§ 816.62 - Use of explosives: Preblasting survey.  


Latest version.
  • § 816.62 Use of explosives: Preblasting survey.

    (a) At least 30 days before initiation of blasting, you must the operator shall notify, in writing, all residents or owners of dwellings or other structures located within 12 mile of the permit area how to request a preblasting survey.

    (b)

    (1)

    A resident or owner of a dwelling or structure within 12 mile of any part of the permit area may request a preblasting survey. This request

    must

    shall be made, in writing, directly to

    you

    the operator or to the regulatory authority

    . If the request is made to the regulatory authority, the regulatory authority will promptly notify you. (2) You must

    , who shall promptly notify the operator. The operator shall promptly conduct a preblasting survey of the dwelling or structure and promptly prepare a written report of the survey.

    (3) You must conduct an

    An updated survey of any

    subsequent

    additions, modifications, or renovations

    to the dwelling or structure,

    shall be performed by the operator if requested by the resident or owner.

    (c) You must The operator shall determine the condition of the dwelling or structure and shall document any preblasting damage and other physical factors that could reasonably be affected by the blasting. Structures such as pipelines, cables, transmission lines, and cisterns, wells, and other water systems warrant special attention; however, the assessment of these structures may be limited to surface conditions and other readily available data.

    (d)

    (1) The

    The written report of the survey shall be signed by the person who conducted the survey

    must sign the written report of the survey. (2) You must promptly provide copies

    . Copies of the report shall be promptly provided to the regulatory authority and to the person requesting the survey.

    (3)

    If the person requesting the survey disagrees with the contents and/or recommendations

    of the survey

    contained therein, he or she may submit to both the operator and the regulatory authority a detailed description of the specific areas of disagreement

    to both you and the regulatory authority

    .

    (e) You must complete any Any surveys requested more than 10 days before the planned initiation of blasting shall be completed by the operator before the initiation of blasting.

    [48 FR 9807, Mar. 8, 1983, as amended at 81 FR 93392, Dec. 20, 2016; 82 FR 54979, Nov. 17, 2017]