§ 52.1570 - Identification of plan.  


Latest version.
  • § 52.1570 Identification of plan.

    (a) Purpose and scope. This section sets forth the applicable State Implementation Plan (SIP) for New Jersey under section 110 of the Clean Air Act, as amended, 42 U.S.C. 7401 et seq., and 40 CFR part 51 to meet National Ambient Air Quality Standards.

    (b) Incorporation by reference.

    (1) Material listed in paragraphs (c) and (d) of this section with an EPA approval date prior to October 1, 2016, was approved for incorporation by reference by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Entries in paragraphs (c) and (d) of this section with the EPA approval dates after October 1, 2016 have been approved by EPA for inclusion in the State implementation plan and for incorporation by reference into the plan as it is contained in this section, and will be considered by the Director of the Federal Register for approval in the next update to the SIP compilation.

    (2) EPA Region 2 certifies that the materials provided by EPA at the addresses in paragraph (b)(3) of this section are an exact duplicate of the officially promulgated state rules/regulations which have been approved as part of the state implementation plan as of the dates referenced in paragraph (b)(1) of this section.

    (3) Copies of the materials incorporated by reference into the state implementation plan may be inspected at the Environmental Protection Agency, Region 2, Air Programs Branch, 290 Broadway, New York, New York 10007. To obtain the material, please call the Regional Office. You may also inspect the material with an EPA approval date prior to October 1, 2016 at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, go to: http://www.archives.gov/federal-register/cfr/ibr-locations.html.

    (c) EPA approved regulations.

