Table 6 to Subpart GGG of Part 63 - Wastewater - Compliance Options for Wastewater Tanks  


Latest version.
  • Table 6 to Subpart GGG of Part 63 - Wastewater - Compliance Options for Wastewater Tanks

    Capacity, m3 Maximum true vapor pressure, kPa Control requirements
    <75 § 63.1256(b)(1).
    >75 and <151 <13.1 § 63.1256(b)(1).
    >13.1 § 63.1256(b)(2).
    >151 <5.2 § 63.1256(b)(1).
    >5.2 § 63.1256(b)(2).