§ 183.2 - Other preliminary survey and investigation charges.  


Latest version.
  • A. This account shall be charged with all expenditures for preliminary surveys, plans, investigations, etc., made for the purpose of determining the feasibility of utility projects under contemplation, other than the acquisition of land and land rights to provide a future supply of natural gas. If construction results, this account shall be credited and the appropriate utility plant account charged. If the work is abandoned, the charge shall be made to account 426.5, Other Deductions, or the appropriate operating expense account.

    B. This account shall also include costs of studies and analyses mandated by regulatory bodies related to plant in service. If construction results from such studies, this account shall be credited and the appropriate utility plant account charged with an equitable portion of such study costs directly attributible to new construction. The portion of such study costs not attributible to new construction or the entire cost if construction does not result shall be charged to account 182.2, Unrecovered Plant and Regulatory Study Costs, or the appropriate operating expense account. The costs of such studies relative to plant under construction shall be included directly in account 107, Construction Work in Progress—Gas.

    C. The records supporting the entries to this account shall be so kept that the utility can furnish complete information as to the nature and the purpose of the survey, plans, or investigations and the nature and amounts of the several charges.

    Note:

    The amount of preliminary survey and investigation charges transferred to utility plant shall not exceed the expenditures which may reasonably be determined to contribute directly and immediately and without duplication to utility plant.