    EPA-Approved New Jersey State Regulations and Laws

    State citationTitle/subjectState effective dateEPA approval dateComments
    Title 7, Chapter 26, Subchapter 2AAdditional, Specific Disposal Regulations for Sanitary LandfillsJune 1, 1987June 29, 1990, 55 FR 26687
    Title 7, Chapter 27, Subchapter 1General ProvisionsMay 1, 1956May 31, 1972, 37 FR 10880
    Title 7, Chapter 27, Subchapter 2Control and Prohibition of Open BurningJune 8, 1981September 30, 1981, 46 FR 47779
    Title 7, Chapter 27, Subchapter 3Control and Prohibition of Smoke from Combustion of FuelOctober 12, 1977January 27, 1984, 49 FR 3463
    Title 7, Chapter 27, Subchapter 4Control and Prohibition of Particles from Combustion of FuelApril 20, 2009August 3, 2010, 75 FR 45483
    Title 7, Chapter 27, Subchapter 5Prohibition of Air PollutionOctober 12, 1977January 27, 1984, 49 FR 3463
    Title 7, Chapter 27, Subchapter 6Control and Prohibition of Particles from Manufacturing Processes (except section 6.5)May 23, 1977January 26, 1979, 44 FR 5425Section 6.5, “Variances,” is not approved (40 CFR 52. 52.1587(c)(20) and 52.1604(a)). Any State-issued variances must be formally incorporated as SIP revisions if EPA is to be bound to their provisions (40 CFR 52.1604(a)).
    Title 7, Chapter 27, Subchapter 7SulfurMarch 1, 1967May 31, 1972, 37 FR 10880Subchapter 7.2(k) is no longer approved due to EPA action on August 1, 2022, 87 FR 46890.
    Title 7, Chapter 27, Subchapter 7.2(k)Commercial fuel exemptionNovember 6, 2017August 1, 2022, 87 FR 46890
    Title 7, Chapter 27, Subchapter 8Permits and Certificates, Hearings, and ConfidentialityApril 5, 1985November 25, 1986, 51 FR 42565
    Title 7, Chapter 27, Section 8.1DefinitionsJanuary 16, 2018November 28, 2023, 88 FR 83036
    Title 7, Chapter 27, Section 8.2ApplicabilityJune 20, 1994August 7, 1997, 62 FR 42412
    Title 7, Chapter 27, Section 8.11Permits and Certificates, Hearings, and ConfidentialityMarch 2, 1992April 15, 1994, 59 FR 17933
    Title 7, Chapter 27, Subchapter 9Sulfur in FuelsSeptember 20, 2010January 3, 2012, 77 FR 19Sulfur dioxide “bubble” permits issued by the State pursuant to Section 9.2 and not waived under the provisions of Section 9.4 become applicable parts of the SIP only after receiving EPA approval as a SIP revision.
    Title 7, Chapter 27, Subchapter 10Sulfur in Solid FuelsApril 20, 2009August 3, 2010, 75 FR 45483Notification of “large zone 3 coal conversions” must be provided to EPA (40 CFR 52.1601(b)).
    Title 7, Chapter 27, Subchapter 11IncineratorsAugust 15, 1968May 31, 1972, 37 FR 10880
    Title 7, Chapter 27, Subchapter 12Prevention and Control of Air Pollution EmergenciesMay 20, 1974May 30, 2018, 83 FR 24661
    Title 7, Chapter 27, Subchapter 13Ambient Air Quality StandardsJune 25, 1985November 25, 1986, 51 FR 42565
    Title 7, Chapter 27, Subchapter 14, Section 14.1Control and Prohibition of Air Pollution from Diesel-Powered Motor Vehicles/DefinitionsOctober 3, 2016May 9, 2018, EPA approval finalized at 83 FR 21174
    Title 7, Chapter 27, Subchapter 14, Section 14.2Control and Prohibition of Air Pollution from Diesel-Powered Motor Vehicles/ApplicabilityOctober 3, 2016May 9, 2018, EPA approval finalized at 83 FR 21174
    Title 7, Chapter 27, Subchapter 14, Section 14.3Control and Prohibition of Air Pollution from Diesel-Powered Motor Vehicles/General prohibitionsOctober 3, 2016May 9, 2018, EPA approval finalized at 83 FR 21174
    Title 7, Chapter 27, Subchapter 14, Section 14.4Control and Prohibition of Air Pollution from Diesel-Powered Motor Vehicles/General public highway standardsOctober 3, 2016May 9, 2018, EPA approval finalized at 83 FR 21174
    Title 7, Chapter 27, Subchapter 14, Section 14.5Control and Prohibition of Air Pollution from Diesel-Powered Motor Vehicles/Motor vehicle inspectionsOctober 3, 2016May 9, 2018, EPA approval finalized at 83 FR 21174
    Title 7, Chapter 27, Subchapter 14, Section 14.6Control and Prohibition of Air Pollution from Diesel-Powered Motor Vehicles/Motor vehicle standardsOctober 3, 2016May 9, 2018, EPA approval finalized at 83 FR 21174
    Title 7, Chapter 27, Subchapter 14, Section 14.7Control and Prohibition of Air Pollution from Diesel-Powered Motor Vehicles/Licensed emissions inspectorsOctober 3, 2016May 9, 2018, EPA approval finalized at 83 FR 21174
    Title 7, Chapter 27, Subchapter 14, Section 14.10Control and Prohibition of Air Pollution from Diesel-Powered Motor Vehicles/PenaltiesOctober 3, 2016May 9, 2018, EPA approval finalized at 83 FR 21174
