§ 117.155 - Eureka Slough.  


Latest version.
  • § 117.155 Eureka Slough.

    The drawspan for the Northwestern Pacific Railroad Authority Drawbridge, mile 0.3 at Eureka, need not be opened for the passage of vessels. The owner or agency controlling the drawbridge must restore the drawspan to full operation within six months of notification from the District Commander.

    [USCG-2001-10881, 71 FR 70309, Dec. 4, 2006]