Figure E-1 to Subpart F of Part 53 - Designation Testing Checklist  


Latest version.
  • DESIGNATION TESTING CHECKLIST FOR CLASS II

    ______________________________

    Auditee Auditor signature Date

    Compliance Status:Y = Yes N = No NA = Not applicable/Not availableVerificationYNNAVerified by Direct Observation of Process or of Documented Evidence: Performance, Design or Application Spec. Corresponding to Sections of 40 CFR Part 53, Subparts E and FVerification Comments (Includes documentation of who, what, where, when, why) (Doc. #, Rev. #, Rev. Date)Subpart E: Performance Specification TestsEvaluation completed according to Subpart E § 53.50 to § 53.56Subpart E: Class I Sequential TestsClass II samplers that are also Class I (sequentialized) have passed the tests in § 53.57Subpart F: Performance Spec/TestEvaluation of Physical Characteristics of Clean Sampler - One of these tests must be performed:
  • § 53.62 - Full Wind Tunnel
  • § 53.63 - Inlet Aspiration
  • § 53.64 - Static Fractionator
  • Evaluation of Physical Characteristics of Loaded Sampler
  • § 53.65 Loading Test
  • One of the following tests must be performed for evaluation after loading: § 53.62, § 53.63, § 53.64
  • Evaluation of the Volatile Characteristics of the Class II Sampler § 53.66