    Title 7, Chapter 27, Subchapter 14, AppendixControl and Prohibition of Air Pollution from Diesel-Powered Motor Vehicles/AppendixOctober 3, 2016May 9, 2018, EPA approval finalized at 83 FR 21174
    Title 7, Chapter 27, Subchapter 15Control and Prohibition of Air Pollution from Gasoline-Fueled Motor Vehicles/DefinitionOctober 3, 2016May 9, 2018, EPA approval finalized at 83 FR 21174
    Title 7, Chapter 27, Subchapter 16Control and Prohibition of Air Pollution by Volatile Organic CompoundsJanuary 16, 2018November 28, 2023, 88 FR 83036
    Title 7, Chapter 27, Subchapter 17Control and Prohibition of Air Pollution by Toxic SubstancesJanuary 16, 2018November 28, 2023, 88 FR 83036
    Title 7, Chapter 27, Subchapter 18Control and Prohibition of Air Pollution from New or Altered Sources Affecting Ambient Air Quality (Emission Offset Rules)November 6, 2017November 28, 2023, 88 FR 83036
    Title 7, Chapter 27, Subchapter 19Control and Prohibition of Air Pollution by Oxides of NitrogenJanuary 16, 2018November 28, 2023, 88 FR 83036Subchapter 19 is approved into the SIP except for the following provisions: (1) Phased compliance plan through repowering in section 19.21 that allows for implementation beyond May 1, 1999; and (2) phased compliance plan through the use of innovative control technology in section 19.23 that allows for implementation beyond May 1, 1999.
    Title 7, Chapter 27, Subchapter 21Emission StatementsJanuary 16, 2018November 28, 2023, 88 FR 83036Section 7:27-21.3(b)(1) and 7:27-21.3(b)(2) of New Jersey's Emission Statement rule requires facilities to report on the following pollutants to assist the State in air quality planning needs: Hydrochloric acid, hydrazine, methylene chloride, tetrachloroethylene, 1, 1, 1 trichloroethane, carbon dioxide and methane. EPA will not take SIP-related enforcement action on these pollutants.
    Title 7, Chapter 27, Subchapter 23Prevention of Air Pollution from Architectural CoatingsDecember 29, 2008December 22, 2010, 75 FR 80340
    Title 7, Chapter 27, Subchapter 24Prevention of Air Pollution from Consumer ProductsDecember 29, 2008December 22, 2010, 75 FR 80340
    Title 7, Chapter 27, Subchapter 25Control and Prohibition of Air Pollution by Vehicular FuelsDecember 29, 2008December 22, 2010, 75 FR 80340
    Title 7, Chapter 27, Subchapter 26Prevention of Air Pollution from Adhesives, Sealants, Adhesive Primers and Sealant PrimersDecember 29, 2008December 22, 2010, 75 FR 80340
    Title 7, Chapter 27, Subchapter 29Low Emission Vehicle (LEV) ProgramJanuary 17, 2006February 13, 2008, 73 FR 8200In Section 29.13(g), Title 13, Chapter 1, Article 2, Section 1961.1 of the California Code of Regulations relating to greenhouse gas emission standards, is not incorporated into the SIP.
    Title 7, Chapter 27A, Subchapter 3, Section 3.10Civil Administrative Penalties for Violations of Rules Adopted Pursuant to the ActJanuary 16, 2018November 28, 2023, 88 FR 83036
    Title 7, Chapter 27B, Subchapter 3Air Test Method 3: Sampling and Analytic Procedures for the Determination of Volatile Organic Compounds from Source OperationsJune 20, 1994August 7, 1997, 62 FR 42412
    Title 7, Chapter 27B, Subchapter 4, Section 4.1Air Test Method 4: Testing Procedures for Diesel-Powered Motor VehiclesOctober 3, 2016May 9, 2018, EPA approval finalized at 83 FR 21174
    Title 7, Chapter 27B, Subchapter 4, Section 4.2Air Test Method 4: Testing Procedures for Diesel-Powered Motor VehiclesOctober 3, 2016May 9, 2018, EPA approval finalized at 83 FR 21174
    Title 7, Chapter 27B, Subchapter 4, Section 4.3Air Test Method 4: Testing Procedures for Diesel-Powered Motor VehiclesOctober 3, 2016May 9, 2018, EPA approval finalized at 83 FR 21174
    Title 7, Chapter 27B, Subchapter 4, Section 4.6Air Test Method 4: Testing Procedures for Diesel-Powered Motor VehiclesOctober 3, 2016May 9, 2018, EPA approval finalized at 83 FR 21174
    Title 7, Chapter 27B, Subchapter 4, Section 4.7Air Test Method 4: Testing Procedures for Diesel-Powered Motor VehiclesOctober 3, 2016May 9, 2018, EPA approval finalized at 83 FR 21174
    Title 7, Chapter 27B, Subchapter 4, Section 4.8Air Test Method 4: Testing Procedures for Diesel-Powered Motor VehiclesOctober 3, 2016May 9, 2018, EPA approval finalized at 83 FR 21174
    Title 7, Chapter 27B, Subchapter 5Air Test Method 5: Testing Procedures for Gasoline-Fueled Motor VehiclesOctober 3, 2016May 9, 2018, EPA approval finalized at 83 FR 21174
