§ 362.103 - Cost of property added.  


Latest version.
  • (a) The amounts reported as the cost of property added shall be only those that affect the investment in road and equipment except as hereafter provided with respect to lands, miscellaneous physical property, and cost of road acquired through purchase, merger, consolidation or reorganization, and reconstruction of road so acquired.

    (b) The cost reported need be only the total cost of each structure as defined in § 362.121, the total cost for each mass account as defined in § 362.120 of the instructions, or as prescribed by the subschedules.

    (c) Except that when changes are reported under the unit designation “lot,” the cost applicable to such unit shall be also reported.

    (d) The costs to be reported for betterments shall be computed in accordance with the rules in the effective accounting regulations. With respect to costs to be reported for track changes in connection with betterments applied, the costs to be reported for account 9, Rails, shall be the cost of the excess in weight of heavier rails laid in replacement of lighter rails; for account 10. Other track material, the excess cost of heavier or improved track material; and for account 11, Ballast, the excess cost of improved ballast. (Added by order of April 17, 1976.)

    (e) A supplemental Form No. 588-R shall be filed for account 9, Rails, account 10, Other track material, and account 11, Ballast, bringing the property costs, as shown in the valuation records of the Commission, into conformity with the costs recorded in the books of account pursuant to revised Instruction 2-19 of the accounting regulations. Carriers which recorded costs as shown in valuation records in their books of account at time of reorganizations shall file a supplemental Form 588-R for the period subsequent to the reorganization.