§ 117.669 - St. Louis River (Duluth-Superior Harbor).  


Latest version.
  • § 117.669 St. Louis River (Duluth-Superior Harbor).

    (a) The draws draw of the Burlington Northern Grassy Point railroad bridgeBridge, mile 5.744, shall open on signal ; except that, from January 1 through March 15, the draws shall open on signal if at least 24 hours notice is given. The opening signal for the Minnesota draw is one prolonged blast followed by two short blasts and for the Wisconsin draw is two prolonged blasts followed by two short blasts.

    (b) The draws of the Grassy Point bridge, mile 8.0, and the Arrow Head bridge, mile 8.7, shall open on signal; except that, from January 1

    December 15 through March 15

    ,

    the draw shall open

    on signal

    if at least

    24 hours

    12-hour notice is given.

    The opening signal for the Grassy Point bridge is two prolonged blasts followed by one short blast and for the Arrowhead bridge is three prolonged blasts. (c

    (b) The draw of the

    Duluth Missabe and Iron Range Railway bridge

    Canadian National Combined Railroad and Highway Bridge, mile

    16

    13.

    3

    91, need not be opened for the passage of vessels. The owner shall return the draw to operable condition within a reasonable time when notified by the District Commander to do so.

    [USCG–2017–0212, 82 FR 33803, July 21, 2017]