    Title 13, Chapter 20, Subchapter 7.1Vehicle InspectionsApril 26, 2016May 9, 2018, EPA approval finalized at 83 FR 21174
    Title 13, Chapter 20, Subchapter 7.2Vehicle InspectionsApril 26, 2016May 9, 2018, EPA approval finalized at 83 FR 21174
    Title 13, Chapter 20, Subchapter 7.3Vehicle InspectionsApril 26, 2016May 9, 2018, EPA approval finalized at 83 FR 21174
    Title 13, Chapter 20, Subchapter 7.4Vehicle InspectionsApril 26, 2016May 9, 2018, EPA approval finalized at 83 FR 21174
    Title 13, Chapter 20, Subchapter 7.5Vehicle InspectionsApril 26, 2016May 9, 2018, EPA approval finalized at 83 FR 21174
    Title 13, Chapter 20, Subchapter 7.6Vehicle InspectionsApril 26, 2016May 9, 2018, EPA approval finalized at 83 FR 21174
    Title 13, Chapter 20, Subchapter 24, Section 20MotorcyclesOctober 19, 2009March 15, 2012, 77 FR 15263
    Title 13, Chapter 20, Subchapter 26, Section 26.2Compliance with Diesel Emission Standards and Equipment, Periodic Inspection Program for Diesel Emissions, and Self-Inspection of Certain Classes of Motor VehiclesApril 26, 2016May 9, 2018, EPA approval finalized at 83 FR 21174
    Title 13, Chapter 20, Subchapter 26, Section 26.11Compliance with Diesel Emission Standards and Equipment, Periodic Inspection Program for Diesel Emissions, and Self-Inspection of Certain Classes of Motor VehiclesApril 26, 2016May 9, 2018, EPA approval finalized at 83 FR 21174
    Title 13, Chapter 20, Subchapter 26, Section 26.12Compliance with Diesel Emission Standards and Equipment, Periodic Inspection Program for Diesel Emissions, and Self-Inspection of Certain Classes of Motor VehiclesApril 26, 2016May 9, 2018, EPA approval finalized at 83 FR 21174
    Title 13, Chapter 20, Subchapter 26, Section 26.16Compliance with Diesel Emission Standards and Equipment, Periodic Inspection Program for Diesel Emissions, and Self-Inspection of Certain Classes of Motor VehiclesApril 26, 2016May 9, 2018, EPA approval finalized at 83 FR 21174
    Title 13, Chapter 20, Subchapter 26, Section 26.17Compliance with Diesel Emission Standards and Equipment, Periodic Inspection Program for Diesel Emissions, and Self-Inspection of Certain Classes of Motor VehiclesApril 26, 2016May 9, 2018, EPA approval finalized at 83 FR 21174
    Title 13, Chapter 20, Subchapter 28, Sections 28.3, 28.4 and 28.6Inspection of New Motor VehiclesOctober 19, 2009March 15, 2012, 77 FR 15263
    Title 13, Chapter 20, Subchapter 29, Sections 29.1, 29.2 and 29.3Mobile Inspection UnitOctober 19, 2009March 15, 2012, 77 FR 15263
    Title 13, Chapter 20, Subchapter 32Inspection Standards and Test Procedures to be Used by Official Inspection FacilitiesApril 26, 2016May 9, 2018, EPA approval finalized at 83 FR 21174
    Title 13, Chapter 20, Subchapter 33Inspection Standards and Test Procedures to be Used by Licensed Private Inspection FacilitiesApril 26, 2016May 9, 2018, EPA approval finalized at 83 FR 21174
    Title 13, Chapter 20, Subchapter 43Enhanced Motor Vehicle Inspection and Maintenance ProgramApril 26, 2016May 9, 2018, EPA approval finalized at 83 FR 21174
    Title 13, Chapter 20, Subchapter 44Private Inspection Facility LicensingApril 26, 2016May 9, 2018, EPA approval finalized at 83 FR 21174
    Title 13, Chapter 20, Subchapter 45Motor Vehicle Emission Repair Facility RegistrationOctober 19, 2009March 15, 2012, 77 FR 15263
    Title 13, Chapter 21, Subchapter 5, Section 5.12Registration Plate DecalsDecember 6, 1999January 22, 2002, 67 FR 2811
    Title 13, Chapter 21, Subchapter 15, Sections 15.8 and 15.12New Jersey Licensed Motor Vehicle DealersOctober 19, 2009March 15, 2012, 77 FR 15263
    Title 16, Chapter 53Autobus SpecificationsSeptember 26, 1983June 13, 1986, 51 FR 21549Only Sections 3.23, 3.24, 3.27, 6.15, 6.21, 6.30, 7.14, 7.17, 7.23, 8.15, 8.22, 8.25 are approved.
    Title 39, Chapter 8, Subchapter 1Motor Vehicle Inspections ExceptionsJuly 1, 2010March 15, 2012, 77 FR 15263
    Title 39, Chapter 8, Subchapter 2Inspection of Motor Vehicles; Rules, RegulationsJuly 1, 2010March 15, 2012, 77 FR 15263
    Title 39, Chapter 8, Subchapter 3Certificate of Approval, Issuance; Owner's Obligation for SafetyJuly 1, 2010March 15, 2012, 77 FR 15263
    N.J.S.A. 52:13D-14New Jersey's Conflict of Interest LawJanuary 11, 1972May 30, 2018, 83 FR 24661
    N.J.S.A.52:13D-16(a)-(b)New Jersey's Conflict of Interest LawSeptember 16, 1996May 30, 2018, 83 FR 24661
    N.J.S.A. 52:13D-21(n)New Jersey's Conflict of Interest LawMarch 15, 2006May 30, 2018, 83 FR 24661

