§ 149.479 - International shore connection.


Latest version.
  • (a) The fixed fire main system of a PPC must have:

    (1) At least two risers;

    (2) A cutoff valve and check valve for each riser; and

    (3) At least two international shore connections that meet the requirements in 46 CFR 162.034.

    (b) Each riser must be in an accessible location to vessels alongside the PPC, and two of the risers must be on opposite sides of the PPC.