Part 39 - Vapor Control Systems  


Subpart 39.10 - General
§ 39.10-1 - Applicability—TB/ALL.
§ 39.10-3 - Definitions—TB/ALL.
§ 39.10-5 - Incorporation by reference—TB/ALL.
§ 39.10-9 - Vessel vapor processing unit—TB/ALL.
§ 39.10-11 - Personnel training—TB/ALL.
§ 39.10-13 - Submission of vapor control system designs—TB/ALL.
Subpart 39.20 - Design and Equipment
§ 39.20-1 - Vapor collection system—TB/ALL.
§ 39.20-3 - Cargo gauging system—TB/ALL.
§ 39.20-7 - Tankship liquid overfill protection—T/ALL.
§ 39.20-9 - Tank barge liquid overfill protection—B/ALL.
§ 39.20-11 - Vapor overpressure and vacuum protection—TB/ALL.
§ 39.20-13 - High and low vapor pressure protection for tankships—T/ALL.
Subpart 39.30 - Operations
§ 39.30-1 - Operational requirements—TB/ALL.
Subpart 39.40 - Lightering and Topping-Off Operations with Vapor Balancing
§ 39.40-1 - General requirements for vapor balancing-TB/ALL.
§ 39.40-3 - Design and equipment for vapor balancing—TB/ALL.
§ 39.40-5 - Operational requirements for vapor balancing—TB/ALL.
Subpart 39.1000 - General
§ 39.1001 - Applicability - TB/ALL.
§ 39.1003 - Definitions - TB/ALL.
§ 39.1005 - Incorporation by reference - TB/ALL.
§ 39.1009 - Additional tank vessel vapor processing unit requirements - TB/ALL.
§ 39.1011 - Personnel training requirements - TB/ALL.
§ 39.1013 - U.S.-flagged tank vessel certification procedures for vapor control system designs - TB/ALL.
§ 39.1015 - Foreign-flagged tank vessel certification procedures for vapor control system designs - TB/ALL.
§ 39.1017 - Additional certification procedures for a tank barge vapor collection system design - B/ALL.
Subpart 39.2000 - Equipment and Installation
§ 39.2001 - Vapor collection system - TB/ALL.
§ 39.2003 - Cargo gauging system - TB/ALL.
§ 39.2007 - Tankship liquid overfill protection - T/ALL.
§ 39.2009 - Tank barge liquid overfill protection - B/ALL.
§ 39.2011 - Vapor overpressure and vacuum protection - TB/ALL.
§ 39.2013 - High and low vapor pressure protection for tankships - T/ALL.
§ 39.2014 - Polymerizing cargoes safety - TB/ALL.
§ 39.2015 - Tank barge pressure-vacuum indicating device - B/ALL.
Subpart 39.3000 - Vapor Collection Operations During Cargo Transfer
§ 39.3001 - Operational requirements for vapor control systems during cargo transfer - TB/ALL.
Subpart 39.4000 - Vessel-to-Vessel Transfers Using Vapor Balancing
§ 39.4001 - General requirements for vapor balancing - TB/ALL.
§ 39.4003 - Design and equipment for vapor balancing - TB/ALL.
§ 39.4005 - Operational requirements for vapor balancing - TB/ALL.
Subpart 39.5000 - Multi-breasted Loading Using a Single Facility Vapor Connection
§ 39.5001 - General requirements for multi-breasted loading - B/CLBR.
§ 39.5003 - Additional requirements for multi-breasted loading using an inboard barge vapor collection system - B/CLBR.
§ 39.5005 - Additional requirements for multi-breasted loading using a “dummy” vapor header - B/CLBR.
Subpart 39.6000 - Tank Barge Cleaning Operations with Vapor Collection
§ 39.6001 - Design and equipment of vapor collection and stripping systems - B/ALL.
§ 39.6003 - Overpressure and underpressure protection during stripping or gas-freeing operations - B/ALL.
§ 39.6005 - Inspection prior to conducting gas-freeing operations - B/ALL.
§ 39.6007 - Operational requirements for tank barge cleaning - B/ALL.
§ 39.6009 - Barge person in charge: Designation and qualifications - B/ALL.