    (d) EPA approved State source-specific requirements.

    EPA-Approved New Jersey Source-Specific Provisions

    Name of sourceIdentifier No.State effective dateEPA approval dateComments
    Johnson Matthey55270June 13, 1995January 17, 1997, 62 FR 2581NOX RACT Facility Specific NOX Emission Limits NJAC 7:27-9.13. Multi-chamber metals recovery furnace, installation of low NOX burner.
    Sandoz Pharmaceuticals Corporation104855March 23, 1995January 17, 1997, 62 FR 2581NOX RACT Facility Specific NOX Emission Limits NJAC 7:27-9.13. Controlled air combustion small trash from fired boiler energy recovery system.
    PSEG Fossil Hudson Generation StationBOP110001March 8, 2011January 3, 2012, 77 FR 19NOX, SO2, PM10 BART source specific control units: U1-OS1 (cyclone boiler (shutdown)), U1-OS2 (dry bottom wall-fired boiler), U15-OS(coal receiving system), U16-OS (coal reclaim system).
    Conoco Phillips (Facility is now Phillips 66.)BOP110001September 21, 2011January 3, 2012, 77 FR 19NOX, SO2 and PM10 BART source specific control units: OS1-E241, OS2-E243, OS3-E245, OS4-E246, OS5-E247, OS6-E248, OS7-E249, OS8-E250, OS11-E242, OS13-E253, and OS15-E258 (process heaters).
    Vineland Municipal Electric Utility—Howard M. DownBOP110001September 26, 2011January 3, 2012, 77 FR 19NOX, SO2 and PM10 BART source specific control units: U10-OS2(fuel oil boiler retired September 1, 2012), U10-OS3 (turbine (shutdown)), and U22-OS (emergency generator).
    BL England Generating Station (Facility is now RC Cape May.)BOP100003December 16, 2010January 3, 2012, 77 FR 19NOX, SO2 and PM10 BART source specific control units: U1-OS1(wet bottom coal-fired boiler (shutdown)), U2-OS1 (cyclone wet bottom coal fired boiler), U3-OS1 (oil-fired tangential boiler), U6-OS1 (emergency fire water pump engine), U7-OS1, U7-OS2, U7-OS4, U7-OS5, U7-OS6, U7-OS7,U7-OS10, U7-OS11, U7-OS12 (coal handling systems) and U8-OS1 (cooling tower).
    Atlantic States Cast Iron Pipe Company85004November 22, 1994October 20, 1998, 63 FR 55949Approving NOX RACT Source Specific regulations NJAC 7:27-19.13 Cupola and Annealing Oven processes. Effective date 12/21/98.
    Trigen-Trenton Energy Co61015January 11, 2007July 16, 2008, 73 FR 40752Alternative NOX Emission Limit pursuant to NJAC 7:27-19.13 For 2 Cooper Bessemer Distillate Oil or Dual Fired 4 stroke Diesel Internal Combustion Engines.
    PSE&G Nuclear Hope Creek and Salem Generating Stations Cooling TowerBOP050003August 7, 2007 Significant Modification ApprovalApril 1, 2009, 74 FR 14734TSP/PM 10 Source Specific Variance to SIP NJAC 7:27-6.5 Cooling Tower Unit 24, OS1 Effective Date 5/1/2009.
    Co-Steel Corp of Sayreville (Formerly New Jersey Steel Corporation)15076September 3, 1997November 12, 2003, 68 FR 63991NOX Source specific emission limit under NJAC 7:27-19.13 for Electric arc furnace, melt shop metallurgy and billet reheat furnace sources. Effective date 12/13/2003.
    Transcontinental Gas Pipelines Corp., LNG Station 24002626June 12, 2014August 10, 2017, 82 FR 37308 Alternate NOX Emission Limit and other requirements pursuant to NJAC 7:27-19.13 for four natural gas-fired water bath heaters ((U7-U10).
    Joint Base McGuire-Dix-Lakehurst (Lakehurst, NJ)BOP15001August 26, 2016August 10, 2017, 82 FR 37308Alternate NOX Emission Limit and other requirements pursuant to NJAC 7:27-19.13 for two natural gas-fired boilers (Nos 2 and 3).
    Gerdau Ameristeel SayrevilleProgram Interest 18052; Activity Number BOP 150001; Emission Unit U2; Operating Scenario OS301; Ref #2March 26, 2018May 30, 2019, 84 FR 24980None.
    CMC Steel New JerseyProgram Interest 18052; Activity Number BOP 180001; Emission Unit U2; Operating Scenario OS301; Ref #2December 5, 2018May 30, 2019, 84 FR 24980New ownership from Gerdau Ameristeel Sayreville to Commercial Metal Company (CMC).
    Paulsboro RefineryPI 55829; BOP 180002 U9006/26/201810/11/2019, 84 FR 54785The External floating roof tanks (EFRTs) that are not being domed include tank numbers 725, 802, 1023, 1027, 2869, 2940, 2941, 3174, S8O, S8I, and S82. The EFRTs that may complete doming after the regulatory deadline include tank numbers 1063, 1116, 1320, 1065, and 1066.
    Buckeye Port Reading TerminalPI 17996, BOP 160001 U86/13/201810/11/2019, 84 FR 54785The EFRTs that are not being domed include tank numbers 7930, 7934, 7937, and 7945. The EFRTs that may complete doming after the regulatory deadline include tank numbers 1219 and 1178.
    Buckeye Pennsauken TerminalPI 51606, BOP 130002 U18/21/201410/11/2019, 84 FR 54785The EFRT that are not being domed include tank number 2018.
    Phillips 66 Company LindenPI 41805, BOP 170004 U161/26/201810/11/2019, 84 FR 54785The EFRTs that are not being domed include tank numbers T52, T105, T119, T134, T244, T349, T350, T354, T355, and T356. The EFRT that may complete doming after the regulatory deadline include tank number T234.
    CMC Steel New JerseyBOP 150002; PI 18052; Emission Unit U15/1/20192/17/2021None.

