Code of Federal Regulations (Last Updated: November 8, 2024) |
Title 40 - Protection of Environment |
Chapter I - Environmental Protection Agency |
SubChapter C - Air Programs |
Part 63 - National Emission Standards for Hazardous Air Pollutants for Source Categories |
Subpart HHH - National Emission Standards for Hazardous Air Pollutants From Natural Gas Transmission and Storage Facilities |
Table 2 to Subpart HHH of Part 63 - Applicability of 40 CFR Part 63 General Provisions to Subpart HHH
Latest version.
-
General provisions reference Applicable to - subpart HHH
Explanation § 63.1(a)(1) Yes § 63.1(a)(2) Yes § 63.1(a)(3) Yes § 63.1(a)(4) Yes § 63.1(a)(5) No Section reserved. § 63.1(a)(6) through (a)(8) Yes § 63.1(a)(9) No Section reserved. § 63.1(a)(10) Yes § 63.1(a)(11) Yes § 63.1(a)(12) through (a)(14) Yes § 63.1(b)(1) No Subpart HHH specifies applicability. § 63.1(b)(2) Yes § 63.1(b)(3) No § 63.1(c)(1) No Subpart HHH specifies applicability. § 63.1(c)(2) No § 63.1(c)(3) No Section reserved. § 63.1(c)(4) Yes § 63.1(c)(5) Yes § 63.1(d) No Section reserved. § 63.1(e) Yes § 63.2 Yes Except definition of major source is unique for this source category and there are additional definitions in subpart HHH. § 63.3(a) through (c) Yes § 63.4(a)(1) through (a)(3) Yes § 63.4(a)(4) No Section reserved. § 63.4(a)(5) Yes § 63.4(b) Yes § 63.4(c) Yes § 63.5(a)(1) Yes § 63.5(a)(2) No Preconstruction review required only for major sources that commence construction after promulgation of the standard. § 63.5(b)(1) Yes § 63.5(b)(2) No Section reserved. § 63.5(b)(3) Yes § 63.5(b)(4) Yes § 63.5(b)(5) Yes § 63.5(b)(6) Yes § 63.5(c) No Section reserved. § 63.5(d)(1) Yes § 63.5(d)(2) Yes § 63.5(d)(3) Yes § 63.5(d)(4) Yes § 63.5(e) Yes § 63.5(f)(1) Yes § 63.5(f)(2) Yes § 63.6(a) Yes § 63.6(b)(1) Yes § 63.6(b)(2) Yes § 63.6(b)(3) Yes § 63.6(b)(4) Yes § 63.6(b)(5) Yes § 63.6(b)(6) No Section reserved. § 63.6(b)(7) Yes § 63.6(c)(1) Yes § 63.6(c)(2) Yes § 63.6(c)(3) and (c)(4) No Section reserved. § 63.6(c)(5) Yes § 63.6(d) No Section reserved. § 63.6(e) Yes § 63.6(e) Yes Except as otherwise specified. § 63.6(e)(1)(i) No Addressed in § 63.1272. § 63.6(e)(1)(ii) Yes § 63.6(e)(1)(iii) Yes § 63.6(e)(2) Yes § 63.6(e)(3)(i) Yes Except as otherwise specified. § 63.6(e)(3)(i)(A) No Addressed by § 63.1272(c). § 63.6(e)(3)(i)(B) Yes § 63.6(e)(3)(i)(C) Yes § 63.6(e)(3)(ii) through (3)(vi) Yes § 63.6(e)(3)(vii) § 63.6(e)(3)(vii) (A) Yes § 63.6(e)(3)(vii) (B) Yes Except that the plan must provide for operation in compliance with § 63.1272(c). § 63.6(e)(3)(vii) (C) Yes § 63.6(e)3)(viii) Yes § 63.6(f)(1) Yes § 63.6(f)(2) Yes § 63.6(f)(3) Yes § 63.6(g) Yes § 63.6(h) No Subpart HHH does not contain opacity or visible emission standards. § 63.6(i)(1)-(i)(14) Yes § 63.6(i)(15) No Section reserved. § 63.6(i)(16) Yes § 63.6(j) Yes § 63.7(a)(1) Yes § 63.7(a)(2) Yes But the performance test results must be submitted within 180 days after the compliance date. § 63.7(a)(3) Yes § 63.7(b) Yes § 63.7(c) Yes § 63.7(d) Yes § 63.7(e)(1) Yes § 63.7(e)(2) Yes § 63.7(e)(3) Yes § 63.7(e)(4) Yes § 63.7(f) Yes § 63.7(g) Yes § 63.7(h) Yes § 63.8(a)(1) Yes § 63.8(a)(2) Yes § 63.8(a)(3) No Section reserved. § 63.8(a)(4) Yes § 63.8(b)(1) Yes § 63.8(b)(2) Yes § 63.8(b)(3) Yes § 63.8(c)(1) Yes § 63.8(c)(2) Yes § 63.8(c)(3) Yes § 63.8(c)(4) No § 63.8(c)(5) through (c)(8) Yes § 63.8(d) Yes § 63.8(e) Yes Subpart HHH does not specifically require continuous emissions monitor performance evaluations, however, the Administrator can request that one be conducted. § 63.8(f)(1) through (f)(5) Yes § 63.8(f)(6) No Subpart HHH does not require continuous emissions monitoring. § 63.8(g) No Subpart HHH specifies continuous monitoring system data reduction requirements. § 63.9(a) Yes § 63.9(b)(1) Yes § 63.9(b)(2) Yes Existing sources are given 1 year (rather than 120 days) to submit this notification. § 63.9(b)(3) Yes § 63.9(b)(4) Yes § 63.9(b)(5) Yes § 63.9(c) Yes § 63.9(d) Yes § 63.9(e) Yes § 63.9(f) No § 63.9(g) Yes § 63.9(h)(1) through (h)(3) Yes § 63.9(h)(4) No Section reserved. § 63.9(h)(5) and (h)(6) Yes § 63.9(i) Yes § 63.9(j) Yes § 63.10(a) Yes § 63.10(b)(1) Yes Section 63.1284(b)(1) requires sources to maintain the most recent 12 months of data on site and allows offsite storage for the remaining 4 years of data. § 63.10(b)(2) Yes § 63.10(b)(3) No § 63.10(c)(1) Yes § 63.10(c)(2) through (c)(4) No Sections reserved. § 63.10(c)(5) through (c)(8) Yes § 63.10(c)(9) No Section reserved. § 63.10(c)(10) through (c)(15) Yes § 63.10(d)(1) Yes § 63.10(d)(2) Yes § 63.10(d)(3) Yes § 63.10(d)(4) Yes § 63.10(d)(5) Yes Subpart HHH requires major sources to submit a startup, shutdown and malfunction report semi-annually. § 63.10(e)(1) Yes § 63.10(e)(2) Yes § 63.10(e)(3)(i) Yes Subpart HHH requires major sources to submit Periodic Reports semi-annually. § 63.10(e)(3)(i)(A) Yes § 63.10(e)(3)(i)(B) Yes § 63.10(e)(3)(i)(C) No Subpart HHH does not require quarterly reporting for excess emissions. § 63.10(e)(3)(ii) through (e)(3)(viii) Yes § 63.10(f) Yes § 63.11(a) and (b) Yes § 63.12(a) through (c) Yes § 63.13(a) through (c) Yes § 63.14(a) and (b) Yes § 63.15(a) and (b) Yes