§ 52.2620 - Identification of plan.  


Latest version.
  • § 52.2620 Identification of plan.

    (a) Purpose and scope. This section sets forth the applicable State Implementation Plan for Wyoming under section 110 of the Clean Air Act, 42 U.S.C. 7410 and 40 CFR part 51 to meet national ambient air quality standards or other requirements under the Clean Air Act.

    (b) Incorporation by reference.

    (1) Material listed in paragraphs (c) and (d) of this section with an EPA approval date prior to September 1, 2015, was approved for incorporation by reference by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Material is incorporated as it exists on the date of the approval, and notice of any change in the material will be published in the Federal Register. Entries in paragraphs (c) and (d) of this section with EPA approval dates after September 1, 2015, will be incorporated by reference in the next update to the SIP compilation.

    (2) EPA Region 8 certifies that the rules/regulations provided by EPA in the SIP compilation at the addresses in paragraph (b)(3) of this section are an exact duplicate of the officially promulgated state rules/regulations which have been approved as part of the SIP as of September 1, 2015.

    (3) Copies of the materials incorporated by reference may be inspected at the EPA Region 8 Office, Office of Partnerships and Regulatory Assistance (OPRA), Air Program, 1595 Wynkoop Street, Denver, Colorado 80202–1129 and at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call (202) 741–6030, or go to: www.archives.gov/federal-register/cfr/ibr-locations.html.

    (c) EPA-approved regulations.