    (e) EPA approved nonregulatory and quasi-regulatory provisions.

    EPA-Approved New Jersey Nonregulatory and Quasi-Regulatory Provisions

    SIP elementApplicable geographic or nonattainment areaNew Jersey submittal dateEPA approval dateExplanation
    New Jersey NOX SIP Call Budget DemonstrationStatewideApril 26, 1999 and supplemented on July 31, 2000May 22, 2001, 66 FR 28063
    2002 and 2005 Reasonable Further Progress PlansNew Jersey portion of the New York-Northern New Jersey-Long Island and Philadelphia-Wilmington-Trenton 1-hour ozone nonattainment areasApril 11, 2001February 4, 2002, 67 FR 5152
    2007 Reasonable Further Progress PlansNew Jersey portion of the New York-Northern New Jersey-Long Island 1-hour ozone nonattainment areaApril 11, 2001February 4, 2002, 67 FR 5152
    2002, 2005 and 2007 Transportation Conformity BudgetsNew Jersey portion of the New York-Northern New Jersey-Long Island Severe and Philadelphia-Wilmington-Trenton 1-hour ozone nonattainment areasApril 11, 2001February 4, 2002, 67 FR 5152
    Updated 1990, 1996, 1999, 2002 and 2005 General Conformity Emissions BudgetMcGuire Air Force BaseApril 11, 2001February 4, 2002, 67 FR 5152
    2002, 2005 and 2007 Ozone Projection Year Emission InventoriesNew Jersey portion of the New York-Northern New Jersey-Long Island and Philadelphia-Wilmington-Trenton 1-hour ozone nonattainment areasApril 11, 2001February 4, 2002, 67 FR 5152
    1996 Base Year Emission InventoriesStatewide and New Jersey portion of the New York-Northern New Jersey-Long Island Severe and Philadelphia-Wilmington-Trenton 1-hour ozone nonattainment areasApril 11, 2001February 4, 2002, 67 FR 5152
    RACM AnalysisNew Jersey portion of the New York-Northern New Jersey-Long Island Severe and Philadelphia-Wilmington-Trenton 1-hour ozone nonattainment areasOctober 16, 2001February 4, 2002, 67 FR 5152
    1-Hour ozone Attainment Demonstration for 2007New Jersey portion of the New York-Northern New Jersey-Long Island Severe and Philadelphia-Wilmington-Trenton 1-hour ozone nonattainment areaAugust 31 and October 16, 1998 and April 26, 2000February 4, 2002, 67 FR 5152
    1-Hour ozone Attainment Demonstration for 2005New Jersey portion of the Philadelphia-Wilmington-Trenton 1-hour ozone nonattainment areaAugust 31 and October 16, 1998 and April 26, 2000February 4, 2002, 67 FR 5152
    CO Attainment Demonstration and Redesignation RequestNew Jersey portion of the New York-Northern New Jersey-Long Island 8-hour CO nonattainment areaJanuary 15, 2002August 23, 2002, 67 FR 54574
    1996 CO Attainment InventoryNew Jersey portion of the New York-Northern New Jersey-Long Island 8-hour CO nonattainment areaAugust 7, 1998 and supplemented on October 1, 2001 and January 15, 2002August 23, 2002, 67 FR 54574
    2007 and 2014 CO Projection InventoriesNew Jersey portion of the New York-Northern New Jersey-Long Island 8-hour CO nonattainment areaJanuary 15, 2002August 23, 2002, 67 FR 54574
    1997, 2007 and 2014 Transportation Conformity BudgetsNew Jersey portion of the New York-Northern New Jersey-Long Island 8-hour CO nonattainment areaDecember 10, 1999 and January 15, 2002August 23, 2002, 67 FR 54574
    Redesignation request to attainment for the CO nonattainment areaNew Jersey portion of the New York-Northern New Jersey-Long Island 8-hour CO nonattainment areaNovember 15, 1992, October 4, 2003 and August 7, 1998 and supplemented on October 1, 2001 and January 15, 2002August 23, 2002, 67 FR 54574
    CO Maintenance PlanAtlantic, Burlington, Mercer, Middlesex, Monmouth, Morris, Ocean, Salem and Somerset (the 9 non-classified areas) and Camden County, in New Jersey. CO NAAQSMay 18, 2006July 10, 2006, 71 FR 38770
    2002 CO Attainment InventoryAtlantic, Burlington, Mercer, Middlesex, Monmouth, Morris, Ocean, Salem and Somerset (the 9 non-classified areas) and Camden County, in New Jersey. CO NAAQSMay 18, 2006July 10, 2006, 71 FR 38770
    1997 and 2007 CO Transportation Conformity Motor Vehicle Emission BudgetsAtlantic, Burlington, Mercer, Middlesex, Monmouth, Morris, Ocean, Salem and Somerset (the 9 non-classified areas) and Camden County, in New Jersey. CO NAAQSMay 21, 2006July 10, 2006, 71 FR 38770
    2007 and 2014 CO Transportation Conformity Emission BudgetsFive county New Jersey portion of the New York-Northern New Jersey-Long Island CO nonattainment areaMay 18, 2006July 10, 2006, 71 FR 38770
    2002 VOC, NOX and CO ozone season and annual emissions inventoryState-wideMay 18, 2006July 10, 2006, 71 FR 38770
    2002 PM2.5 and associated precursors annual emissions inventoryNew Jersey portion of the New York-Northern New Jersey-Long Island PM2.5 nonattainment area and statewideMay 18, 2006July 10, 2006, 71 FR 38770
    2005 and 2007 VOC, NOX and Transportation Conformity Emission BudgetsNew Jersey portion of the New York-Northern New Jersey-Long Island ozone nonattainment areaMay 18, 2006July 10, 2006, 71 FR 38770
    Updated 1990, 1996, 1999, 2002 and 2005 General Conformity Emissions BudgetMcGuire Air Force BaseMay 18, 2006July 10, 2006, 71 FR 38770
    2005 and 2007 VOC and NOX Transportation Conformity Emission BudgetsNew Jersey portion of the Philadelphia-Wilmington-Trenton ozone nonattainment areaMay 18, 2006July 10, 2006, 71 FR 38770
    2008 VOC and NOX Projection InventoriesNew Jersey portion of the New York-Northern New Jersey-Long Island and Philadelphia-Wilmington-Atlantic City ozone nonattainment areasOctober 29, 2007May 15, 2009, 74 FR 22837
    2008 Reasonably Further Progress PlansNew Jersey portion of the New York-Northern New Jersey-Long Island and Philadelphia-Wilmington-Atlantic City ozone nonattainment areasOctober 29, 2007May 15, 2009, 74 FR 22837
    RACM AnalysisNew Jersey portion of the New York-Northern New Jersey-Long Island and Philadelphia-Wilmington-Atlantic City ozone nonattainment areasOctober 29, 2007May 15, 2009, 74 FR 22837
