Code of Federal Regulations (Last Updated: July 5, 2024) |
Title 49 - Transportation |
Subtitle B - Other Regulations Relating to Transportation |
Chapter II - Federal Railroad Administration, Department of Transportation |
Part 236 - Rules, Standards, and Instructions Governing the Installation, Inspection, Maintenance, and Repair of Signal and Train Control Systems, Devices, and Appliances |
Subpart E - Automatic Train Stop, Train Control and Cab Signal Systems |
Inspection and Tests; Locomotive |
§ 236.588 - Periodic test.
Latest version.
-
§ 236.588 Periodic test.
Except as provided in § 236.586, periodic test of the automatic train stop, train control, or cab signal apparatus shall be made at least once every 92 days, and on multiple-unit cars as specified by the carrier, subject to approval by the FRA.
[49 FR 3387, Jan. 26, 1984]