§ 25.149 - Application requirements for ancillary terrestrial components in Mobile-Satellite Service networks operating in the 1.5./1.6 GHz and 1.6/2.4 GHz Mobile-Satellite Service.


Latest version.
  • § 25.149 Application requirements for ancillary terrestrial components in Mobile-Satellite Service networks operating in the 1.5./1.6 GHz and 1.6/2.4 GHz Mobile-Satellite Service.

    (a) Applicants for ancillary terrestrial component authority shall demonstrate that the applicant does or will comply with the following through certification or explanatory technical exhibit, as appropriate:

    (1) ATC shall be deployed in the forward-band mode of operation whereby the ATC mobile terminals transmit in the MSS uplink bands and the ATC base stations transmit in the MSS downlink bands in portions of the 1626.5-1660.5 MHz/1525-1559 MHz bands (L-band) and the 1610-1626.5 MHz/2483.5-2500 MHz bands.

    Note to paragraph (a)(1):

    An L-band MSS licensee is permitted to apply for ATC authorization based on a non-forward-band mode of operation provided it is able to demonstrate that the use of a non-forward-band mode of operation would produce no greater potential interference than that produced as a result of implementing the rules of this section. A 1.6/2.4 GHz band licensee is permitted to apply for ATC authorization on a non-forward-band mode of operation where the equipment deployed will meet the requirements of paragraph (c)(4) of this section.

    (2) ATC operations shall be limited to certain frequencies:

    (i) [Reserved]

    (ii) In the 1626.5-1660.5 MHz/1525-1559 MHz bands (L-band), ATC operations are limited to the frequency assignments authorized and internationally coordinated for the MSS system of the MSS licensee that seeks ATC authority.

    (iii) In the 1610-1626.5 MHz/2483.5-2500 MHz bands, ATC operations are limited to the 1610-1617.775 MHz, 1621.35-1626.5 MHz, and 2483.5-2495 MHz bands and to the specific frequencies authorized for use by the MSS licensee that seeks ATC authority.

    (3) ATC operations shall not exceed the geographical coverage area of the Mobile-Satellite Service network of the applicant for ATC authority.

    (4) ATC base stations shall comply with all applicable antenna and structural clearance requirements established in part 17 of this chapter.

    (5) ATC base stations and mobile terminals shall comply with part 1 of this chapter, Subpart I - Procedures Implementing the National Environmental Policy Act of 1969, including the guidelines for human exposure to radio frequency electromagnetic fields as defined in §§ 1.1307(b) and 1.1310 of this chapter for PCS networks.

    (6) ATC base station operations shall use less than all available MSS frequencies when using all available frequencies for ATC base station operations would exclude otherwise available signals from MSS space-stations.

    (b) Applicants for an ancillary terrestrial component shall demonstrate that the applicant does or will comply with the following criteria through certification:

    (1) Geographic and temporal coverage.

    (i) [Reserved]

    (ii) For the L-band, an applicant must demonstrate that it can provide space-segment service covering all 50 states, Puerto Rico, and the U.S. Virgin Islands one-hundred percent of the time, unless it is not technically possible for the MSS operator to meet the coverage criteria from its orbital position.

    (iii) For the 1.6/2.4 GHz Mobile-Satellite Service bands, an applicant must demonstrate that it can provide space-segment service to all locations as far north as 70° North latitude and as far south as 55° South latitude for at least seventy-five percent of every 24-hour period, i.e., that at least one satellite will be visible above the horizon at an elevation angle of at least 5° for at least 18 hours each day, and on a continuous basis throughout the fifty states, Puerto Rico and the U.S. Virgin Islands, i.e., that at least one satellite will be visible above the horizon at an elevation angle of at least 5° at all times.

    (2) Replacement satellites.

    (i) Operational NGSO MSS ATC systems shall maintain an in-orbit spare satellite.

    (ii) Operational GSO MSS ATC systems shall maintain a spare satellite on the ground within one year of commencing operations and launch it into orbit during the next commercially reasonable launch window following a satellite failure.

    (iii) All MSS ATC licensees must report any satellite failures, malfunctions or outages that may require satellite replacement within ten days of their occurrence.

    (3) Commercial availability. Mobile-satellite service must be commercially available (viz., offering services for a fee) in accordance with the coverage requirements that pertain to each band as a prerequisite to an MSS licensee's offering ATC service.