    2008 VOC and NOX Transportation Conformity BudgetsNew Jersey portion of the New York-Northern New Jersey-Long Island and Philadelphia-Wilmington-Atlantic City ozone nonattainment areasOctober 29, 2007May 15, 2009, 74 FR 22837
    2008-2011 VOC and NOX General Conformity BudgetsMcGuire Air Force Base and Lakehurst Naval Air StationOctober 29, 2007May 15, 2009, 74 FR 22837
    RACT AnalysisState-wideAugust 1, 2007May 15, 2009, 74 FR 22837
    Regional Haze Plan from 2002-2018State-wideJuly 28, 2009 and supplemented on December 9, 2010, March 2, 2011 and December 7, 2011January 3, 2012, 77 FR 19
    2002 and 2018 Regional Haze Modeling and Projection InventoryState-wideJuly 28, 2009 and supplemented on December 9, 2010, March 2, 2011 and December 7, 2011January 3, 2012, 77 FR 19
    Reasonable Progress Goals Visibility DemonstrationState-wideJuly 28, 2009 and supplemented on December 9, 2010, March 2, 2011 and December 7, 2011January 3, 2012, 77 FR 19
    BART AnalysisState-wideJuly 28, 2009 and supplemented on December 9, 2010, March 2, 2011 and December 7, 2011January 3, 2012, 77 FR 19
    8-hour ozone Attainment DemonstrationNew Jersey portion of the New York-Northern New Jersey-Long Island and Philadelphia-Wilmington-Atlantic City 8-hour ozone nonattainment areasOctober 29, 2007February 11, 2013, 78 FR 9596
    NJ Infrastructure SIP1997 8-hour ozone and 1997 and 2006 PM2.5 StandardsFebruary 25, 2008 and supplemented on January 15, 2010June 14, 2013, 78 FR 35764
    Redesignation RequestNew Jersey portion of the New York-Northern New Jersey-Long Island NY-NJ-CT and New Jersey portion of the Philadelphia-Wilmington PA-NJ-DE PM2.5 1997 annual and 2006 24-hour PM2.5 nonattainment areasDecember 26, 2012 and supplemented on May 3, 2013September 4, 2013, 78 FR 54396
    PM2.5 Attainment DemonstrationNew Jersey portion of the New York-Northern New Jersey-Long Island NY-NJ-CT and New Jersey portion of the Philadelphia-Wilmington PA-NJ-DE PM2.5 1997 annual and 2006 24-hour PM2.5 nonattainment areasDecember 26, 2012 and supplemented on May 3, 2013September 4, 2013, 78 FR 54396
    2007 Annual Attainment Inventory for PM2.5 and the associated PM2.5 precursorsNew Jersey portion of the New York-Northern New Jersey-Long Island NY-NJ-CT and New Jersey portion of the Philadelphia-Wilmington PA-NJ-DE PM2.5 1997 annual and 2006 24-hour PM2.5 nonattainment areasDecember 26, 2012 and supplemented on May 3, 2013September 4, 2013, 78 FR 54396
    2017 (Interim) and 2025 PM2.5 and NOX Annual Projection InventoriesNew Jersey portion of the New York-Northern New Jersey-Long Island NY-NJ-CT and New Jersey portion of the Philadelphia-Wilmington PA-NJ-DE PM2.5 1997 annual and 2006 24-hour PM2.5 nonattainment areasDecember 26, 2012 and supplemented on May 3, 2013September 4, 2013, 78 FR 54396
    2009 and 2025 PM2.5 and NOX Annual Emissions Motor Vehicle Emission BudgetsNew Jersey portion of the New York-Northern New Jersey-Long Island NY-NJ-CT and New Jersey portion of the Philadelphia-Wilmington PA-NJ-DE PM2.5 1997 annual and 2006 24-hour PM2.5 nonattainment areasDecember 26, 2012 and supplemented on May 3, 2013September 4, 2013, 78 FR 54396
    CO Limited Maintenance PlanNew Jersey portion of the New York-Northern New Jersey-Long Island CO nonattainment areaJune 11, 2015 and February 2016July 1, 2016, 81 FR 43096
    2007 CO Attainment inventoryNew Jersey portion of the New York-Northern New Jersey-Long Island CO nonattainment areaJune 11, 2015 and February 2016July 1, 2016, 81 FR 43096
    2011 VOC, NOX and CO ozone summer season and annual emissions inventoryNew York-Northern New Jersey-Long Island and the Philadelphia-Wilmington-Atlantic City ozone nonattainment areasJune 1, 2015September 21, 2017, 82 FR 44099
    2011 PM2.5/Regional Haze and associated precursors annual emissions inventoryState-wideJune 1, 2015September 21, 2017, 82 FR 44099
    Regional Haze Five-Year Progress ReportState-wideJune 28, 2016September 29, 2017, 82 FR 45472
    NJ Infrastructure SIP for the 2008 Lead, 2008 Ozone, 2010 Nitrogen Dioxide, 2010 Sulfur Dioxide, 2011 Carbon Monoxide, 2006 PM10, 2012 PM2.5, 1997 Ozone, and the 1997 and 2006 PM2.5 StandardsState-wideOctober 17, 2014 and supplemented on March 15, 2017May 30, 2018, 83 FR 24661
    NJ Infrastructure SIP for the 2012 PM2.5 NAAQS; Interstate Transport ProvisionsState-wideOctober 17, 2014August 14, 2018, 83 FR 40151This action addresses the following CAA elements: 110(a)(2)(D)(i)(I) prongs 1 and 2.
    2008 8-hour Ozone RACT AnalysisStatewideJune 11, 2015 and January 2, 2018October 9, 2018, 83 FR 50506• Full approval. Includes CTGs, NOX RACT for major sources and non-CTG RACT sources.
    2008 8-hour Ozone Specific Nonattainment New Source Review RequirementsStatewideJanuary 2, 2018October 9, 2018, 83 FR 50506• Full approval.
    2008 8-hour Ozone Nonattainment Emission Statement Program CertificationStatewideJanuary 2, 2018October 9, 2018, 83 FR 50506• Full approval.
    2008 8-hour Ozone Nonattainment Motor Vehicle Enhanced Inspection and Maintenance (I/M) Program CertificationStatewideJanuary 2, 2018October 9, 2018, 83 FR 50506• Full approval.
    NJ Infrastructure SIP for the 2006 PM10, 2008 Lead, 2010 Nitrogen Dioxide, and the 2011 Carbon Monoxide NAAQS; Interstate Transport ProvisionsState-wideOctober 17, 2014May 14, 2020, 85 FR 28883This action addresses the following CAA elements: 110(a)(2)(D)(i)(I) prongs 1 and 2.
    1997 8-hour Ozone—Attainment DemonstrationNew Jersey portion of the New York-Northern New Jersey-Long Island, NY-NJ-CT 8-hour ozone moderate nonattainment area1/2/20189/2/2021, 86 FR 49249• Full approval.
    • This action addresses the attainment demonstration requirements of the May 4, 2016 SIP Call (81 FR 26697).
    2011 VOC, NOX and CO ozone summer season and annual emission inventoryNorthern New Jersey portion of the New York-Northern New Jersey-Long Island NY-NJ-CT 8-hour ozone nonattainment areaNovember 23, 2021August 16, 2023, 88 FR 55576• Full approval.
