§ 1304.403 - Marina sewage pump-out stations and holding tanks.  


Latest version.
  • § 1304.403 Marina sewage pump-out stations and holding tanks.

    All pump-out facilities constructed after September 8, 2003 shall meet the following minimum design and operating requirements:

    (a) Spill-proof connection with shipboard holding tanks;

    (b) Suction controls or vacuum breaker capable of limiting suction to such levels as will avoid collapse of rigid holding tanks;

    (c) Available fresh water facilities for tank flushing;

    (d) Check valve and positive cut-off or other device to preclude spillage when breaking connection with vessel being severed;

    (e) Adequate interim storage where storage is necessary before transfer to approved treatment facilities;

    (f) No overflow outlet capable of discharging effluent into the reservoir;

    (g) Alarm system adequate to notify the operator when the holding tank is full;

    (h) Convenient access to holding tanks and piping system for purposes of inspection;

    (i) Spill-proof features adequate for transfer of sewage from all movable floating pump-out facilities to shore-based treatment plants or intermediate transfer facilities;

    (j) A reliable disposal method consisting of:

    (1) An approved upland septic system that meets TVA, State, and local requirements; or

    (2) Proof of a contract with a sewage disposal contractor; and

    (k) A written statement to TVA certifying that the system shall be operated and maintained in such a way as to prevent any discharge or seepage of wastewater or sewage into the reservoir.