    (4) Integrated services. MSS ATC licensees shall offer an integrated service of MSS and MSS ATC. Applicants for MSS ATC may establish an integrated service offering by affirmatively demonstrating that:

    (i) The MSS ATC operator will use a dual-mode handset that can communicate with both the MSS network and the MSS ATC component to provide the proposed ATC service; or

    (ii) Other evidence establishing that the MSS ATC operator will provide an integrated service offering to the public.

    (5) In-band operation.

    (i) [Reserved]

    (ii) In the 1.6/2.4 GHz Mobile-Satellite Service bands, MSS ATC is limited to no more than 7.775 MHz of spectrum in the L-band and 11.5 MHz of spectrum in the S-band. Licensees in these bands may implement ATC only on those channels on which MSS is authorized, consistent with the 1.6/2.4 GHz Mobile-Satellite Service band-sharing arrangement.

    (iii) In the L-band, MSS ATC is limited to those frequency assignments available for MSS use in accordance with the Mexico City Memorandum of Understanding, its successor agreements or the result of other organized efforts of international coordination.

    (c) Equipment certification.

    (1) Each ATC mobile station utilized for operation under this part and each transmitter marketed, as set forth in § 2.803 of this chapter, must be of a type that has been authorized by the Commission under its certification procedure for use under this part.

    (2) Any manufacturer of radio transmitting equipment to be used in these services may request equipment authorization following the procedures set forth in subpart J of part 2 of this chapter. Equipment authorization for an individual transmitter may be requested by an applicant for a station authorization by following the procedures set forth in part 2 of this chapter.

    (3) Licensees and manufacturers are subject to the radiofrequency radiation shall ensure compliance with the Commission's radio frequency exposure requirements specified in §§ 1.1307(b), 2.1091, and 2.1093 of this chapter, as appropriate. ATC base stations must comply with the requirements specified in § 1.1307(b) of this chapter for PCS base stations. ATC mobile stations must comply with the requirements specified for mobile and portable PCS transmitting devices in § 1.1307(b) of this chapter. ATC mobile terminals must also comply with the requirements in §§ 2.1091 and 2.1093 of this chapter for Satellite Communications Services devices. An Environmental Assessment may be required if RF radiation from the proposed facilities would, in combination with radiation from other sources, cause RF power density or field strength in an accessible area to exceed the applicable limits specified in § 1.1310 of this chapter. Applications for equipment authorization of ATC mobile or portable devices operating under this section must contain a statement confirming compliance with these requirements for both fundamental emissions and unwanted emissions. Technical information showing the basis for this statement must be submitted to the Commission upon request.

    (4) Applications for equipment authorization of terrestrial low-power system equipment that will operate in the 2483.5-2495 MHz band shall demonstrate the following:

    (i) The transmitted signal is digitally modulated;

    (ii) The 6 dB bandwidth is at least 500 kHz;

    (iii) The maximum transmit power is no more than 1 W with a peak EIRP of no more than 6 dBW;

    (iv) The maximum power spectral density conducted to the antenna is not greater than 8 dBm in any 3 kHz band during any time interval of continuous transmission;

    (v) Emissions below 2483.5 MHz are attenuated below the transmitter power (P) measured in watts by a factor of at least 40 + 10 log (P) dB at the channel edge at 2483.5 MHz, 43 + 10 log (P) dB at 5 MHz from the channel edge, and 55 + 10 log (P) dB at X MHz from the channel edge where X is the greater of 6 MHz or the actual emission bandwidth.

    (vi) Emissions above 2495 MHz are attenuated below the transmitter power (P) measured in watts by a factor of at least 43 + 10 log (P) dB on all frequencies between the channel edge at 2495 MHz and X MHz from this channel edge and 55 + 10 log (P) dB on all frequencies more than X MHz from this channel edge, where X is the greater of 6 MHz or the actual emission bandwidth;

    (vii) Compliance with these rules is based on the use of measurement instrumentation employing a resolution bandwidth of 1 MHz or greater. However, in the 1 MHz bands immediately above and adjacent to the 2495 MHz a resolution bandwidth of at least 1 percent of the emission bandwidth of the fundamental emission of the transmitter may be employed. If 1 percent of the emission bandwidth of the fundamental emission is less than 1 MHz, the power measured must be integrated over the required measurement bandwidth of 1 MHz. A resolution bandwidth narrower than 1 MHz is permitted to improve measurement accuracy, provided the measured power is integrated over the full required measurement bandwidth (i.e., 1 MHz). The emission bandwidth of the fundamental emission of a transmitter is defined as the width of the signal between two points, one below the carrier center frequency and one above the carrier center frequency, outside of which all emissions are attenuated at least 26 dB below the transmitter power. When an emission outside of the authorized bandwidth causes harmful interference, the Commission may, at its discretion, require greater attenuation than specified in this section; and

    Note to paragraph (c)(4):

    Systems meeting the requirements set forth in this section are deemed to have also met the requirements of § 25.254(a) through (d). No further demonstration is needed for these systems with respect to § 25.254(a)-(d).

