Code of Federal Regulations (Last Updated: October 10, 2024) |
Title 23 - Highways |
Chapter I - Federal Highway Administration, Department of Transportation |
SubChapter G - Engineering and Traffic Operations |
Part 636 - Design-Build Contracting |
Subpart B - Selection Procedures, Award Criteria |
§ 636.208 - May I use my existing prequalification procedures with design-build contracts?
Latest version.
-
§ 636.208 May I use my existing prequalification procedures with design-build contracts?
Yes, you may use your existing prequalification procedures for either construction or engineering design firms as a supplement to the procedures in this part.