Table 2 to Subpart HHH of Part 63 - Applicability of 40 CFR Part 63 General Provisions to Subpart HHH  


Latest version.
  • General provisions referenceApplicable to
  • subpart HHH
  • Explanation§ 63.1(a)(1)Yes§ 63.1(a)(2)Yes§ 63.1(a)(3)Yes§ 63.1(a)(4)Yes§ 63.1(a)(5)NoSection reserved.§ 63.1(a)(6) through (a)(8)Yes§ 63.1(a)(9)NoSection reserved.§ 63.1(a)(10)Yes§ 63.1(a)(11)Yes§ 63.1(a)(12) through (a)(14)Yes§ 63.1(b)(1)NoSubpart HHH specifies applicability.§ 63.1(b)(2)Yes§ 63.1(b)(3)No§ 63.1(c)(1)NoSubpart HHH specifies applicability.§ 63.1(c)(2)No§ 63.1(c)(3)NoSection reserved.§ 63.1(c)(4)Yes§ 63.1(c)(5)Yes§ 63.1(d)NoSection reserved.§ 63.1(e)Yes§ 63.2YesExcept definition of major source is unique for this source category and there are additional definitions in subpart HHH.§ 63.3(a) through (c)Yes§ 63.4(a)(1) through (a)(3)Yes§ 63.4(a)(4)NoSection reserved.§ 63.4(a)(5)Yes§ 63.4(b)Yes§ 63.4(c)Yes§ 63.5(a)(1)Yes§ 63.5(a)(2)NoPreconstruction review required only for major sources that commence construction after promulgation of the standard.§ 63.5(b)(1)Yes§ 63.5(b)(2)NoSection reserved.§ 63.5(b)(3)Yes§ 63.5(b)(4)Yes§ 63.5(b)(5)Yes§ 63.5(b)(6)Yes§ 63.5(c)NoSection reserved.§ 63.5(d)(1)Yes§ 63.5(d)(2)Yes§ 63.5(d)(3)Yes§ 63.5(d)(4)Yes§ 63.5(e)Yes§ 63.5(f)(1)Yes§ 63.5(f)(2)Yes§ 63.6(a)Yes§ 63.6(b)(1)Yes§ 63.6(b)(2)Yes§ 63.6(b)(3)Yes§ 63.6(b)(4)Yes§ 63.6(b)(5)Yes§ 63.6(b)(6)NoSection reserved.§ 63.6(b)(7)Yes§ 63.6(c)(1)Yes§ 63.6(c)(2)Yes§ 63.6(c)(3) and (c)(4)NoSection reserved.§ 63.6(c)(5)Yes§ 63.6(d)NoSection reserved.§ 63.6(e)Yes§ 63.6(e)YesExcept as otherwise specified.§ 63.6(e)(1)(i)NoAddressed in § 63.1272.§ 63.6(e)(1)(ii)Yes§ 63.6(e)(1)(iii)Yes§ 63.6(e)(2)Yes§ 63.6(e)(3)(i)YesExcept as otherwise specified.§ 63.6(e)(3)(i)(A)NoAddressed by § 63.1272(c).§ 63.6(e)(3)(i)(B)Yes§ 63.6(e)(3)(i)(C)Yes§ 63.6(e)(3)(ii) through (3)(vi)Yes§ 63.6(e)(3)(vii)§ 63.6(e)(3)(vii) (A)Yes§ 63.6(e)(3)(vii) (B)YesExcept that the plan must provide for operation in compliance with § 63.1272(c).§ 63.6(e)(3)(vii) (C)Yes§ 63.6(e)3)(viii)Yes§ 63.6(f)(1)Yes§ 63.6(f)(2)Yes§ 63.6(f)(3)Yes§ 63.6(g)Yes§ 63.6(h)NoSubpart HHH does not contain opacity or visible emission standards.§ 63.6(i)(1)-(i)(14)Yes§ 63.6(i)(15)NoSection reserved.§ 63.6(i)(16)Yes§ 63.6(j)Yes§ 63.7(a)(1)Yes§ 63.7(a)(2)YesBut the performance test results must be submitted within 180 days after the compliance date.§ 63.7(a)(3)Yes§ 63.7(b)Yes§ 63.7(c)Yes§ 63.7(d)Yes§ 63.7(e)(1)Yes§ 63.7(e)(2)Yes§ 63.7(e)(3)Yes§ 63.7(e)(4)Yes§ 63.7(f)Yes§ 63.7(g)Yes§ 63.7(h)Yes§ 63.8(a)(1)Yes§ 63.8(a)(2)Yes§ 63.8(a)(3)NoSection reserved.§ 63.8(a)(4)Yes§ 63.8(b)(1)Yes§ 63.8(b)(2)Yes§ 63.8(b)(3)Yes§ 63.8(c)(1)Yes§ 63.8(c)(2)Yes§ 63.8(c)(3)Yes§ 63.8(c)(4)No§ 63.8(c)(5) through (c)(8)Yes§ 63.8(d)Yes§ 63.8(e)YesSubpart HHH does not specifically require continuous emissions monitor performance evaluations, however, the Administrator can request that one be conducted.§ 63.8(f)(1) through (f)(5)Yes§ 63.8(f)(6)NoSubpart HHH does not require continuous emissions monitoring.§ 63.8(g)NoSubpart HHH specifies continuous monitoring system data reduction requirements.§ 63.9(a)Yes§ 63.9(b)(1)Yes§ 63.9(b)(2)YesExisting sources are given 1 year (rather than 120 days) to submit this notification.§ 63.9(b)(3)Yes§ 63.9(b)(4)Yes§ 63.9(b)(5)Yes§ 63.9(c)Yes§ 63.9(d)Yes§ 63.9(e)Yes§ 63.9(f)No§ 63.9(g)Yes§ 63.9(h)(1) through (h)(3)Yes§ 63.9(h)(4)NoSection reserved.§ 63.9(h)(5) and (h)(6)Yes§ 63.9(i)Yes§ 63.9(j)Yes§ 63.10(a)Yes§ 63.10(b)(1)YesSection 63.1284(b)(1) requires sources to maintain the most recent 12 months of data on site and allows offsite storage for the remaining 4 years of data.§ 63.10(b)(2)Yes§ 63.10(b)(3)No§ 63.10(c)(1)Yes§ 63.10(c)(2) through (c)(4)NoSections reserved.§ 63.10(c)(5) through (c)(8)Yes§ 63.10(c)(9)NoSection reserved.§ 63.10(c)(10) through (c)(15)Yes§ 63.10(d)(1)Yes§ 63.10(d)(2)Yes§ 63.10(d)(3)Yes§ 63.10(d)(4)Yes§ 63.10(d)(5)YesSubpart HHH requires major sources to submit a startup, shutdown and malfunction report semi-annually.§ 63.10(e)(1)Yes§ 63.10(e)(2)Yes§ 63.10(e)(3)(i)YesSubpart HHH requires major sources to submit Periodic Reports semi-annually.§ 63.10(e)(3)(i)(A)Yes§ 63.10(e)(3)(i)(B)Yes§ 63.10(e)(3)(i)(C)NoSubpart HHH does not require quarterly reporting for excess emissions.§ 63.10(e)(3)(ii) through (e)(3)(viii) Yes§ 63.10(f)Yes§ 63.11(a) and (b)Yes§ 63.12(a) through (c)Yes§ 63.13(a) through (c)Yes§ 63.14(a) and (b)Yes§ 63.15(a) and (b)Yes