Table 12 to Subpart FFFF of Part 63 - —Applicability of General Provisions to Subpart FFFF  


Latest version.
  • Table 12 to Subpart FFFF of Part 63 - Applicability of General Provisions to Subpart FFFF

    As specified in § 63.2540, the parts of the General Provisions that apply to you are shown in the following table:

    Citation Subject Explanation
    § 63.1 Applicability Yes.
    § 63.2 Definitions Yes.
    § 63.3 Units and Abbreviations Yes.
    § 63.4 Prohibited Activities Yes.
    § 63.5 Construction/Reconstruction Yes.
    § 63.6(a) Applicability Yes.
    § 63.6(b)(1)-(4) Compliance Dates for New and Reconstructed sources Yes.
    § 63.6(b)(5) Notification Yes.
    § 63.6(b)(6) [Reserved]
    § 63.6(b)(7) Compliance Dates for New and Reconstructed Area Sources That Become Major Yes.
    § 63.6(c)(1)-(2) Compliance Dates for Existing Sources Yes.
    § 63.6(c)(3)-(4) [Reserved]
    § 63.6(c)(5) Compliance Dates for Existing Area Sources That Become Major Yes.
    § 63.6(d) [Reserved]
    § 63.6(e)(1)(i) Operation & Maintenance Yes, before August 12, 2023.
    No, beginning on and after August 12, 2023. See § 63.2450(u) for general duty requirement.
    § 63.6(e)(1)(ii) Operation & Maintenance Yes, before August 12, 2023.
    No, beginning on and after August 12, 2023.
    § 63.6(e)(1)(iii) Operation & Maintenance Yes.
    § 63.6(e)(2) [Reserved]
    § 63.6(e)(3)(i), (iii), and (v) through (viii) Startup, Shutdown, Malfunction Plan (SSMP) Yes, before August 12, 2023, except information regarding Group 2 emission points and equipment leaks is not required in the SSMP, as specified in § 63.2525(j). No, beginning on and after August 12, 2023.
    § 63.6(e)(3)(iii) and (iv) Recordkeeping and Reporting During SSM No, see § 63.2525 for recordkeeping requirements and § 63.2520(e)(4) for reporting requirements.
    § 63.6(e)(3)(ix) SSMP incorporation into title V permit Yes, before August 12, 2023. No beginning on and after August 12, 2023.
    § 63.6(f)(1) Compliance With Non-Opacity Standards Except During SSM No. See § 63.2445(g) through (i).
    § 63.6(f)(2)-(3) Methods for Determining Compliance Yes.
    § 63.6(g)(1)-(3) Alternative Standard Yes.
    § 63.6(h)(1) Compliance with Opacity Standards Except During SSM No. See § 63.2445(g) through (i).
    § 63.6(h)(2)-(9) Opacity/Visible Emission (VE) Standards Only for flares for which Method 22 of 40 CFR part 60, appendix A-7, observations are required as part of a flare compliance assessment.
    § 63.6(i)(1)-(14), and (16) Compliance Extension Yes.
    § 63.6(j) Presidential Compliance Exemption Yes.
    § 63.7(a)(1)-(2) Performance Test Dates Yes, except substitute 150 days for 180 days.
    § 63.7(a)(3) Section 114 Authority Yes, and this paragraph also applies to flare compliance assessments as specified under § 63.997(b)(2).
    § 63.7(a)(4) Force Majeure Yes.
    § 63.7(b)(1) Notification of Performance Test Yes.
    § 63.7(b)(2) Notification of Rescheduling Yes.
    § 63.7(c) Quality Assurance/Test Plan Yes, except the test plan must be submitted with the notification of the performance test if the control device controls batch process vents.
    § 63.7(d) Testing Facilities Yes.
    § 63.7(e)(1) Conditions for Conducting Performance Tests Yes, before August 12, 2023 except that performance tests for batch process vents must be conducted under worst-case conditions as specified in § 63.2460. No, beginning on and after August 12, 2023. See § 63.2450(g)(6).
    § 63.7(e)(2) Conditions for Conducting Performance Tests Yes.
    § 63.7(e)(3) Test Run Duration Yes.
    § 63.7(e)(4) Administrator's Authority to Require Testing Yes.
