Code of Federal Regulations (Last Updated: November 8, 2024) |
Title 40 - Protection of Environment |
Chapter I - Environmental Protection Agency |
SubChapter C - Air Programs |
Part 63 - National Emission Standards for Hazardous Air Pollutants for Source Categories |
Subpart PPPPPP - National Emission Standards for Hazardous Air Pollutants for Lead Acid Battery Manufacturing Area Sources |
Standards and Compliance Requirements |
§ 63.11423 - What are the standards and compliance requirements for new and existing sources?
-
§ 63.11423 What are the standards and compliance requirements for new and existing sources?
(b) You must meet the monitoring requirements in(a) You must meet all the standards for lead and opacity as specified in paragraphs (a)(1) through (3) of this section.
.(1) Until the compliance date specified in § 63.11422(e), lead acid battery manufacturing plant affected sources must comply with paragraph (a)(1)(i) or (ii) of this section.
(i) You meet all the standards for lead and opacity in 40 CFR 60.372
and the requirements of paragraphs (a)(4) and (5), (b), and (c)(1) through (3) of this section.
(ii) You comply with paragraph (a)(2) of this section.
(2) Beginning no later than the applicable compliance date specified in § 63.11422(f) or (i), you must meet each emission limit in table 1 to this subpart and each opacity standard in table 2 to this subpart that applies to you; you must meet the requirements of paragraphs (a)(4) and (5), (c), and (d) of this section; and you must also comply with the recordkeeping and electronic reporting requirements in § 63.11424(a)(6) and (7) and (b).
(3) Beginning no later than the applicable compliance date specified in § 63.11422(g) or (i), you must comply with the monitoring requirements in paragraph (e) of this section, the recordkeeping and electronic reporting requirements in § 63.11424(a)(1) through (5) and (c) through (f), and the definition of lead reclamation in § 63.11426.
(4) At all times, you must operate and maintain any affected source, including associated air pollution control equipment and monitoring equipment, in a manner consistent with safety and good air pollution control practices for minimizing emissions. The general duty to minimize emissions does not require you to make any further efforts to reduce emissions if levels required by the applicable standard in this part have been achieved. Determination of whether a source is operating in compliance with operation and maintenance requirements will be based on information available to the Administrator which may include, but is not limited to, monitoring results, review of operation and maintenance procedures, review of operation and maintenance records, and inspection of the source.
(5) When two or more facilities at the same plant (except the lead oxide manufacturing facility) are ducted to a common control device, an equivalent standard for the total exhaust from the commonly controlled facilities must be determined using equation 1 to this paragraph (a)(5) as follows:
Where:
Se = is the equivalent standard for the total exhaust stream, mg/dscm (gr/dscf).
Sa = is the actual standard for each exhaust stream ducted to the control device, mg/dscm (gr/dscf).
N = is the total number of exhaust streams ducted to the control device.
Qsda = is the dry standard volumetric flow rate of the effluent gas stream from each facility ducted to the control device, dscm/hr (dscf/hr).
QsdT = is the total dry standard volumetric flow rate of all effluent gas streams ducted to the control device, dscm/hr (dscf/hr).
(b) As specified in paragraph (a) of this section, you must meet the monitoring requirements in paragraphs (b)(1) and (2) of this section.
(1) For any emissions point controlled by a scrubbing system, you must meet the requirements in 40 CFR 60.373.
(2) For any emissions point controlled by a fabric filter, you must meet the requirements of paragraph (b)(2)(i) of this section and either paragraph (b)(2)(ii) or (iii) of this section. Fabric filters equipped with a high efficiency particulate air (HEPA) filter or other secondary filter are allowed to monitor less frequently, as specified in paragraph (b)(2)(iv) of this section.
(i) You must perform semiannual inspections and maintenance to ensure proper performance of each fabric filter. This includes inspection of structural and filter integrity. You must record the results of these inspections.
(ii) You must install, maintain, and operate a pressure drop monitoring device to measure the differential pressure drop across the fabric filter during all times when the process is operating. The pressure drop shall must be recorded at least once per day. If a pressure drop is observed outside of the normal operational ranges as specified by the manufacturer, you must record the incident and take immediate corrective actions. You must also record the corrective actions taken. You must submit a monitoring system performance report in accordance with § 63.10(e)(3).
(iii) You must conduct a visible emissions observation at least once per day while the process is in operation to verify that no visible emissions are occurring at the discharge point to the atmosphere from any emissions source subject to the requirements of paragraph (a) of this section. If visible emissions are detected, you must record the incident and conduct an opacity measurement in accordance with 40 CFR 60.374(b)(3). You must record the results of each opacity measurement. If the measurement exceeds the applicable opacity standard in 40 CFR 60.372(a)(7) or (8), you must submit this information in an excess emissions report required under § 63.10(e)(3).
