Code of Federal Regulations (Last Updated: November 8, 2024) |
Title 40 - Protection of Environment |
Chapter I—Environmental Protection Agency |
SubChapter C—Air Programs |
Part 63 - National Emission Standards for Hazardous Air Pollutants for Source Categories |
Subpart FFFFF - National Emission Standards for Hazardous Air Pollutants for Integrated Iron and Steel Manufacturing Facilities |
Table 4 to Subpart FFFFF of Part 63 - — Applicability of General Provisions to Subpart FFFFF
Latest version.
-
Table 4 to Subpart FFFFF of Part 63 - Applicability of General Provisions to Subpart FFFFF
As required in § 63.7850, you must comply with the requirements of the NESHAP General Provisions (40 CFR part 63, subpart A) shown in the following table:
Citation Subject Applies to Subpart FFFFF Explanation § 63.1 Applicability Yes § 63.2 Definitions Yes § 63.3 Units and Abbreviations Yes § 63.4 Prohibited Activities Yes § 63.5 Construction/Reconstruction Yes § 63.6(a), (b), (c), (d), (e)(1)(iii), (f)(2)-(3), (g), (h)(2)(ii)-(h)(9) Compliance with Standards and Maintenance Requirements Yes § 63.6(e)(1)(i) General Duty to Minimize Emissions No, for new or reconstructed sources which commenced construction or reconstruction after August 16, 2019. For all other affected sources, Yes on or before January 11, 2021 and No thereafter See § 63.7810(d) for general duty requirement. § 63.6(e)(1)(ii) Requirement to Correct Malfunctions ASAP No, for new or reconstructed sources which commenced construction or reconstruction after August 16, 2019. For all other affected sources, Yes, on or before January 11, 2021 and No thereafter § 63.6(e)(3) SSM Plan Requirements No, for new or reconstructed sources which commenced construction or reconstruction after August 16, 2019. For all other affected sources, Yes on or before January 11, 2021 and No thereafter See § 63.7810(c) § 63.6(f)(1) Compliance except during SSM No See § 63.7810(a). § 63.6(h)(1) Compliance except during SSM No See § 63.7810(a). § 63.6(h)(2)(i) Determining Compliance with Opacity and VE Standards No Subpart FFFFF specifies methods and procedures for determining compliance with opacity emission and operating limits. § 63.6(i) Extension of Compliance with Emission Standards Yes § 63.6(j) Exemption from Compliance with Emission Standards Yes § 63.7(a)(1)-(2) Applicability and Performance Test Dates No Subpart FFFFF and specifies performance test applicability and dates. § 63.7(a)(3), (b)-(d), (e)(2)-(4), (f)-(h) Performance Testing Requirements Yes § 63.7(e)(1) Performance Testing No, for new or reconstructed sources which commenced construction or reconstruction after August 16, 2019. For all other affected sources, Yes on or before January 11, 2021 and No thereafter See §§ 63.7822(a), 63.7823(a), and 63.7825(a). § 63.8(a)(1)-(3), (b), (c)(1)(ii), (c)(2)-(3), (c)(4)(i)-(ii), (c)(5)-(6), (c)(7)-(8), (d)(1)-(2), (e), (f)(1)-(5), (g)(1)-(4) Monitoring Requirements Yes CMS requirements in § 63.8(c)(4)(i)-(ii), (c)(5)-(6), (d)(1)-(2), and (e) apply only to COMS. § 63.8(a)(4) Additional Monitoring Requirements for Control Devices in § 63.11 No Subpart FFFFF does not require flares. § 63.8(c)(1)(i) General Duty to Minimize Emissions and CMS Operation No, for new or reconstructed sources which commenced construction or reconstruction after August 16, 2019. For all other affected sources, Yes on or before January 11, 2021 and No thereafter § 63.8(c)(1)(iii) Requirement to Develop SSM Plan for CMS No, for new or reconstructed sources which commenced construction or reconstruction after August 16, 2019. For all other affected sources, Yes on or before January 11, 2021 and No thereafter § 63.8(c)(4) Continuous Monitoring System Requirements No Subpart FFFFF specifies