    (d) Applicants for an ancillary terrestrial component authority shall demonstrate that the applicant does or will comply with the provisions of § 1.924 of this chapter and §§ 25.203(e) through 25.203(g) and with § 25.253 or § 25.254, as appropriate, through certification or explanatory technical exhibit.

    (e) Except as provided for in paragraphs (f) and (g) of this section, no application for an ancillary terrestrial component shall be granted until the applicant has demonstrated actual compliance with the provisions of paragraph (b) of this section. Upon receipt of ATC authority, all ATC licensees shall ensure continued compliance with this section and § 25.253 or § 25.254, as appropriate.

    (f) Special provision for operational MSS systems. Applicants for MSS ATC authority with operational MSS systems that are in actual compliance with the requirements prescribed in paragraphs (b)(1), (b)(2), and (b)(3) of this section at the time of application may elect to satisfy the requirements of paragraphs (b)(4) and (b)(5) of this section prospectively by providing a substantial showing in its certification regarding how the applicant will comply with the requirements of paragraphs (b)(4) and (b)(5) of this section. Notwithstanding § 25.117(f) and paragraph (e) of this section, the Commission may grant an application for ATC authority based on such a prospective substantial showing if the Commission finds that operations consistent with the substantial showing will result in actual compliance with the requirements prescribed in paragraphs (b)(4) and (b)(5) of this section. An MSS ATC applicant that receives a grant of ATC authority pursuant to this paragraph (f) shall notify the Commission within 30 days once it begins providing ATC service. This notification must take the form of a letter formally filed with the Commission in the appropriate MSS license docket and shall contain a certification that the MSS ATC service is consistent with its ATC authority.

    (g) Special provisions for terrestrial low-power systems in the 2483.5-2495 MHz band.

    (1) An operational MSS system that applies for authority to deploy ATC in the 2483.5-2495 MHz band for terrestrial low-power operations satisfying the equipment certification requirements of paragraph (c)(4) of this section is not required to demonstrate compliance with paragraph (b) of this section, except to demonstrate the commercial availability of MSS, without regard to coverage requirements.

    (2) An ATC licensee seeking to modify its license to add authority to operate a terrestrial low-power network shall certify in its modification application that its operations will utilize a Network Operating System (NOS), consisting of a network management system located at an operations center or centers. The NOS shall have the technical capability to address and resolve interference issues related to the licensee's network operations by reducing operational power; adjusting operational frequencies; shutting off operations; or any other appropriate means. The NOS shall also have the ability to resolve interference from the terrestrial low-power network to the licensee's MSS operations and to authorize access points to the network, which in turn may authorize access to the network by end-user devices. The NOS operations center shall have a point of contact in the United States available 24 hours a day, seven days a week, with a phone number and address made publicly-available by the licensee.

    (3) All access points operating in the 2483.5-2495 MHz band shall only operate when authorized by the ATC licensee's NOS, and all client devices operating in the 2483.5-2495 MHz band shall only operate when under the control of such access points.

    (h) Spectrum leasing. Leasing of spectrum rights by MSS licensees or system operators to spectrum lessees for ATC use is subject to the rules for spectrum manager leasing arrangements (see § 1.9020) as set forth in part 1, subpart X of the rules (see § 1.9001 et seq.). In addition, at the time of the filing of the requisite notification of a spectrum manager leasing arrangement using Form 608 (see §§ 1.9020(e) and 1.913(a)(5)), both parties to the proposed arrangement must have a complete and accurate Form 602 (see § 1.913(a)(2)) on file with the Commission.

    [68 FR 47859, Aug. 12, 2003, as amended at 69 FR 48162, Aug. 9, 2004; 70 FR 19318, Apr. 13, 2005, 73 FR 25592, May 7, 2008; 76 FR 31260, May 31, 2011; 78 FR 8267, Feb. 5, 2013; 78 FR 8424, Feb. 6, 2013; 79 FR 27502, May 14, 2014; 82 FR 8818, Jan. 31, 2017; 85 FR 18150, Apr. 1, 2020]