(iv) Fabric filters equipped with a HEPA filter or other secondary filter are allowed to monitor less frequently, as specified in paragraph (b)(2)(iv)(A) or (B) of this section.
(A) If you are using a pressure drop monitoring device to measure the differential pressure drop across the fabric filter in accordance with paragraph (b)(2)(ii) of this section, you must record the pressure drop at least once per week. If a pressure drop is observed outside of the normal operational ranges as specified by the manufacturer, you must record the incident and take immediate corrective actions. You must also record the corrective actions taken. You must submit a monitoring system performance report in accordance with § 63.10(e)(3).
(B) If you are conducting visible emissions observations in accordance with paragraph (b)(2)(iii) of this section, you must conduct such observations at least once per week and record the results in accordance with paragraph (b)(2)(iii) of this section. If visible emissions are detected, you must record the incident and conduct an opacity measurement in accordance with 40 CFR 60.374(b)(3). You must record the results of each opacity measurement. If the measurement exceeds the applicable opacity standard in 40 CFR 60.372(a)(7) or (8), you must submit this information in an excess emissions report required under § 63.10(e)(3).
[72 FR 38913, July 16, 2007, as amended at 73 FR 15929, Mar. 26, 2008(c) You As specified in paragraph (a) of this section, you must meet the performance testing requirements in 40 CFR 60.374. paragraphs (c)(1) through (6) of this section.
(1) Existing sources are not required to conduct a an initial performance test if a prior performance test was conducted using the same methods specified in 40 CFR 60.374 this section and either no process changes have been made since the test, or you can demonstrate that the results of the performance test, with or without adjustments, reliably demonstrate compliance with this subpart despite process changes.
(2) Sources without a prior performance test, as described in paragraph (c)(1) of this section, must conduct a an initial performance test using the methods specified in paragraphs (c)(2)(i) through (iv) of this section.
.374 by 180 days after the compliance date.(i) EPA Method 12 or EPA Method 29 of appendix A to 40 CFR part 60
must be used to determine the lead concentration (CPb) and the volumetric flow rate (Qsda) of the effluent gas. The sampling time and the sample volume for each run must be at least 60 minutes and 0.85 dscm (30 dscf).
(ii) EPA Method 9 of appendix A to 40 CFR part 60 and the procedures in § 63.6(h) must be used to determine opacity. The opacity numbers must be rounded off to the nearest whole percentage. Or, as an alternative to Method 9, you may use ASTM D7520-16 (incorporated by reference, see § 63.14) with the caveats in paragraphs (c)(4)(ii)(A) through (E) of this section.
(A) During the digital camera opacity technique (DCOT) certification procedure outlined in Section 9.2 of ASTM D7520-16, you or the DCOT vendor must present the plumes in front of various backgrounds of color and contrast representing conditions anticipated during field use such as blue sky, trees, and mixed backgrounds (clouds and/or a sparse tree stand).
(B) You must also have standard operating procedures in place including daily or other frequency quality checks to ensure the equipment is within manufacturing specifications as outlined in Section 8.1 of ASTM D7520-16.
(C) You must follow the recordkeeping procedures outlined in § 63.10(b)(1) for the DCOT certification, compliance report, data sheets, and all raw unaltered JPEGs used for opacity and certification determination.
(D) You or the DCOT vendor must have a minimum of four (4) independent technology users apply the software to determine the visible opacity of the 300 certification plumes. For each set of 25 plumes, the user may not exceed 15 percent opacity of any one reading and the average error must not exceed 7.5 percent opacity.
(E) This approval does not provide or imply a certification or validation of any vendor's hardware or software. The onus to maintain and verify the certification and/or training of the DCOT camera, software, and operator in accordance with ASTM D7520-16 and this letter is on the facility, DCOT operator, and DCOT vendor.
(iii) When different operations in a three-process operation facility are ducted to separate control devices, the lead emission concentration (C) from the facility must be determined using equation 2 to this paragraph (c)(2)(iii) as follows:
Where:
C = concentration of lead emissions for the entire facility, mg/dscm (gr/dscf).
Ca = concentration of lead emissions from facility “a,” mg/dscm (gr/dscf).
Qsda = volumetric flow rate of effluent gas from facility “a,” dscm/hr (dscf/hr).
n = total number of control devices to which separate operations in the facility are ducted.
(iv) For a lead oxide manufacturing facility, the lead emission rate must be determined as specified in paragraphs (c)(2)(iv)(A) and (B) of this section.