    Rule No. Rule title State
    effective
    date
    EPA
    Effective
    date
    Final rule citation/date Comments
    Chapter 01. Common Provisions.
    Section 02Authority10/29/19998/27/200469 FR 44965, 7/28/04
    Section 03Definitions2/14/201312/23/201378 FR 69998, 11/22/13
    Section 04Diluting and concealing emissions10/29/19998/27/200469 FR 44965, 7/28/04
    Section 05Unavoidable equipment malfunction1/30/20066/15/201075 FR 19886, 4/16/10
    Section 06Credible Evidence12/8/20006/15/201075 FR 19886, 4/16/10
    Section 07Greenhouse gasses2/14/201312/23/201378 FR 69998, 11/22/13
    Chapter 02. Ambient Standards.
    Section 02Ambient standards for particulate matter9/7/201010/27/201479 FR 50840, 8/26/14All, except Section 02(b) and (c).
    Section 02 (b), (c), and (d)Ambient standards for particulate matter10/13/201511/14/2016.81 FR 70364, 10/12/2016
    Section 03Ambient standards for nitrogen oxides12/19/201211/14/201479 FR 54910, 9/15/14
    Section 04Ambient standards for sulfur oxides10/29/19998/27/200469 FR 44965, 7/28/04
    Section 05Ambient standards for carbon monoxide10/29/19998/27/200469 FR 44965, 7/28/04
    Section 06Ambient Standards for ozone12/20/201610/22/201883 FR 47565, 9/20/2018
    Section 08Ambient standards for suspended sulfates10/29/19998/27/200469 FR 44965, 7/28/04
    Section 10Ambient standards for lead9/7/201010/27/201479 FR 50840, 8/26/14
    Section 12Incorporation by reference2/5/201810/22/201883 FR 47565, 9/20/2018
    Chapter 03. General Emission Standards.
    Section 02Emission standards for particulate matter11/22/201311/20/201479 FR 62859, 10/21/14
    Section 03Emission standards for nitrogen oxides12/20/201610/22/201883 FR 47565, 9/20/2018
    Section 04Emission standards for sulfur oxides10/29/19998/27/200469 FR 44965, 7/28/04
    Section 05Emission standards for carbon monoxide10/29/19998/27/200469 FR 44965, 7/28/04
    Section 06Emission standards for volatile organic compounds10/29/19998/27/200469 FR 44965, 7/28/04
    Section 09Incorporation by reference2/5/201810/22/201883 FR 47565, 9/20/2018
    Chapter 04. State Performance Standards for Specific Existing Sources.
    Section 02Existing sulfuric acid production units10/29/19998/27/200469 FR 44965, 7/28/04
    Section 03Existing nitric acid manufacturing plants10/29/19998/27/200469 FR 44965, 7/28/04
    Chapter 06. Permitting Requirements.
    Section 02Permit requirements for construction, modification, and operation10/29/19998/27/200469 FR 44965, 7/28/04
    Section 04Prevention of significant deterioration12/20/201610/22/201883 FR 47565, 9/20/18
    Section 13Nonattainment new source review permit requirements10/13/20157/5/20166/2/2016, 81 FR 35273
    Section 14Incorporation by reference2/5/201810/22/201883 FR 47565, 9/20/18
    Chapter 07. Monitoring Regulations.
    Section 02Continuous monitoring requirements for existing sources10/29/19998/27/200469 FR 44965, 7/28/04
    Chapter 08. Non-attainment Area Regulations.
    Section 02Sweetwater County particulate matter regulations10/29/19998/27/200469 FR 44965, 7/28/04
    Section 03Conformity of general federal actions to state implementation plans2/5/201810/22/201883 FR 47565, 9/20/18
    Section 05Ozone nonattainment emission inventory rule11/22/201310/24/2016.81 FR 58399, 8/25/16
    Section 10Incorporation by reference2/5/201810/22/201883 FR 47565, 9/20/18
    Chapter 09. Visibility Impairment/PM Fine Control.
    Section 02Visibility10/29/19998/27/200469 FR 44965, 7/28/04
    Chapter 10. Smoke Management.
    Section 02Open burning restrictions10/29/19998/27/200469 FR 44965, 7/28/04
    Section 03Wood waste burners10/29/19998/27/200469 FR 44965, 7/28/04
    Section 04Smoke management requirements4/5/20051/11/201377 FR 73926, 12/12/12
    Chapter 12. Emergency Controls.
    Section 02Air pollution emergency episodes10/29/19998/27/200469 FR 44965, 7/28/04
    Chapter 13. Mobile Sources.
    Section 02Motor vehicle pollution control10/29/19998/27/200469 FR 44965, 7/28/04
    Chapter 14. Emission Trading Program Regulations.
    Section 2Western backstop sulfur dioxide trading program5/7/20081/11/201377 FR 73926, 12/12/12
    Section 3Sulfur dioxide milestone inventory2/5/20186/19/201984 FR 22725, 5/20/2019
    App AWeb Chapter 14, Section 2 Monitoring Protocols5/7/20081/11/201377 FR 73926, 12/12/12
    Chapter I. General Rules of Practice and Procedure.
    Section 16Air Quality Division, State Implementation Plan4/21/20165/25/201782 FR 18994, 4/25/2017CAA section 128 Requirements.

    (d) EPA-approved source specific requirements.

    Regulation Rule title State
    effective
    date
    EPA
    Effective
    date
    Final rule citation/date Comments
    Black Hills Power and LightOrder containing schedule for compliance, interim requirements, and monitoring and reporting requirements4/25/19798/1/197944 FR 38473, 7/2/79
    FMC CorporationOrder containing schedule for compliance, interim requirements, and monitoring and reporting requirements4/25/19798/1/197944 FR 38473, 7/2/79
    Naughton Unit 3Air Quality SIP Permits containing BART Alternative requirements, MD–15946 and P0021110Nov. 28, 2017Apr. 22, 2019.84 FR 10435,3/21/19Only the following permit provisions: NOX and PM emission limits (MD–15946 condition 5, for lb/hr and tons/year emission limits; P0021110, condition 7, for lb/MMbtu emission limits); emission limit compliance dates (P0021110, condition 7; MD–15946, conditions 5 and 6); heat input limit and compliance date (P0021110, condition 18); compliance date for coal pulverizers to be removed from service (P0021110, condition 19); and associated monitoring, recordkeeping, and reporting requirements (P0021110, conditions 4, 6, 8, 9, 10, 11, 12, 13, 14, 17, 18, 19, 21, and 24).

