§ 127.319 - LNG transfer.  


Latest version.
  • § 127.319 LNG transfer.

    During LNG transfer operations, the following must be met:

    (a) The operator of the waterfront facility handling LNG shall must ensure that -

    (1) The marine transfer area for LNG is under the supervision of a person in charge, who has no other assigned duties during the transfer operation;

    (2) Personnel transferring fuel or oily waste are not involved in LNG transfer; and

    (3) No vessels are moored outboard of any LNG vessel without the permission of the COTP.

    (b) The person in charge of shoreside transfer operations shall must -

    (1) Be in continuous communication with the person in charge of transfer operations on the vessel;

    (2) Ensure that an inspection of the transfer piping and equipment for leaks, frost, defects, and other symptoms of safety and operational problems is conducted at least once every transfer;

    (3) Ensure that transfer operations are discontinued -

    (i) Before electrical storms or uncontrolled fires are adjacent to the marine transfer area for LNG; and

    (ii) As soon as a fire is detected; and

    (4) Ensure that the lighting systems are turned on between sunset and sunrise.

    Note:

    Vessel transfer requirements are published in 46 CFR Part 154.

    [CGD 78-038, 53 FR 3376, Feb. 7, 1988, as amended by CGD 88-049, 60 FR 39796, Aug. 3, 1995; USCG-2019-0444, 87 FR 5691, Feb. 2, 2022]