§ 476.310 - Proposals for substitute public mass transit and highway projects.  


Latest version.
  • (a) The proposed substitute projects must serve the urbanized area or connecting nonurbanized area corridor, or both, from which the Interstate segment was withdrawn.

    (b) Substitute projects in or serving urbanized areas shall be based on an urban transportation planning process in accordance with 23 CFR part 450, subpart A (and policies and regulations pertaining thereto), and shall be selected by the responsible local officials of the urbanized area in accordance with 23 CFR part 450, subpart B. Substitute projects located outside but serving the urbanized area shall also have the concurrence of the responsible local officials of the jurisdiction in which the project is located.

    (c) Substitute projects in or serving the nonurbanized area corridor shall be selected by the responsible local officials of the nonurbanized area corridor. Substitute projects located outside but serving the nonurbanized area corridor shall also have the concurrence of the responsible local officials of the jurisdiction in which the project is located.

    (d) Applications for substitute nonhighway public mass transit projects shall be developed either by the principal elected officials of general purpose local units of government in consultation with local transit officials or by local transit officials. Substitute highway projects shall be developed in accordance with the policies and procedures established for the Federal-aid highway system of which they will be a part. Substitute highway projects need not appear in the statewide Federal-aid program described in 23 CFR part 630, subpart A.

    (e) Applications for substitute nonhighway public mass transit projects are submitted to the Urban Mass Transportation Administrator by the Governor. Requests for authorization to proceed with substitute highway projects are submitted to the Federal Highway Administrator by the Governor.

    (f) After September 30, 1983, only applications for those substitute projects which have previously received concept approval under § 476.308 should be submitted.

    (g) Substitute projects (for which sufficient funds are available) must be under construction or under contract for construction by September 30, 1986. This time limitation is applicable to all substitute projects, including those related to Interstate segments which were under court injunction prohibiting construction on November 6, 1978. Approval for substitute projects not meeting this requirement will be withdrawn or not issued, and no funds will be appropriated or authorized for these projects.