    § 63.7(f) Alternative Test Method Yes.
    § 63.7(g) Performance Test Data Analysis Yes, except this subpart specifies how and when the performance test and performance evaluation results are reported.
    § 63.7(h) Waiver of Tests Yes.
    § 63.8(a)(1) Applicability of Monitoring Requirements Yes.
    § 63.8(a)(2) Performance Specifications Yes.
    § 63.8(a)(3) [Reserved]
    § 63.8(a)(4) Monitoring with Flares Yes, except for flares subject to § 63.2450(e)(5).
    § 63.8(b)(1) Monitoring Yes.
    § 63.8(b)(2)-(3) Multiple Effluents and Multiple Monitoring Systems Yes.
    § 63.8(c)(1) Monitoring System Operation and Maintenance Yes.
    § 63.8(c)(1)(i) Routine and Predictable SSM Yes, before August 12, 2023. No, beginning on and after August 12, 2023.
    § 63.8(c)(1)(ii) CMS malfunction not in SSM plan Yes.
    § 63.8(c)(1)(iii) Compliance with Operation and Maintenance Requirements Yes, before August 12, 2023. No, beginning on and after August 12, 2023.
    § 63.8(c)(2)-(3) Monitoring System Installation Yes.
    § 63.8(c)(4) CMS Requirements Only for CEMS. Requirements for CPMS are specified in referenced subparts G and SS of this part. Requirements for COMS do not apply because this subpart does not require continuous opacity monitoring systems (COMS).
    § 63.8(c)(4)(i) COMS Measurement and Recording Frequency No; this subpart does not require COMS.
    § 63.8(c)(4)(ii) CEMS Measurement and Recording Frequency Yes.
    § 63.8(c)(5) COMS Minimum Procedures No. This subpart does not contain opacity or VE limits.
    § 63.8(c)(6) CMS Requirements Only for CEMS; requirements for CPMS are specified in referenced subparts G and SS of this part. Requirements for COMS do not apply because this subpart does not require COMS.
    § 63.8(c)(7)-(8) CMS Requirements Only for CEMS. Requirements for CPMS are specified in referenced subparts G and SS of this part. Requirements for COMS do not apply because this subpart does not require COMS.
    § 63.8(d)(1) CMS Quality Control Only for CEMS.
    § 63.8(d)(2) CMS Quality Control Only for CEMS.
    § 63.8(d)(3) CMS Quality Control Yes, only for CEMS before August 12, 2023. No, beginning on and after August 12, 2023. See § 63.2450(j)(6).
    § 63.8(e) CMS Performance Evaluation Only for CEMS, except this subpart specifies how and when the performance evaluation results are reported. Section 63.8(e)(5)(ii) does not apply because this subpart does not require COMS.
    § 63.8(f)(1)-(5) Alternative Monitoring Method Yes, except you may also request approval using the precompliance report.
    § 63.8(f)(6) Alternative to Relative Accuracy Test Only applicable when using CEMS to demonstrate compliance, including the alternative standard in § 63.2505.
    § 63.8(g)(1)-(4) Data Reduction Only when using CEMS, including for the alternative standard in § 63.2505, except that the requirements for COMS do not apply because this subpart has no opacity or VE limits, and § 63.8(g)(2) does not apply because data reduction requirements for CEMS are specified in § 63.2450(j).
    § 63.8(g)(5) Data Reduction No. Requirements for CEMS are specified in § 63.2450(j). Requirements for CPMS are specified in referenced subparts G and SS of this part.
    § 63.9(a) Notification Requirements Yes.
    § 63.9(b)(1)-(5) Initial Notifications Yes.
    § 63.9(c) Request for Compliance Extension Yes.
    § 63.9(d) Notification of Special Compliance Requirements for New Source Yes.
    § 63.9(e) Notification of Performance Test Yes.
    § 63.9(f) Notification of VE/Opacity Test No.
    § 63.9(g) Additional Notifications When Using CMS Only for CEMS. Section 63.9(g)(2) does not apply because this subpart does not require COMS.
    63.9(h)(1)-(6) Notification of Compliance Status Yes, except § 63.9(h)(2)(i)(A) through (G) and (h)(2)(ii) do not apply because § 63.2520(d) specifies the required contents and due date of the notification of compliance status report.
