Subpart G - Facility Design, Fabrication, and Installation  


Reports
§ 285.700 - What reports must I submit to BSEE before installing facilities described in my approved SAP, COP, or GAP?
§ 285.701 - What must I include in my Facility Design Report?
§ 285.702 - What must I include in my Fabrication and Installation Report?
§ 285.703 - What reports must I submit for project modifications and repairs?
§ 285.704 - [Reserved]
Certified Verification Agent
§ 285.705 - When must I use a Certified Verification Agent (CVA)?
§ 285.706 - How do I nominate a CVA for BSEE approval?
§ 285.707 - What are the CVA's primary duties for facility design review?
§ 285.708 - What are the CVA's or project engineer's primary duties for fabrication and installation review?
§ 285.709 - When conducting onsite fabrication inspections, what must the CVA or project engineer verify?
§ 285.710 - When conducting onsite installation inspections, what must the CVA or project engineer do?
§ 285.711 - [Reserved]
§ 285.712 - What are the CVA's or project engineer's reporting requirements?
§ 285.713 - What must I do after the CVA or project engineer confirms conformance with the Fabrication and Installation Report on my commercial lease?
§ 285.714 - What records relating to SAPs, COPs, and GAPs must I keep?