requirements for operation of CMS. § 63.8(d)(3) Written procedures for CMS No, for new or reconstructed sources which commenced construction or reconstruction after August 16, 2019. For all other affected sources, Yes on or before January 11, 2021 and No thereafter See § 63.7842(b)(3). § 63.8(f)(6) RATA Alternative No § 63.8(g)(5) Data Reduction No Subpart FFFFF specifies data reduction requirements. § 63.9 Notification Requirements Yes Additional notifications for CMS in § 63.9(g) apply only to COMS. § 63.10(a), (b)(1), (b)(2)(x), (b)(2)(xiv), (b)(3), (c)(1)-(6), (c)(9)-(14), (d)(1)-(4), (e)(1)-(2), (e)(4), (f) Recordkeeping and Reporting Requirements Yes Additional records for CMS in § 63.10(c)(1)-(6), (9)-(14), and reports in § 63.10(d)(1)-(2) apply only to COMS. § 63.10(b)(2)(i) Recordkeeping of Occurrence and Duration of Startups and Shutdowns No, for new or reconstructed sources which commenced construction or reconstruction after August 16, 2019. For all other affected sources, Yes on or before January 11, 2021 and No thereafter § 63.10(b)(2)(ii) Recordkeeping of Failures to Meet a Standard No, for new or reconstructed sources which commenced construction or reconstruction after August 16, 2019. For all other affected sources, Yes on or before January 11, 2021 and No thereafter See § 63.7842(a)(2)-(4) for recordkeeping of (1) date, time, and duration of failure to meet the standard; (2) listing of affected source or equipment, and an estimate of the quantity of each regulated pollutant emitted over the standard; and (3) actions to minimize emissions and correct the failure. § 63.10(b)(2)(iii) Maintenance Records Yes § 63.10(b)(2)(iv) Actions Taken to Minimize Emissions During SSM No, for new or reconstructed sources which commenced construction or reconstruction after August 16, 2019. For all other affected sources, Yes on or before January 11, 2021 and No thereafter See § 63.7842(a)(4) for records of actions taken to minimize emissions. § 63.10(b)(2)(v) Actions Taken to Minimize Emissions During SSM No, for new or reconstructed sources which commenced construction or reconstruction after August 16, 2019. For all other affected sources, Yes on or before January 11, 2021 and No thereafter See § 63.7842(a)(4) for records of actions taken to minimize emissions. § 63.10(b)(2)(vi) Recordkeeping for CMS Malfunctions Yes § 63.10(b)(2)(vii)-(ix) Other CMS Requirements Yes § 63.10(b)(2)(xiii) CMS Records for RATA Alternative No § 63.10(c)(7)-(8) Records of Excess Emissions and Parameter Monitoring Exceedances for CMS No Subpart FFFFF specifies record requirements; see § 63.7842. § 63.10(c)(15) Use of SSM Plan No, for new or reconstructed sources which commenced construction or reconstruction after August 16, 2019. For all other affected sources, Yes on or before January 11, 2021 and No thereafter § 63.10(d)(5)(i) Periodic SSM Reports No, for new or reconstructed sources which commenced construction or reconstruction after August 16, 2019. For all other affected sources, Yes on or before January 11, 2021 and No thereafter See § 63.7841(b)(4) for malfunction reporting requirements. § 63.10(d)(5)(ii) Immediate SSM Reports No, for new or reconstructed sources which commenced construction or reconstruction after August 16, 2019. For all other affected sources, Yes on or before January 11, 2021 and No thereafter § 63.10(e)(3) Excess Emission Reports No Subpart FFFFF specifies reporting requirements; see § 63.7841. § 63.11 Control Device Requirements No Subpart FFFFF does not require flares. § 63.12 State Authority and Delegations Yes § 63.13-§ 63.16 Addresses, Incorporations by Reference, Availability of Information and Confidentiality, Performance Track Provisions Yes [85 FR 42128, July 13, 2020]