Subpart CCCC - Standards of Performance for Commercial and Industrial Solid Waste Incineration Units  


Operator Training and Qualification
§ 60.2070 - What are the operator training and qualification requirements?
§ 60.2075 - When must the operator training course be completed?
§ 60.2080 - How do I obtain my operator qualification?
§ 60.2085 - How do I maintain my operator qualification?
§ 60.2090 - How do I renew my lapsed operator qualification?
§ 60.2095 - What site-specific documentation is required?
§ 60.2100 - What if all the qualified operators are temporarily not accessible?
Recordkeeping and Reporting
§ 60.2175 - What records must I keep?
§ 60.2180 - Where and in what format must I keep my records?
§ 60.2185 - What reports must I submit?
§ 60.2190 - What must I submit prior to commencing construction?
§ 60.2195 - What information must I submit prior to initial startup?
§ 60.2200 - What information must I submit following my initial performance test?
§ 60.2205 - When must I submit my annual report?
§ 60.2210 - What information must I include in my annual report?
§ 60.2215 - What else must I report if I have a deviation from the operating limits or the emission limitations?
§ 60.2220 - What must I include in the deviation report?
§ 60.2225 - What else must I report if I have a deviation from the requirement to have a qualified operator accessible?
§ 60.2230 - Are there any other notifications or reports that I must submit?
§ 60.2235 - In what form can I submit my reports?
§ 60.2240 - Can reporting dates be changed?
Continuous Compliance Requirements
§ 60.2145 - How do I demonstrate continuous compliance with the emission limitations and the operating limits?
§ 60.2150 - By what date must I conduct the annual performance test?
§ 60.2151 - By what date must I conduct the annual air pollution control device inspection?
§ 60.2155 - May I conduct performance testing less often?
§ 60.2160 - May I conduct a repeat performance test to establish new operating limits?
Air Curtain Incinerators (Acis)
§ 60.2245 - What is an air curtain incinerator?
§ 60.2250 - What are the emission limitations for air curtain incinerators?
§ 60.2255 - How must I monitor opacity for air curtain incinerators?
§ 60.2260 - What are the recordkeeping and reporting requirements for air curtain incinerators?
Applicability
§ 60.2010 - Does this subpart apply to my incineration unit?
§ 60.2015 - What is a new incineration unit?
§ 60.2020 - What combustion units are exempt from this subpart?
§ 60.2025 - What if my chemical recovery unit is not listed in 60.2020(n)?
§ 60.2030 - Who implements and enforces this subpart?
§ 60.2035 - How are these new source performance standards structured?
§ 60.2040 - Do all eleven components of these new source performance standards apply at the same time?
Introduction
§ 60.2000 - What does this subpart do?
§ 60.2005 - When did this subpart become effective?
Air Curtain Incinerators
Definitions
§ 60.2265 - What definitions must I know?
Monitoring
§ 60.2165 - What monitoring equipment must I install and what parameters must I monitor?
§ 60.2170 - Is there a minimum amount of monitoring data I must obtain?
Waste Management Plan
§ 60.2055 - What is a waste management plan?
§ 60.2060 - When must I submit my waste management plan?
§ 60.2065 - What should I include in my waste management plan?
Performance Testing
§ 60.2125 - How do I conduct the initial and annual performance test?
§ 60.2130 - How are the performance test data used?
Emission Limitations and Operating Limits
§ 60.2105 - What emission limitations must I meet and by when?
§ 60.2110 - What operating limits must I meet and by when?
§ 60.2115 - What if I do not use a wet scrubber, fabric filter, activated carbon injection, selective noncatalytic reduction, an electrostatic precipitator, or a dry scrubber to comply with the emission limitations?
§ 60.2120 - Affirmative defense for violation of emission standards during malfunction.
Preconstruction Siting Analysis
§ 60.2045 - Who must prepare a siting analysis?
§ 60.2050 - What is a siting analysis?
Initial Compliance Requirements
§ 60.2135 - How do I demonstrate initial compliance with the emission limitations and establish the operating limits?
§ 60.2140 - By what date must I conduct the initial performance test?
§ 60.2141 - By what date must I conduct the initial air pollution control device inspection?
Title V Operating Permits
§ 60.2242 - Am I required to apply for and obtain a Title V operating permit for my unit?
Table 2 to Subpart CCCC - Operating Limits for Wet Scrubbers
Table 3 to Subpart CCCC - Toxic Equivalency Factors
Table 1 to Subpart CCCC of Part 60 - Emission Limitations for Incinerators for Which Construction Is Commenced After November 30, 1999, But No Later Than June 4, 2010, or for Which Modification or Reconstruction Is Commenced on or After June 1, 2001, But No Later Than August 7, 2013
Table 2 to Subpart CCCC of Part 60 - Operating Limits for Wet Scrubbers
Table 3 to Subpart CCCC of Part 60 - Toxic Equivalency Factors
Table 4 to Subpart CCCC of Part 60 - Summary of Reporting Requirements
Table 5 to Subpart CCCC of Part 60 - Emission Limitations for Incinerators That Commenced Construction After June 4, 2010, or That Commenced Reconstruction or Modification After August 7, 2013
Table 6 to Subpart CCCC of Part 60 - Emission Limitations for Energy Recovery Units That Commenced Construction After June 4, 2010, or That Commenced Reconstruction or Modification After August 7, 2013
Table 7 to Subpart CCCC of Part 60 - Emission Limitations for Waste-Burning Kilns That Commenced Construction After June 4, 2010, or Reconstruction or Modification After August 7, 2013
Table 8 to Subpart CCCC of Part 60 - Emission Limitations for Small, Remote Incinerators That Commenced Construction After June 4, 2010, Or That Commenced Reconstruction or Modification After August 7, 2013