§ 3263.11 - What information must I give BLM to approve my Sundry Notice for abandoning a well?  


Latest version.
  • § 3263.11 What information must I give BLM to approve my Sundry Notice for abandoning a well?

    Send us a Sundry Notice with:

    (a) All the information required in the well completion report (see § 3264.10), unless we already have that information;

    (b) A detailed description of the proposed work, including:

    (1) Type, depth, length, and interval of plugs;

    (2) Methods you will use to verify the plugs (tagging, pressure testing, etc.);

    (3) Weight and viscosity of mud that you will use in the uncemented portions;

    (4) Perforating or removing casing; and

    (5) Restoring the surface; and

    (c) Any other information that we may require.