§ 115.28 - Application for approval.  


Latest version.
  • § 115.28 Application for approval.

    Each application by a manufacturer or an owner for certification of a container by design type must include:

    (a) Three copies, each no larger than 3 feet by 4 feet, of the customs and TIR/Container plan;

    (b) Customs and TIR/Container plan number;

    (c) Three copies of the specifications which include the following information:

    (1) The name and address of the manufacturer and the owner; and

    (2) A description of the container including the -

    (i) Type of construction;

    (ii) Dimensions;

    (iii) Material of construction;

    (iv) Coating system used;

    (v) Identification marks and numbers; and

    (vi) Tare weight;

    (d) The location and date for inspection; and

    (e) A statement signed by the manufacturer that:

    (1) A container of the design type concerned is available for inspection and approval by the Certifying Authority before, during, and after the production run;

    (2) Notification will be given to the Certifying Authority of each change in the design before adoption; and

    (3) Each container will be marked with:

    (i) The metal plate required in § 115.32;

    (ii) The identification number or letter of the design type assigned by the manufacturer; and

    (iii) The serial number of the container assigned by the manufacturer.