(A) The emission rate (E) from lead oxide manufacturing facility must be computed for each run using equation 3 to this paragraph (c)(2)(iv)(A) as follows:
Where:
E = emission rate of lead, mg/kg (lb/ton) of lead charged.
CPbi = concentration of lead from emission point “i,” mg/dscm (gr/dscf).
Qsdi = volumetric flow rate of effluent gas from emission point “i,” dscm/hr (dscf/hr).
M = number of emission points in the affected facility.
P = lead feed rate to the facility, kg/hr (ton/hr).
K = conversion factor, 1.0 mg/mg (7000 gr/lb).
(B) The average lead feed rate (P) must be determined for each run using equation 4 to this paragraph (c)(2)(iv)(B) as follows:
Where:
N = number of lead ingots charged.
W = average mass of the lead ingots, kg (ton).
Θ = duration of run, hr.
(3) In conducting the initial performance tests required in § 63.7, you must use as reference methods and procedures the test methods in appendix A to 40 CFR part 60 or other methods and procedures as specified in this section, except as provided in § 63.7(f).
(4) After the initial performance test described in paragraphs (c)(1) through (3) of this section, you must conduct subsequent performance tests every 5 years to demonstrate compliance with each applicable emissions limitations and opacity standards. Within three years of February 23, 2023, performance testing must be conducted for each affected source subject to an applicable emissions limitation in tables 1 and 2 to this subpart that has not had a performance test within the last 5 years, except as described in paragraph (c)(6) of this section. Thereafter, subsequent performance tests for each affected source must be completed no less frequently than every 5 years from the date the emissions source was last tested.
(5) In lieu of conducting subsequent performance tests for each affected source, you may elect to group similar affected sources together and conduct subsequent performance tests on one representative affected source within each group of similar affected sources. The determination of whether affected sources are similar must meet the criteria in paragraph (c)(5)(i) of this section. If you decide to test representative affected sources, you must prepare and submit a testing plan as described in paragraph (c)(5)(iii) of this section.
(i) If you elect to test representative affected sources, the affected sources that are grouped together must be of the same process type (e.g., grid casting, paste mixing, three-process operations) and also have the same type of air pollution control device (e.g., fabric filters). You cannot group affected sources from different process types or with different air pollution control device types together for the purposes of this section.
(ii) The results of the performance test conducted for the affected source selected as representative of a group of similar affected sources will represent the results for each affected source within the group. In the performance test report, all affected sources in the group will need to be listed.
(iii) If you plan to conduct subsequent performance tests on representative emission units, you must submit a test plan. This test plan must be submitted to the Administrator or delegated authority for review and approval no later than 90 days prior to the first scheduled performance test. The test plan must contain the information specified in paragraphs (c)(5)(iii)(A) through (C) of this section.
(A) A list of all emission units. This list must clearly identify all emission units that have been grouped together as similar emission units. Within each group of emission units, you must identify the emission unit that will be the representative unit for that group and subject to performance testing.
(B) A list of the process type and type of air pollution control device on each emission unit.
(C) A date of last test for each emission unit and a schedule indicating when you will conduct performance tests for each emission unit within the representative groups.
(iv) If you conduct subsequent performance tests on representative emission units, the unit with the oldest test must be tested first, and each subsequent performance test must be performed for a different unit until all units in the group have been tested. The order of testing for each subsequent test must proceed such that the unit in the group with the least recent performance test is the next unit to be tested.
(6) You may not conduct performance tests during periods of malfunction. You must record the process information that is necessary to document operating conditions during the test and include in such record an explanation to support that such conditions represent normal operation. You must make available to the Administrator in the test report, records as may be necessary to determine the conditions of performance tests.
(d) Beginning no later than the applicable compliance date specified in § 63.11422(f) or (i), you must prepare and, at all times, operate according to a fugitive dust mitigation plan that describes in detail the measures that will be put in place and implemented to control fugitive dust emissions in the lead oxide unloading and storage areas. You must prepare a fugitive dust mitigation plan according to the requirements in paragraphs (d)(1) and (2) of this section.
(1) You must submit the fugitive dust mitigation plan to the Administrator or delegated authority for review and approval when initially developed and any time changes are made.
(2) The fugitive dust mitigation plan must at a minimum include the requirements specified in paragraphs (d)(2)(i) through (iv) of this section.
(i) Cleaning lead oxide unloading and storage areas. Surfaces traversed during vehicular material transfer activity in lead oxide unloading and storage areas must be cleaned at least once per month, by wet wash or a vacuum equipped with a filter rated by the manufacturer to achieve 99.97 percent capture efficiency for 0.3 micron particles in a manner that does not generate fugitive lead dust, except when sand or a similar material has been spread on the area to provide traction on ice or snow.