    (e) EPA-approved nonregulatory provisions.

    Rule No. Rule title State
    effective
    date
    EPA
    Effective
    date
    Final rule citation/date Comments
    (01) IIntroduction1/22/19726/30/197237 FR 10842, 5/31/72
    (02) IILegal Authority2/19/19769/30/197641 FR 36652, 8/31/76
    (03) IIIControl Strategy8/30/198411/11/198449 FR 39843, 10/11/84
    (04) IVCompliance Schedule5/29/19738/2/197339 FR 24504, 7/03/73
    (05) VEmergency Episode Plan8/26/19814/12/198147 FR 5892, 2/09/81
    (06) VIAir Quality Surveillance12/13/19889/9/198855 FR 28197, 7/10/88
    (07) VIIReview of New Sources and Modifications1/22/19726/30/197237 FR 10842, 5/31/72
    (08) VIIISource Surveillance1/22/19726/30/197237 FR 10842, 5/31/72
    (09) IXResources1/22/19726/30/197237 FR 10842, 5/31/72
    (10) XIntergovernmental Cooperation1/22/19726/30/197237 FR 10842, 5/31/72
    (11) XIReports and Revisions1/22/19726/30/197237 FR 10842, 5/31/72
    (12) XIIVisibility Protection Class I9/6/19883/17/198954 FR 6912, 2/15/89
    (13) XIIISweetwater PM10 Attainment Plan1/25/19798/1/197944 FR 38473, 7/02/79
    (14) XIVStack Height Good Engineering Practice12/9/19884/16/198954 FR 11186, 3/17/89
    (15) XVSmall Business Assistance Program11/30/19938/19/199459 FR 31548, 6/20/94
    (16) XVICity of Sheridan—PM10 Air Quality Control and Maintenance Plan10/30/19907/25/199459 FR 32360, 6/23/94
    (17) XVIIPSD Implementation for NOx11/20/19906/23/199156 FR 23811, 5/24/91
    (18) XVIIIInterstate Transport, Wyoming Interstate Transport SIP satisfying the requirement of Section 110(a)(2)(D)(i) of the CAA for the 1997 8-hour ozone and PM2.5 standards4/15/20087/7/200873 FR 26019, 5/8/08
    (19) XIXPowder River Basin PM10 Memorandum of Agreement12/22/199310/11/199560 FR 47290, 9/12/95
    (20) XXAddressing Regional Haze Visibility Protection For The Mandatory Federal Class I Areas Required Under 40 CFR 51.3094/5/20186/19/201984 FR 22725, 5/20/2019
    (21) XXIInfrastructure SIP for Section 110(a)(2)—1997 PM2.5 NAAQS3/26/200812/6/201378 FR 73445, 12/06/13
    (22) XXIIInfrastructure SIP for Section 110(a)(2)—2006 PM2.5 NAAQS8/19/20119/9/201580 FR 47857, 8/10/2015
    (23) XXIIIInfrastructure SIP for Section 110(a)(2)—1997 Ozone NAAQ12/10/20098/24/201176 FR 44265, 7/25/11
    (24) XXIVAir Quality Control Regions and Emissions Inventory1/22/19726/30/197237 FR 10842, 5/31/72
    (25) XXVWyoming State Implementation Plan for Regional Haze for 309(g)1/12/20113/3/201479 FR 5032, 1/30/14Excluding portions of the following: Chapters 6.4, 6.5.7, 6.5.8, and 7.5. EPA disapproved (1) the NOX BART determinations for (a) Laramie River Units 1–3, (b) Dave Johnston Unit 3, and (c) Wyodak Unit 1; (2) the State's monitoring, recordkeeping, and reporting requirements for BART units; and (3) the State's reasonable progress goals.
    (26)XXVIInfrastructure SIP for Section 110(a)(2)(C) and (D)(i)(II) prong 3 for 2008 Ozone NAAQS02/06/201411/14/2016.81 FR 70364, 10/12/2016 Only includes 111(a)(2)(C) and (D)(i)(II) prong 3 for 2008 Ozone NAAQS.
    (27) XXVIIInterstate transport SIP for Section 110(a)(2)(D)(i) prong 1–2008 Ozone NAAQS; prongs 1, 2 and 4–2008 Pb NAAQS; prong 1 and 2–2010 NO2 NAAQS; prong 4–2010 SO2 NAAQS2/6/2014; 10/12/2011; 1/24/2014; 3/6/20153/6/201782 FR 9154, 2/3/17
    (28) XXVIIIInfrastructure SIP for Section 110(a)(2)— 2008 Lead, 2008 Ozone, 2010 NO2, 2010 SO2, and 2012 PM2.5 NAAQS10/12/2011, 2/6/2014, 1/24/2014, 3/6/2015, and 6/24/20165/25/201782 FR 18994, 4/25/17
    (29) XXIXSheridan 1987 PM10 Limited Maintenance Plan12/14/20155/4/201883 FR 14374, 4/4/18
    (30) XXXInterstate transport SIP for Section 110(a)(2)(D)(i)(I) prongs 1 and 2 for the 2012 PM2.5 NAAQS6/24/20168/6/201883 FR 31330, 7/5/2018
    (31) XXXIInterstate transport SIP for Section 110(a)(2)(D)(i)(I) prongs 1 and 2 for the 2010 SO2 NAAQS.3/6/201510/1/201883 FR 44503, 8/31/2018
    (32) XXXIIWyoming State Implementation Plan 5-Year Progress Report for Regional Haze11/17/20177/27/202085 FR 38327, 6/26/2020
    (33) XXXIIIInterstate transport SIP for Section 110(a)(2)(D)(i)(I) prong 2 for the 2008 Ozone NAAQSAugust 30, 20185/10/201984 FR 14271, 4/10/2019
    (34) XXXIVInfrastructure SIP for section 110(a)(2)—2015 Ozone NAAQS1/3/20193/25/202085 FR 10306, 2/24/2020The EPA is not acting on (D)(i)(I) Prong 1, and (D)(i)(I) Prong 2. The EPA is disapproving (D)(i)(II) Prong 4.
    (35) XXXVInterstate transport SIP for section 110(a)(2)(D)(i)(I) prongs 1 and 2 for the 2015 Ozone NAAQS1/3/20191/18/202488 FR 87723, 12/19/2023

