§ 171.5 - Delivery points.  


Latest version.
  • (a) Project operators will deliver irrigation water to one point on the boundary of each farm unit within the irrigation project. The Officer-in-Charge may establish additional delivery points when in his judgment it is impractical for the landowner to irrigate his farm unit from the one delivery point for such reasons as topography, isolation, or cost. When irrigation water is supplied from wells, the delivery point may be established at the well head. Where portions of a farm unit lie at an elevation too high to be watered by gravity flow from the normal elevation of water in the proj-ect distribution system, no change will be made in the water level elevation of the project system so as to place water on such land. Where such land has been included in the project, the landowner may install and operate pumping equipment at his own expense to raise the water to such included land from a point designated by the Officer-in-Charge and in accordance with his specifications. If the landowner so installs pumping equipment and pays the construction and maintenance charges, the project will deliver the same amount of water per acre for this land as the project delivers at the delivery point for other lands on the project.

    (b) If a farm unit for which a project delivery point has been established is subsequently subdivided into smaller units by the owner or owners of the farm unit, the following provisions apply:

    (1) A plat or map of the subdivision must be recorded and a copy filed with the Officer-in-Charge. The plat or map must show how the irrigation water is to be delivered to the irrigable acres in the subdivision.

    (2) No further extensions or alterations in the project's system will be provided officials to serve the subdivided units, except as agreed to by the Officer-in-Charge and at the landowner's expense.

    (3) Any additional construction necessary to deliver irrigation water to these units must be mutually worked out between the original owner of the farm units and the new owners of the subdivided unit at their expense.

    (4) The project will not bear any responsibility for the operation and maintenance of such internal systems, or the division of irrigation water after it is delivered to the established proj-ect delivery points.

    (c) Where project points of delivery have been established for farm units which are to be combined under lease or ownership into a singular farm unit to be irrigated by means of a sprinkler of more efficient system, the Officer-in-Charge may approve the removal or relocation of project delivery facilities. Such reorganization shall be at the expense of the landowners or lessees in conformance with established project standards and a time schedule which will not disrupt water delivery service to others on the system.

    (d) Where a reorganization has been approved and established as in § 171.5(c), any reversion requiring reestablishment of removed or relocated project delivery facilities must be approved by the Officer-in-Charge and conform to established project standards and time schedules which will not disrupt water delivery service to other water users on the system. All expenses incurred shall be the responsibility of the landowners or lessees.