§ 817.122 - Subsidence control: Public notice.  


Latest version.
  • § 817.122 How and when must I provide notice of planned underground mining?

    (a)

    Subsidence control: Public notice.

    At least 6 months prior to mining, or within that period if approved by the regulatory authority,

    you,

    the underground mine operator

    , must

    shall mail a notification to all owners and occupants of surface property and structures above the

    planned

    underground workings.

    (b)

    The notification

    must

    shall include, at a minimum

    - (1) Identification

    , identification of specific areas in which mining will take place

    ; (2) Dates

    , dates that specific areas will be undermined

    ; and (3) The

    , and the location or locations where the operator's subsidence control plan may be examined.

    [48 FR 24652, June 1, 1983, as amended at 81 FR 93418, Dec. 20, 2016; 82 FR 54999, Nov. 17, 2017]