Code of Federal Regulations (Last Updated: November 8, 2024) |
Title 30 - Mineral Resources |
Chapter VII - Office of Surface Mining Reclamation and Enforcement, Department of the Interior |
SubChapter K - Permanent Program Performance Standards |
Part 817 - Permanent Program Performance Standards - Underground Mining Activities |
§ 817.1 - Scope. |
§ 817.2 - Objectives. |
§ 817.10 - Information collection. |
§ 817.11 - Signs and markers. |
§ 817.13 - Casing and sealing of exposed underground openings: General requirements. |
§ 817.14 - Casing and sealing of underground openings: Temporary. |
§ 817.15 - Casing and sealing of underground openings: Permanent. |
§ 817.22 - Topsoil and subsoil. |
§ 817.34 - How must I protect the hydrologic balance? |
§ 817.35 - How must I monitor groundwater? |
§ 817.36 - How must I monitor surface water? |
§ 817.37 - How must I monitor the biological condition of streams? |
§ 817.38 - How must I handle acid-forming and toxic-forming materials? |
§ 817.39 - What must I do with exploratory or monitoring wells when I no longer need them? |
§ 817.40 - What responsibility do I have to replace water supplies? |
§ 817.41 - Hydrologic-balance protection. |
§ 817.42 - Hydrologic balance: Water quality standards and effluent limitations. |
§ 817.43 - Diversions. |
§ 817.44 - What restrictions apply to gravity discharges from underground mines? |
§ 817.45 - Hydrologic balance: Sediment control measures. |
§ 817.46 - Hydrologic balance: Siltation structures. |
§ 817.47 - Hydrologic balance: Discharge structures. |
§ 817.49 - Impoundments. |
§ 817.55 - What must I do with sedimentation ponds, diversions, impoundments, and treatment facilities after I no longer need them? |
§ 817.56 - Postmining rehabilitation of sedimentation ponds, diversions, impoundments, and treatment facilities. |
§ 817.57 - Hydrologic balance: Stream buffer zones. |
§ 817.59 - Coal recovery. |
§ 817.61 - Use of explosives: General requirements. |
§ 817.62 - Use of explosives: Preblasting survey. |
§ 817.64 - Use of explosives: General performance standards. |
§ 817.66 - Use of explosives: Blasting signs, warnings, and access control. |
§ 817.67 - Use of explosives: Control of adverse effects. |
§ 817.68 - Use of explosives: Records of blasting operations. |
§ 817.71 - Disposal of excess spoil: General requirements. |
§ 817.72 - Disposal of excess spoil: Valley fill/head-of-hollow fills. |
§ 817.73 - Disposal of excess spoil: Durable rock fills. |
§ 817.74 - Disposal of excess spoil: Preexisting benches. |
§ 817.81 - Coal mine waste: General requirements. |
§ 817.83 - Coal mine waste: Refuse piles. |
§ 817.84 - Coal mine waste: Impounding structures. |
§ 817.87 - Coal mine waste: Burning and burned waste utilization. |
§ 817.89 - Disposal of noncoal mine wastes. |
§ 817.95 - Stabilization of surface areas. |
§ 817.97 - Protection of fish, wildlife, and related environmental values. |
§ 817.99 - Slides and other damage. |
§ 817.100 - Contemporaneous reclamation. |
§ 817.102 - Backfilling and grading: General requirements. |
§ 817.106 - Backfilling and grading: Previously mined areas. |
§ 817.107 - Backfilling and grading: Steep slopes. |
§ 817.111 - Revegetation: General requirements. |
§ 817.113 - Revegetation: Timing. |
§ 817.114 - Revegetation: Mulching and other soil stabilizing practices. |
§ 817.115 - How long am I responsible for revegetation after planting? |
§ 817.116 - Revegetation: Standards for success. |
§ 817.121 - Subsidence control. |
§ 817.122 - Subsidence control: Public notice. |
§ 817.131 - Cessation of operations: Temporary. |
§ 817.132 - Cessation of operations: Permanent. |
§ 817.133 - Postmining land use. |
§ 817.150 - Roads: General. |
§ 817.151 - Primary roads. |
§ 817.180 - Utility installations. |
§ 817.181 - Support facilities. |
§ 817.200 - Interpretative rules related to general performance standards. |
§§ 817.72--817.73 - [Reserved] |
§§ 817.113--817.114 - [Reserved] |
§§ 817.14--817.15 - [Reserved] |