Code of Federal Regulations (Last Updated: November 8, 2024) |
Title 40 - Protection of Environment |
Chapter I - Environmental Protection Agency |
SubChapter C - Air Programs |
Part 63 - National Emission Standards for Hazardous Air Pollutants for Source Categories |
Subpart AAAAAAA - National Emission Standards for Hazardous Air Pollutants for Area Sources: Asphalt Processing and Asphalt Roofing Manufacturing |
Table 5 to Subpart AAAAAAA of Part 63 - Applicability of General Provisions to Subpart AAAAAAA
Latest version.
-
Table 5 to Subpart AAAAAAA of Part 63 - Applicability of General Provisions to Subpart AAAAAAA
Citation Subject Applies to subpart AAAAAAA § 63.1 Applicability Yes. § 63.2 Definitions Yes. § 63.3 Units and Abbreviations Yes. § 63.4 Prohibited Activities Yes. § 63.5 Construction/Reconstruction Yes. § 63.6(a)-(d) Compliance With Standards and Maintenance Requirements Yes. § 63.6(e)(1)(i) Operation and Maintenance Requirements No. § 63.6(e)(1)(ii) Operation and Maintenance Requirements No. § 63.6(e)(1)(iii) Operation and Maintenance Requirements Yes. § 63.6(e)(2) [Reserved] § 63.6(e)(3) Startup, Shutdown, and Malfunction Plan No. Subpart AAAAAAA does not require startup, shutdown, and malfunction plans. § 63.6(f)(1) Compliance with Nonopacity Emission Standards No. The emission limits apply at all times. § 63.6(f)(2)-(3) Methods for Determining Compliance and Finding of Compliance Yes. § 63.6(h) Opacity/Visible Emission (VE) Standards No. Subpart AAAAAAA does not contain opacity or VE standards. § 63.6(i) Compliance Extension Yes. § 63.6(j) Presidential Compliance Exemption Yes. § 63.7(a)-(d) Performance Testing Requirements Yes. § 63.7(e)(1) Performance Testing Requirements No. Subpart AAAAAAA specifies the conditions under which performance tests must be conducted. § 63.7(e)(2)-(4) Conduct of Performance Tests and Data Reduction Yes. § 63.7(f)-(h) Use of Alternative Test Method; Data Analysis, Recordkeeping, and Reporting; and Waiver of Performance Tests Yes. § 63.8(a)(1) Applicability of Monitoring Requirements Yes. § 63.8(a)(2) Performance Specifications No. Subpart AAAAAAA does not allow CEMS. § 63.8(a)(3) [Reserved] § 63.8(a)(4) Monitoring with Flares Yes. § 63.8(b)(1) Conduct of Monitoring Yes. § 63.8(b)(2)-(3) Multiple Effluents and Multiple Monitoring Systems Yes. § 63.8(c)(1) Monitoring System Operation and Maintenance Yes. § 63.8(c)(1)(i) CMS maintenance Yes. § 63.8(c)(1)(ii) Spare Parts for CMS Malfunction Yes. § 63.8(c)(1)(iii) Compliance with Operation and Maintenance Requirements No. Subpart AAAAAAA does not require startup, shutdown, and malfunction plans. § 63.8(c)(2)-(3) Monitoring System Installation Yes. § 63.8(c)(4) CMS Requirements No; § 63.11563 specifies the CMS requirements. § 63.8(c)(5) COMS Minimum Procedures No. Subpart AAAAAAA does not contain opacity or VE standards. § 63.8(c)(6) CMS Requirements No; § 63.11563 specifies the CMS requirements. § 63.8(c)(7)-(8) CMS Requirements Yes. § 63.8(d) CMS Quality Control No; § 63.11563 specifies the CMS requirements. § 63.8(e)-(f) CMS Performance Evaluation Yes. § 63.8(g)(1)-(4) Data Reduction Requirements Yes. § 63.8(g)(5) Data to Exclude from Averaging No. All monitoring data must be included when calculating averages. § 63.9 Notification Requirements Yes. § 63.10(a) Recordkeeping and Reporting Requirements - Applicability Yes. § 63.10(b)(1) General Recordkeeping Requirements Yes. § 63.10(b)(2)(i)-(iii) General Recordkeeping Requirements Yes. § 63.10(b)(2)(iv)-(v) Records of Actions Taken During Startup, Shutdown, and Malfunction Plans No. Subpart AAAAAAA does not require startup, shutdown, and malfunction plans. § 63.10(b)(2)(vi)-(xiv) General Recordkeeping Requirements Yes. § 63.10(c)(1)-(14) Additional Recordkeeping Requirements for Sources with Continuous Monitoring Systems Yes. § 63.10(c)(15) Additional Recordkeeping Requirements for Sources with Continuous Monitoring Systems No. Subpart AAAAAAA does not require startup, shutdown, and malfunction plans. § 63.10(d)(1)-(4) General Reporting Requirements Yes. § 63.10(d)(5) Periodic Startup, Shutdown, and Malfunction Reports No. Subpart AAAAAAA does not require startup, shutdown, and malfunction plans. § 63.10(e) Additional Reporting Requirements for Sources with Continuous Monitoring Systems Yes. § 63.10(f) Waiver of Recordkeeping or Reporting Requirements Yes. § 63.11 Control Device and Work Practice Requirements Yes. § 63.12 State Authority and Delegations Yes. § 63.13 Addresses of State Air Pollution Control Agencies and EPA Regional Offices Yes. § 63.14 Incorporations by Reference Yes. § 63.15 Availability of Information and Confidentiality Yes. § 63.16 Performance Track Provisions No.