    • The inventory contains point, nonpoint, nonroad and on-road.
    2011 base year emissions inventoryState-wideNovember 23, 2021August 16, 2023, 88 FR 55576• Full approval.
    • The inventory contains point, nonpoint, nonroad, on-road and biogenic source data.
    2017 VOC, NOX and CO ozone summer season daily and annual emission inventoryNorthern New Jersey portion of the New York-Northern New Jersey-Long Island NY-NJ-CT 8-hour ozone nonattainment areaNovember 23, 2021August 16, 2023, 88 FR 55576• Full approval.
    • The inventory contains point, nonpoint, nonroad, on-road and biogenic source data.
    2017 VOC, NOX and CO ozone summer season daily and annual emission inventorySouthern New Jersey portion of the Philadelphia-Wilmington-Atlantic City, PA-NJ-MD-DE 8-hour ozone nonattainment areaNovember 23, 2021August 16, 2023, 88 FR 55576• Full approval.
    • The inventory contains point, nonpoint, nonroad, on-road and biogenic source data.
    2017 base year emissions inventoryState-wideNovember 23, 2021August 16, 2023, 88 FR 55576• Full approval.
    • The inventory contains point, nonpoint, nonroad, on-road and biogenic source data.
    2017 PM2.5/Regional Haze associated precursor annual emission inventoryState-wideNovember 23, 2021August 16, 2023, 88 FR 55576• Full approval.
    • The inventory contains point, nonpoint, nonroad, on-road and biogenic source data.
    1971 Sulfur Dioxide Redesignation Request and Maintenance Plan for the Warren County AreaNew Jersey portion of the Northeast Pennsylvania-Upper Delaware Valley Interstate Air Quality Control Region (Warren County, New Jersey)November 15, 2021October 2, 2023, 88 FR 67651• Full approval.
    Regional Haze Plan from 2018-2028State-wideMarch 26, 2020 as supplemented on September 8, 2020 and April 1, 2021November 16, 2023, 88 FR 78650• Full approval.
    • New Jersey has met the Regional Haze Rule requirements for the 2nd implementation period.
    NJ Infrastructure SIP for the 2015 ozone NAAQSStatewideMay 13, 2019August 9, 2024, 89 FR 65214• Full approval.
    • This action addresses the following CAA elements: 110(a)(2)(A), (B), (C) (enforcement program only), (D)(i)(II) prong 4 (visibility), (E), (F), (G), (H), (J) (consultation and public notification only), (K), (L), and (M).
    2008 8-hour Ozone Reasonable Further Progress Plan (RFP) for milestone year 2017; 2017 motor vehicle emission budgets used for planning purposesNew Jersey portion of the New York-Northern New Jersey-Long Island NY-NJ-CT 8-hour ozone nonattainment area1/2/2018September 4, 2024, 89 FR 71826• Full approval.
    2008 8-hour Ozone Reasonable Further Progress Plan (RFP) for milestone year 2020; 2020 motor vehicle emission budgets used for planning purposesNew Jersey portion of the New York-Northern New Jersey-Long Island NY-NJ-CT 8-hour ozone nonattainment area11/23/2021September 4, 2024, 89 FR 71826• Full approval.
    2008 8-hour Ozone Serious Nonattainment New Source Review Requirements CertificationNew Jersey portion of the New York-Northern New Jersey-Long Island NY-NJ-CT 8-hour ozone nonattainment area11/23/2021September 4, 2024, 89 FR 71826• Full approval.
    2008 8-hour Ozone Serious Emission Statement Program CertificationNew Jersey portion of the New York-Northern New Jersey-Long Island NY-NJ-CT 8-hour ozone nonattainment area11/23/2021September 4, 2024, 89 FR 71826• Full approval.
    2008 8-hour Ozone Clean Fuel for FleetsNew Jersey portion of the New York-Northern New Jersey-Long Island NY-NJ-CT 8-hour ozone nonattainment area11/23/2021September 4, 2024, 89 FR 71826• Full approval.
    2015 8-hour Ozone Marginal Nonattainment New Source Review Requirements CertificationNew Jersey portion of the Philadelphia-Wilmington-Atlantic City, PA-NJ-MD-DE, 8-hour ozone nonattainment area11/23/2021September 4, 2024, 89 FR 71826• Full approval.
    2015 8-hour Ozone Moderate Nonattainment New Source Review Requirements CertificationNew Jersey portion of the New York-Northern New Jersey-Long Island NY-NJ-CT 8-hour ozone nonattainment area11/23/2021September 4, 2024, 89 FR 71826• Full approval.
    • Certifies New Jersey's commitment to implement NNSR requirements statewide within the Ozone Transport Region (OTR) for the 2015 Ozone NAAQS.
    2015 8-hour Ozone Nonattainment New Source Review Requirements OTR CertificationState-wide11/23/2021September 4, 2024, 89 FR 71826• Full approval.
    • Certifies New Jersey's commitment to implement NNSR requirements statewide within the Ozone Transport Region (OTR) for the 2015 Ozone NAAQS.
    2015 8-hour Ozone Marginal nonattainment emission inventoryNew Jersey portion of the Philadelphia-Wilmington-Atlantic City, PA-NJ-MD-DE, 8-hour ozone nonattainment area11/23/2021September 4, 2024, 89 FR 71826• Full approval.
    2015 8-hour Ozone Moderate nonattainment emission inventoryNew Jersey portion of the New York-Northern New Jersey-Long Island NY-NJ-CT 8-hour ozone nonattainment area11/23/2021September 4, 2024, 89 FR 71826• Full approval.
    NJ Infrastructure SIP for the 2010 Sulfur Dioxide NAAQS; Interstate Transport ProvisionsStatewideOctober 17, 2014September 6, 2024, 89 FR 72721• Full approval.
    • This action addresses the following CAA elements: 110(a)(2)(D)(i)(I) prongs 1 and 2.

    [82 FR 30760, July 3, 2017, as amended at 82 FR 37310, Aug. 10, 2017; 82 FR 44101, Sept. 21, 2017; 82 FR 45473, Sept. 29, 2017; 83 FR 21176, May 9, 2018; 83 FR 24663, May 30, 2018; 83 FR 40152, Aug. 14, 2018; 83 FR 50509, Oct. 9, 2018; 84 FR 24982, May 30, 2019; 84 FR 54789, Oct. 11, 2019; 85 FR 28887, May 14, 2020; 85 FR 36751, June 18, 2020; 85 FR 68472, Oct. 29, 2020; 86 FR 9859, Feb. 17, 2021; 86 FR 49251, Sept. 2, 2021; 87 FR 46891, Aug. 1, 2022; 88 FR 55577, Aug. 16, 2023; 88 FR 67653, Oct. 2, 2023; 88 FR 78654, Nov. 16, 2023; 88 FR 83038, Nov. 28, 2023; 88 FR 87933, Dec. 20, 2023; 89 FR 65216, Aug. 9, 2024; 89 FR 71188, Sept. 3, 2024; 89 FR 71829, Sept. 4, 2024; 89 FR 72723, Sept. 6, 2024]