Part 119 - Machinery Installation  


Subpart A - General Provisions
§ 119.100 - Intent; preemptive effect.
§ 119.115 - Applicability to existing vessels.
Subpart B - Propulsion Machinery
§ 119.200 - General.
§ 119.220 - Installations.
Subpart C - Auxiliary Machinery
§ 119.310 - Installations.
§ 119.320 - Water heaters.
§ 119.330 - Pressure vessels.
Subpart D - Specific Machinery Requirements
§ 119.400 - Applicability.
§ 119.405 - Fuel restrictions.
§ 119.410 - General requirements.
§ 119.420 - Engine cooling.
§ 119.422 - Integral and non-integral keel cooler installations.
§ 119.425 - Engine exhaust cooling.
§ 119.430 - Engine exhaust pipe installation.
§ 119.435 - Integral fuel tanks.
§ 119.440 - Independent fuel tanks.
§ 119.445 - Fill and sounding pipes for fuel tanks.
§ 119.450 - Vent pipes for fuel tanks.
§ 119.455 - Fuel piping.
§ 119.458 - Portable fuel systems.
§ 119.465 - Ventilation of spaces containing diesel machinery.
§ 119.470 - Ventilation of spaces containing diesel fuel tanks.
Subpart E - Bilge and Ballast Systems
§ 119.500 - General.
§ 119.510 - Bilge piping system.
§ 119.520 - Bilge pumps.
§ 119.530 - Bilge high level alarms.
§ 119.540 - Ballast systems.
Subpart F - Steering Systems
§ 119.600 - General.
Subpart G - Piping Systems
§ 119.700 - General.
§ 119.710 - Piping for vital systems.
§ 119.715 - Piping subject to more than 1,034 kPa (150 psig) in non-vital systems.
§ 119.720 - Nonmetallic piping materials.
§ 119.730 - Nonferrous metallic piping materials.