Code of Federal Regulations (Last Updated: November 8, 2024) |
Title 40 - Protection of Environment |
Chapter I - Environmental Protection Agency |
SubChapter C - Air Programs |
Part 60 - Standards of Performance for New Stationary Sources |
Subpart CCCC - Standards of Performance for Commercial and Industrial Solid Waste Incineration Units |
Subpart CCCC - Standards of Performance for Commercial and Industrial Solid Waste Incineration Units
Operator Training and Qualification |
§ 60.2070 - What are the operator training and qualification requirements? |
§ 60.2075 - When must the operator training course be completed? |
§ 60.2080 - How do I obtain my operator qualification? |
§ 60.2085 - How do I maintain my operator qualification? |
§ 60.2090 - How do I renew my lapsed operator qualification? |
§ 60.2095 - What site-specific documentation is required? |
§ 60.2100 - What if all the qualified operators are temporarily not accessible? |
Recordkeeping and Reporting |
§ 60.2175 - What records must I keep? |
§ 60.2180 - Where and in what format must I keep my records? |
§ 60.2185 - What reports must I submit? |
§ 60.2190 - What must I submit prior to commencing construction? |
§ 60.2195 - What information must I submit prior to initial startup? |
§ 60.2200 - What information must I submit following my initial performance test? |
§ 60.2205 - When must I submit my annual report? |
§ 60.2210 - What information must I include in my annual report? |
§ 60.2215 - What else must I report if I have a deviation from the operating limits or the emission limitations? |
§ 60.2220 - What must I include in the deviation report? |
§ 60.2225 - What else must I report if I have a deviation from the requirement to have a qualified operator accessible? |
§ 60.2230 - Are there any other notifications or reports that I must submit? |
§ 60.2235 - In what form can I submit my reports? |
§ 60.2240 - Can reporting dates be changed? |
Continuous Compliance Requirements |
§ 60.2145 - How do I demonstrate continuous compliance with the emission limitations and the operating limits? |
§ 60.2150 - By what date must I conduct the annual performance test? |
§ 60.2151 - By what date must I conduct the annual air pollution control device inspection? |
§ 60.2155 - May I conduct performance testing less often? |
§ 60.2160 - May I conduct a repeat performance test to establish new operating limits? |
Air Curtain Incinerators (Acis) |
§ 60.2245 - What is an air curtain incinerator? |
§ 60.2250 - What are the emission limitations for air curtain incinerators? |
§ 60.2255 - How must I monitor opacity for air curtain incinerators? |
§ 60.2260 - What are the recordkeeping and reporting requirements for air curtain incinerators? |
Applicability |
§ 60.2010 - Does this subpart apply to my incineration unit? |
§ 60.2015 - What is a new incineration unit? |
§ 60.2020 - What combustion units are exempt from this subpart? |
§ 60.2025 - What if my chemical recovery unit is not listed in 60.2020(n)? |
§ 60.2030 - Who implements and enforces this subpart? |
§ 60.2035 - How are these new source performance standards structured? |
§ 60.2040 - Do all eleven components of these new source performance standards apply at the same time? |
Introduction |
§ 60.2000 - What does this subpart do? |
§ 60.2005 - When did this subpart become effective? |
Air Curtain Incinerators |
Definitions |
§ 60.2265 - What definitions must I know? |
Monitoring |
§ 60.2165 - What monitoring equipment must I install and what parameters must I monitor? |
§ 60.2170 - Is there a minimum amount of monitoring data I must obtain? |
Waste Management Plan |
§ 60.2055 - What is a waste management plan? |
§ 60.2060 - When must I submit my waste management plan? |
§ 60.2065 - What should I include in my waste management plan? |
Performance Testing |
§ 60.2125 - How do I conduct the initial and annual performance test? |
§ 60.2130 - How are the performance test data used? |
Emission Limitations and Operating Limits |
§ 60.2105 - What emission limitations must I meet and by when? |
§ 60.2110 - What operating limits must I meet and by when? |
§ 60.2120 - Affirmative defense for violation of emission standards during malfunction. |
Preconstruction Siting Analysis |
§ 60.2045 - Who must prepare a siting analysis? |
§ 60.2050 - What is a siting analysis? |
Initial Compliance Requirements |
§ 60.2135 - How do I demonstrate initial compliance with the emission limitations and establish the operating limits? |
§ 60.2140 - By what date must I conduct the initial performance test? |
§ 60.2141 - By what date must I conduct the initial air pollution control device inspection? |
Title V Operating Permits |
§ 60.2242 - Am I required to apply for and obtain a Title V operating permit for my unit? |
Table 2 to Subpart CCCC - Operating Limits for Wet Scrubbers |
Table 3 to Subpart CCCC - Toxic Equivalency Factors |
Table 2 to Subpart CCCC of Part 60 - Operating Limits for Wet Scrubbers |
Table 3 to Subpart CCCC of Part 60 - Toxic Equivalency Factors |
Table 4 to Subpart CCCC of Part 60 - Summary of Reporting Requirements |
Table 5 to Subpart CCCC of Part 60 - Emission Limitations for Incinerators That Commenced Construction After June 4, 2010, or That Commenced Reconstruction or Modification After August 7, 2013 |
Table 7 to Subpart CCCC of Part 60 - Emission Limitations for Waste-Burning Kilns That Commenced Construction After June 4, 2010, or Reconstruction or Modification After August 7, 2013 |