
Appendix J to Part 60 - [Reserved] |
Appendix K to Part 60 - —Determination of Volatile Organic Compound and Greenhouse Gas Leaks Using Optical Gas Imaging |