(ii) Spills in lead oxide unloading and storage areas. For any leak or spill that occurs during the unloading and storage process, complete washing or vacuuming the area to remove all spilled or leaked lead bearing material within 2 hours of the leak or spill occurrence.
(iii) Materials storage. Dust forming materials (that contain lead or lead compounds) must be stored in sealed, leak-proof containers or in a total enclosure.
(iv) Records. The fugitive dust mitigation plan must specify that records be maintained of all cleaning performed under paragraph (d)(2)(i) and (ii) of this section.
(e) Beginning no later than the applicable compliance date specified in § 63.11422(g) or (i), you must meet the monitoring requirements in paragraphs (e)(1) through (5) of this section.
(1) For any emissions point controlled by a scrubbing system, you must install, calibrate, maintain, and operate a monitoring device(s) that measures and records the liquid flow rate and pressure drop across the scrubbing system(s) at least once every 15 minutes. The monitoring device must have an accuracy of ±5 percent over its operating range. The operating liquid flow rate must be maintained within ±10 percent of the average liquid flow rate during the most recent performance test. If a liquid flow rate or pressure drop is observed outside of the normal operational ranges as you must record the incident and take immediate corrective actions. You must also record the corrective actions taken. You must submit an excess emissions and continuous monitoring system performance report and summary report required under § 63.11424(c).
(2) Emissions points controlled by a fabric filter without a secondary filter must meet the requirements of paragraphs (e)(2)(i) and (ii) of this section and either paragraph (e)(2)(iii) or (iv) of this section.
(i) You must perform quarterly inspections and maintenance to ensure proper performance of each fabric filter. This includes inspection of structural and filter integrity.
(ii) If it is not possible for you to take the corrective actions specified in paragraph (e)(2)(iii)(C) or (D) of this section for a process or fabric filter control device, you must keep at least one replacement fabric filter onsite at all times for that process or fabric filter control device. The characteristics of the replacement filters must be the same as the current fabric filters in use or have characteristics that would achieve equal or greater emission reductions.
(iii) Install, maintain, and operate a pressure drop monitoring device to measure the differential pressure drop across the fabric filter during all times when the process is operating. The pressure drop must be recorded at least twice per day (at least 8 hours apart) if the results of the most recent performance test indicate that emissions are greater than 50 percent of the lead emissions limit in table 1 to this subpart. The pressure drop must be recorded at least once per day if the results of the most recent performance test indicate that emissions are less than or equal to 50 percent of the lead emissions limit in table 1. If a pressure drop is observed outside of the normal operational ranges, you must record the incident and take immediate corrective actions. You must submit an excess emissions and continuous monitoring system performance report and summary report required under § 63.11424(c). You must also record the corrective actions taken and verify pressure drop is within normal operational range. These corrective actions may include but are not limited to those provided in paragraphs (e)(2)(iii)(A) through (D) of this section.
(A) Inspecting the filter and filter housing for air leaks and torn or broken filters.
(B) Replacing defective filter media, or otherwise repairing the control device.
(C) Sealing off a defective control device by routing air to other control devices.
(D) Shutting down the process producing the lead emissions.
(iv) Conduct a visible emissions observation using EPA Method 9 or EPA Method 22 of appendix A to 40 CFR part 60 while the process is in operation to verify that no visible emissions are occurring at the discharge point to the atmosphere from any emissions source subject to the requirements of paragraph (a) of this section. The visible emissions observation must be conducted at least twice daily (at least 6 hours apart) if the results of the most recent performance test indicate that emissions are greater than 50 percent of the lead emissions limit in table 1 to this subpart. The visible emissions observation must be conducted at least once per day if the results of the most recent performance test indicate that emissions are less than or equal to 50 percent of the lead emissions limit in table 1. If visible emissions are detected, you must record the incident and submit this information in an excess emissions and continuous monitoring system performance report and summary report required under § 63.11424(c) and take immediate corrective action. You must also record the corrective actions taken. These corrective actions may include but are not limited to those provided in paragraphs (e)(2)(iii)(A) through (D) of this section.
(3) Emissions points controlled by a fabric filter equipped with a secondary filter, such as a HEPA filter, must meet the requirements of paragraphs (e)(3)(i) and (ii) of this section and either paragraph (e)(3)(iii) or (iv) of this section.
(i) You must perform the inspections required in paragraph (e)(2)(i) of this section quarterly.
