Table 5 of Subpart AAAAAAA of Part 63 - Applicability of General Provisions to Subpart AAAAAAA  


Latest version.
  • CitationSubjectApplies to subpart AAAAAAA
    §63.1ApplicabilityYes.
    §63.2DefinitionsYes.
    §63.3Units and AbbreviationsYes.
    §63.4Prohibited ActivitiesYes.
    §63.5Construction/ReconstructionYes.
    §63.6(a)-(d)Compliance With Standards and Maintenance RequirementsYes.
    §63.6(e)(1)(i)Operation and Maintenance RequirementsNo.
    §63.6(e)(1)(ii)Operation and Maintenance RequirementsNo.
    §63.6(e)(1)(iii)Operation and Maintenance RequirementsYes.
    §63.6(e)(2)[Reserved]
    §63.6(e)(3)Startup, Shutdown, and Malfunction PlanNo. Subpart AAAAAAA does not require startup, shutdown, and malfunction plans.
    §63.6(f)(1)Compliance with Nonopacity Emission StandardsNo. The emission limits apply at all times.
    §63.6(f)(2)-(3)Methods for Determining Compliance and Finding of ComplianceYes.
    §63.6(h)Opacity/Visible Emission (VE) StandardsNo. Subpart AAAAAAA does not contain opacity or VE standards.
    §63.6(i)Compliance ExtensionYes.
    §63.6(j)Presidential Compliance ExemptionYes.
    §63.7(a)-(d)Performance Testing RequirementsYes.
    §63.7(e)(1)Performance Testing RequirementsNo. Subpart AAAAAAA specifies the conditions under which performance tests must be conducted.
    §63.7(e)(2)-(4)Conduct of Performance Tests and Data ReductionYes.
    §63.7(f)-(h)Use of Alternative Test Method; Data Analysis, Recordkeeping, and Reporting; and Waiver of Performance TestsYes.
    §63.8(a)(1)Applicability of Monitoring RequirementsYes.
    §63.8(a)(2)Performance SpecificationsNo. Subpart AAAAAAA does not allow CEMS.
    §63.8(a)(3)[Reserved]
    §63.8(a)(4)Monitoring with FlaresYes.
    §63.8(b)(1)Conduct of MonitoringYes.
    §63.8(b)(2)-(3)Multiple Effluents and Multiple Monitoring SystemsYes.
    §63.8(c)(1)Monitoring System Operation and MaintenanceYes.
    §63.8(c)(1)(i)CMS maintenanceYes.
    §63.8(c)(1)(ii)Spare Parts for CMS MalfunctionYes.
    §63.8(c)(1)(iii)Compliance with Operation and Maintenance RequirementsNo. Subpart AAAAAAA does not require startup, shutdown, and malfunction plans.
    §63.8(c)(2)-(3)Monitoring System InstallationYes.
    §63.8(c)(4)CMS RequirementsNo; §63.11563 specifies the CMS requirements.
    §63.8(c)(5)COMS Minimum ProceduresNo. Subpart AAAAAAA does not contain opacity or VE standards.
    §63.8(c)(6)CMS RequirementsNo; §63.11563 specifies the CMS requirements.
    §63.8(c)(7)-(8)CMS RequirementsYes.
    §63.8(d)CMS Quality ControlNo; §63.11563 specifies the CMS requirements.
    §63.8(e)-(f)CMS Performance EvaluationYes.
    §63.8(g)(1)-(4)Data Reduction RequirementsYes.
    §63.8(g)(5)Data to Exclude from AveragingNo. All monitoring data must be included when calculating averages.
    §63.9Notification RequirementsYes.
    §63.10(a)Recordkeeping and Reporting Requirements—ApplicabilityYes.
    §63.10(b)(1)General Recordkeeping RequirementsYes.
    §63.10(b)(2)(i)-(iii)General Recordkeeping RequirementsYes.
    §63.10(b)(2)(iv)-(v)Records of Actions Taken During Startup, Shutdown, and Malfunction PlansNo. Subpart AAAAAAA does not require startup, shutdown, and malfunction plans.
    §63.10(b)(2)(vi)-(xiv)General Recordkeeping RequirementsYes.
    §63.10(c)(1)-(14)Additional Recordkeeping Requirements for Sources with Continuous Monitoring SystemsYes.
    §63.10(c)(15)Additional Recordkeeping Requirements for Sources with Continuous Monitoring SystemsNo. Subpart AAAAAAA does not require startup, shutdown, and malfunction plans.
    §63.10(d)(1)-(4)General Reporting RequirementsYes.
    §63.10(d)(5)Periodic Startup, Shutdown, and Malfunction ReportsNo. Subpart AAAAAAA does not require startup, shutdown, and malfunction plans.
    §63.10(e)Additional Reporting Requirements for Sources with Continuous Monitoring SystemsYes.
    §63.10(f)Waiver of Recordkeeping or Reporting RequirementsYes.
    §63.11Control Device and Work Practice RequirementsYes.
    §63.12State Authority and DelegationsYes.
    §63.13Addresses of State Air Pollution Control Agencies and EPA Regional OfficesYes.
    §63.14Incorporations by ReferenceYes.
    §63.15Availability of Information and ConfidentialityYes.
    §63.16Performance Track ProvisionsNo.