    § 63.9(i) Adjustment of Submittal Deadlines Yes.
    § 63.9(j) Change in previous information Yes, for change in major source status, otherwise § 63.2520(e) specifies reporting requirements for process changes.
    § 63.9(k) Electronic reporting procedures Yes, as specified in § 63.9(j).
    § 63.10(a) Recordkeeping/Reporting Yes.
    § 63.10(b)(1) Recordkeeping/Reporting Yes.
    § 63.10(b)(2)(i) Records related to startup and shutdown No, see §§ 63.2450(e) and 63.2525 for recordkeeping requirements.
    § 63.10(b)(2)(ii) Recordkeeping relevant to SSM periods and CMS Yes, before August 12, 2023. No, beginning on and after August 12, 2023. See § 63.2525(h) and (l).
    § 63.10(b)(2)(iii) Records related to maintenance of air pollution control equipment Yes.
    § 63.10(b)(2)(iv) and (v) Recordkeeping relevant to SSM period Yes, before August 12, 2023. No, beginning on and after August 12, 2023.
    § 63.10(b)(2)(vi) CMS Records Before August 12, 2023, yes but only for CEMS; requirements for CPMS are specified in referenced subparts G and SS of this part. Beginning on and after August 12, 2023, yes for CEMS and CPMS for flares subject to § 63.2450(e)(5).
    § 63.10(b)(2)(x) and (xi) CMS Records Only for CEMS; requirements for CPMS are specified in referenced subparts G and SS of this part.
    § 63.10(b)(2)(vii)-(ix) Records Yes.
    § 63.10(b)(2)(xii) Records Yes.
    § 63.10(b)(2)(xiii) Records Only for CEMS.
    § 63.10(b)(2)(xiv) Records Yes.
    § 63.10(b)(3) Records Yes.
    § 63.10(c)(1)-(6),(9)-(14) Records Only for CEMS. Recordkeeping requirements for CPMS are specified in referenced subparts G and SS of this part.
    § 63.10(c)(7)-(8) Records No. Recordkeeping requirements are specified in § 63.2525.
    § 63.10(c)(15) Records Yes, before August 12, 2023, but only for CEMS. No, beginning on and after August 12, 2023.
    § 63.10(d)(1) General Reporting Requirements Yes.
    § 63.10(d)(2) Report of Performance Test Results Yes, before October 13, 2020. No, beginning on and after October 13, 2020.
    § 63.10(d)(3) Reporting Opacity or VE Observations No.
    § 63.10(d)(4) Progress Reports Yes.
    § 63.10(d)(5)(i) Periodic Startup, Shutdown, and Malfunction Reports No, § 63.2520(e)(4) and (5) specify the SSM reporting requirements.
    § 63.10(d)(5)(ii) Immediate SSM Reports No.
    § 63.10(e)(1) Additional CEMS Reports Yes.
    § 63.10(e)(2)(i) Additional CMS Reports Only for CEMS, except this subpart specifies how and when the performance evaluation results are reported.
    § 63.10(e)(2)(ii) Additional COMS Reports No. This subpart does not require COMS.
    § 63.10(e)(3) Reports No. Reporting requirements are specified in § 63.2520.
    § 63.10(e)(3)(i)-(iii) Reports No. Reporting requirements are specified in § 63.2520.
    § 63.10(e)(3)(iv)-(v) Excess Emissions Reports No. Reporting requirements are specified in § 63.2520.
    § 63.10(e)(3)(iv)-(v) Excess Emissions Reports No. Reporting requirements are specified in § 63.2520.
    § 63.10(e)(3)(vi)-(viii) Excess Emissions Report and Summary Report No. Reporting requirements are specified in § 63.2520.
    § 63.10(e)(4) Reporting COMS data No.
    § 63.10(f) Waiver for Recordkeeping/Reporting Yes.
    § 63.11 Control device requirements for flares and work practice requirements for equipment leaks Yes, except for flares subject to § 63.2450(e)(5).
    § 63.12 Delegation Yes.
    § 63.13 Addresses Yes.
    § 63.14 Incorporation by Reference Yes.
    § 63.15 Availability of Information Yes.

    [85 FR 49164, Aug. 12, 2020, as amended at 85 FR 73903, Nov. 19, 2020]