    [71 FR 64462, Nov. 2, 2006, as amended at 73 FR 26025, May 8, 2008; 73 FR 40752, July 16, 2008; 75 FR 19890, Apr. 16, 2010; 76 FR 44270, July 25, 2011; 77 FR 73933, Dec. 12, 2012; 78 FR 49690, Aug. 15, 2013; 78 FR 70000, Nov. 22, 2013; 78 FR 73448, Dec. 6, 2013; 79 FR 5219, Jan. 30, 2014; 79 FR 50843, Aug. 26, 2014; 79 FR 54912, Sept. 15, 2014; 79 FR 62861, Oct. 21, 2014; 80 FR 9201, Feb. 20, 2015; 80 FR 47859, Aug. 10, 2015; 80 FR 45609, July 31, 2015; 80 FR 68769, Nov. 6, 2015; 81 FR 35273, June 2, 2016; 81 FR 58399, Aug. 25, 2016; 81 FR 70364, Oct. 12, 2016; 82 FR 9154, Feb. 3, 2017; 82 FR 18994, Apr. 25, 2017; 83 FR 14374, Apr. 4, 2018; 83 FR 31330, July 5, 2018; 83 FR 44503, Aug. 31, 2018; 83 FR 47565, Sept. 20, 2018; 84 FR 10435, Mar. 21, 2019; 84 FR 14271, Apr. 10, 2019; 84 FR 22725, May 20, 2019; 85 FR 10306, Feb. 24, 2020; 85 FR 38327, June 26, 2020; 88 87723, Dec. 19, 2023]