§ 80.130 - RINs for renewable CNG/LNG from a biogas closed distribution system.  


Latest version.
  • § 80.130 RINs for renewable CNG/LNG from a biogas closed distribution system.

    (a) General requirements.

    (1) Any party that generates, assigns, separates, or retires RINs for renewable CNG/LNG from a biogas closed distribution system must comply with the requirements of this section.

    (2) Parties must report all RIN transactions to EMTS as specified in § 80.1452.

    (b) RIN generation.

    (1) Biogas closed distribution system RIN generators must generate RINs using the applicable requirements for RIN generation in under this part.

    (2) RINs for renewable CNG/LNG from a biogas closed distribution system may be generated if all the following requirements are met:

    (i) The renewable CNG/LNG is produced from renewable biomass and qualifies to generate RINs under an approved pathway.

    (ii) The biogas closed distribution system RIN generator has entered into a written contract for the sale or use of a specific quantity of renewable CNG/LNG for use as transportation fuel, and has obtained affidavits from all parties selling or using the renewable CNG/LNG certifying that the renewable CNG/LNG was used as transportation fuel.

    (iii) The renewable CNG/LNG is used as transportation fuel and for no other purpose.

    (c) RIN separation. A biogas closed distribution system RIN generator must separate RINs generated for renewable CNG/LNG under § 80.1429(b)(5)(ii).

    (d) RIN retirement. A party must retire RINs generated for renewable CNG/LNG from a biogas closed distribution if any of the conditions specified in § 80.1434(a) apply and must comply with § 80.1434(b).