§ 216.56 - Production Allocation Schedule Report.  


Latest version.
  • (a) Any operator of an offshore Facility Measurement Point (FMP) handling production from a Federal lease or federally-approved agreement that is commingled (with approval) with production from any other source prior to measurement for royalty determination must file a Production Allocation Schedule Report (Form MMS-4058). This report is not required whenever all of the following conditions are met:

    (1) All leases involved are Federal leases;

    (2) All leases have the same fixed royalty rate;

    (3) All leases are operated by the same operator;

    (4) The facility measurement device is operated by the same person as the leases/agreements;

    (5) Production has not been previously measured for royalty determination; and

    (6) The production is not subsequently commingled and measured for royalty determination at an FMP for which Form MMS-4058 is required under this part.

    (b) You must submit a Production Allocation Schedule Report, Form MMS-4058, for each calendar month beginning with the month in which you first handle production covered by this section.

    (c) MMS must receive your Form MMS-4058 according to the following table:

    If you submit your Form MMS-4054 . . .We must receive your Form MMS-4058 by . . .(1) Electronically The 25th day of the second month following the month for which you are reporting.(2) Other than electronically The 15th day of the second month following the month for which you are reporting.