§ 650.209 - Preparation and implementation of plan.  


Latest version.
  • (a) An SPCC plan will be prepared expeditiously by each installation having oil or hazardous substances storage facilities as required in § 650.208(b), and each plan will be periodically reviewed triennially and updated as necessary.

    (b) Completed plans will be fully implemented (including required construction and installation of equipment and/or training of personnel) as soon as possible after January 10, 1975. Newly activated installations will prepare an SPCC plan within 6 months after the date they begin operation and will fully implement it not later than 1 year after operations begin.

    (c) An extension of time for the preparation and full implementation of an SPCC Plan beyond the times specified may be obtained from the EPA Regional Administrator. A copy of any request for an extension will be furnished through command channels to HQDA (DAEN—ZCE) Wash., DC 20310.