Part 816 - Permanent Program Performance Standards - Surface Mining Activities  


§ 816.1 - Scope.
§ 816.2 - Objectives.
§ 816.10 - Information collection.
§ 816.11 - Signs and markers.
§ 816.13 - Casing and sealing of drilled holes: General requirements.
§ 816.14 - Casing and sealing of drilled holes: Temporary.
§ 816.15 - Casing and sealing of drilled holes: Permanent.
§ 816.22 - Topsoil and subsoil.
§ 816.34 - How must I protect the hydrologic balance?
§ 816.35 - How must I monitor groundwater?
§ 816.36 - How must I monitor surface water?
§ 816.37 - How must I monitor the biological condition of streams?
§ 816.38 - How must I handle acid-forming and toxic-forming materials?
§ 816.39 - What must I do with exploratory or monitoring wells when I no longer need them?
§ 816.40 - What responsibility do I have to replace water supplies?
§ 816.41 - Hydrologic-balance protection.
§ 816.42 - Hydrologic balance: Water quality standards and effluent limitations.
§ 816.43 - Diversions.
§ 816.45 - Hydrologic balance: Sediment control measures.
§ 816.46 - Hydrologic balance: Siltation structures.
§ 816.47 - Hydrologic balance: Discharge structures.
§ 816.49 - Impoundments.
§ 816.55 - What must I do with sedimentation ponds, diversions, impoundments, and treatment facilities after I no longer need them?
§ 816.56 - Postmining rehabilitation of sedimentation ponds, diversions, impoundments, and treatment facilities.
§ 816.57 - Hydrologic balance: Stream buffer zones.
§ 816.59 - Coal recovery.
§ 816.61 - Use of explosives: General requirements.
§ 816.62 - Use of explosives: Preblasting survey.
§ 816.64 - Use of explosives: Blasting schedule.
§ 816.66 - Use of explosives: Blasting signs, warnings, and access control.
§ 816.67 - Use of explosives: Control of adverse effects.
§ 816.68 - Use of explosives: Records of blasting operations.
§ 816.71 - Disposal of excess spoil: General requirements.
§ 816.72 - Disposal of excess spoil: Valley fills/head-of-hollow fills.
§ 816.73 - Disposal of excess spoil: Durable rock fills.
§ 816.74 - Disposal of excess spoil: Preexisting benches.
§ 816.79 - Protection of underground mining.
§ 816.81 - Coal mine waste: General requirements.
§ 816.83 - Coal mine waste: Refuse piles.
§ 816.84 - Coal mine waste: Impounding structures.
§ 816.87 - Coal mine waste: Burning and burned waste utilization.
§ 816.89 - Disposal of noncoal mine wastes.
§ 816.95 - Stabilization of surface areas.
§ 816.97 - Protection of fish, wildlife, and related environmental values.
§ 816.99 - Slides and other damage.
§ 816.100 - Contemporaneous reclamation.
§ 816.101 - Backfilling and grading: Time and distance requirements.
§ 816.102 - Backfilling and grading: General requirements.
§ 816.104 - Backfilling and grading: Thin overburden.
§ 816.105 - Backfilling and grading: Thick overburden.
§ 816.106 - Backfilling and grading: Previously mined areas.
§ 816.107 - Backfilling and grading: Steep slopes.
§ 816.111 - Revegetation: General requirements.
§ 816.113 - Revegetation: Timing.
§ 816.114 - Revegetation: Mulching and other soil stabilizing practices.
§ 816.115 - How long am I responsible for revegetation after planting?
§ 816.116 - Revegetation: Standards for success.
§ 816.131 - Cessation of operations: Temporary.
§ 816.132 - Cessation of operations: Permanent.
§ 816.133 - Postmining land use.
§ 816.150 - Roads: general.
§ 816.151 - Primary roads.
§ 816.180 - Utility installations.
§ 816.181 - Support facilities.
§ 816.200 - Interpretative rules related to general performance standards.
§§ 816.72--816.73 - [Reserved]
§§ 816.113--816.114 - [Reserved]
§§ 816.14--816.15 - [Reserved]