§ 280.8 - Reporting.  


Latest version.
  • (a) The permittee shall submit a status report to the Director within 30 days of the close of each calendar quarter or more frequently if requested by the Director. The report shall include a summary of the prospecting or scientific research activities conducted prior to the end of the reporting period and the results obtained. The last quarterly report may be combined with the final report if the final report is submitted within 30 days after the end of the last quarter in which permitted activity occurs. Each permittee shall submit to the Director a final report of activities conducted under the permit within 6 months after expiration of the permit or after the completion of prospecting or scientific research activities, or 60 days prior to a planned lease offering when prospecting or scientific research activities are within the planned leasing area, whichever is sooner, provided that no report shall be required less than 30 days after completion of permitted activities. The report shall include—

    (1) A description of the work performed;

    (2) Charts, maps, or plats depicting the area and blocks in which any activities were conducted specifically, identifying the lines of geophysical traverses and/or the locations where geological activity was conducted;

    (3) The dates on which the actual activities were performed;

    (4) A narrative summary of any mineral occurrences encountered including location, environmental features, and the nature and degree of adverse effects, if any, of the permitted activities on the environment, aquatic life, archaeological resources, or other uses of the area in which the activities were conducted;

    (5) A report of the results of the environmental monitoring required in § 280.6(a)(8) of this part; and

    (6) Such other descriptions of the activities conducted as may be specified by the Director.

    (b) All persons shall immediately notify the Director of all serious accidents, any death or serious injury, or fire or explosion connected with any activity conducted pursuant to this part.