(ii) If it is not possible for you to take the corrective actions specified in paragraph (e)(2)(iii)(C) or (D) of this section for a process or fabric filter control device, you must keep at least one replacement primary fabric filter and one replacement secondary filter onsite at all times for that process or fabric filter control device. The characteristics of the replacement filters must be the same as the current fabric filters in use or have characteristics that would achieve equal or greater emission reductions.
(iii) You must perform the pressure drop monitoring requirements in paragraph (e)(2)(iii) of this section. You may perform these requirements once weekly rather than once or twice daily.
(iv) You must perform the visible emissions observation requirements in paragraph (e)(2)(iv) of this section. You may perform these requirements weekly rather than once or twice daily.
(4) Beginning no later than the applicable compliance date specified in § 63.11422(g) or (i), if you operate a bag leak detection system, that system must meet the specifications and requirements in paragraphs (e)(4)(i) through (ix) of this section. Emission points controlled by a fabric filter equipped that are monitored with a bag leak detection system meeting the specifications and requirements in paragraphs (e)(4)(i) through (ix) of this section may have the inspections required in paragraph (e)(2)(i) of this section performed semiannually.
(i) The bag leak detection system must be certified by the manufacturer to be capable of detecting particulate matter as lead emissions at concentrations at or below the values in table 1 to this subpart, as applicable to the process for which the fabric filter is used to control emissions. Where the fabric filter is used as a control device for more than one process, the lowest applicable value in table 1 must be used.
(ii) The bag leak detection system sensor must provide output of relative particulate matter loadings.
(iii) The bag leak detection system must be equipped with an alarm system that will alarm when an increase in relative particulate loadings is detected over a preset level.
(iv) You must install and operate the bag leak detection system in a manner consistent with the guidance provided in “Office of Air Quality Planning and Standards (OAQPS) Fabric Filter Bag Leak Detection Guidance” (EPA-454/R-98-015) (incorporated by reference, see § 63.14) and the manufacturer's written specifications and recommendations for installation, operation, and adjustment of the system.
(v) The initial adjustment of the system must, at a minimum, consist of establishing the baseline output by adjusting the sensitivity (range) and the averaging period of the device and establishing the alarm set points and the alarm delay time.
(vi) Following initial adjustment, you must not adjust the sensitivity or range, averaging period, alarm set points, or alarm delay time, except as detailed in the approved standard operating procedures manual required under paragraph (e)(4)(ix) of this section. You cannot increase the sensitivity by more than 100 percent or decrease the sensitivity by more than 50 percent over a 365-day period unless such adjustment follows a complete fabric filter inspection that demonstrates that the fabric filter is in good operating condition.
(vii) For negative pressure, induced air baghouses, and positive pressure baghouses that are discharged to the atmosphere through a stack, you must install the bag leak detector downstream of the fabric filter.
(viii) Where multiple detectors are required, the system's instrumentation and alarm may be shared among detectors.
(ix) You must develop a standard operating procedures manual for the bag leak detection system that includes procedures for making system adjustments and a corrective action plan, which specifies the procedures to be followed in the case of a bag leak detection system alarm. The corrective action plan must include, at a minimum, the procedures that you will use to determine and record the time and cause of the alarm as well as the corrective actions taken to minimize emissions as specified in paragraphs (e)(4)(ix)(A) and (B) of this section.
(A) The procedures used to determine the cause of the alarm must be initiated within 30 minutes of the alarm.
(B) The cause of the alarm must be alleviated by taking the necessary corrective action(s) that may include, but not be limited to, those listed in paragraphs (e)(4)(ix)(B)(1) through (6) of this section.
(1) Inspecting the baghouse for air leaks, torn or broken filter elements, or any other malfunction that may cause an increase in emissions.
(2) Sealing off defective bags or filter media.
(3) Replacing defective bags or filter media, or otherwise repairing the control device.
(4) Sealing off defective baghouse compartment.
(5) Cleaning the bag leak detection system probe, or otherwise repairing the bag leak detection system.
(6) Shutting down the process producing the lead emissions.
(5) For continuous monitoring subject to the requirements of § 63.8(d)(2) to develop and implement a continuous monitoring system quality control program, you must keep these written procedures on record for the life of the affected source or until the affected source is no longer subject to the provisions of this part, to be made available for inspection, upon request, by the Administrator. If the performance evaluation plan is revised, you must keep previous (i.e., superseded) versions of the performance evaluation plan on record to be made available for inspection, upon request, by the Administrator, for a period of 5 years after each revision to the plan. The program of corrective action should be included in the plan required under § 63.8(d)(2).
[88 FR 11590, Feb. 23, 2023]