Code of Federal Regulations (Last Updated: November 8, 2024) |
Title 40 - Protection of Environment |
Chapter I - Environmental Protection Agency |
SubChapter C - Air Programs |
Part 63 - National Emission Standards for Hazardous Air Pollutants for Source Categories |
Subpart PPPPP - National Emission Standards for Hazardous Air Pollutants for Engine Test Cells/Stands |
Table 7 to Subpart PPPPP of Part 63 - Applicability of General Provisions to Subpart PPPPP
Latest version.
-
Table 7 to Subpart PPPPP of Part 63 - Applicability of General Provisions to Subpart PPPPP
As stated in 63.9365, you must comply with the General Provisions in §§ 63.1 through 63.15 that apply to you according to the following table:
Citation Subject Applicable to subpart PPPPP Explanation § 63.1(a)(1)-(12) General Applicability Yes § 63.1(b)(1)-(3) Initial Applicability Determination Yes Applicability to subpart PPPPP is also specified in § 63.9285. § 63.1(c)(1) Applicability After Standard Established Yes § 63.1(c)(2) Applicability of Permit Program for Area Sources No Area sources are not subject to subpart PPPPP. § 63.1(c)(5) Notifications Yes § 63.1(c)(6) Applicability Reclassification Yes. § 63.1(d) [Reserved] § 63.1(e) Applicability of Permit Program Before Relevant Standard is Set Yes § 63.2 Definitions Yes Additional definitions are specified in § 63.9375. § 63.3 Units and Abbreviations Yes § 63.4 Prohibited Activities and Circumvention Yes § 63.5(a) Construction/Reconstruction Yes § 63.5(b) Requirements for Existing, Newly Constructed, and Reconstructed Sources Yes § 63.5(d) Application for Approval of Construction/Reconstruction Yes § 63.5(e) Approval of Construction/Reconstruction Yes § 63.5(f) Approval of Construction/Reconstruction based on Prior State Review Yes § 63.6(a) Compliance With Standards and Maintenance Requirements-Applicability Yes § 63.6(b)(1)-(7) Compliance Dates for New and Reconstructed Sources Yes § 63.9295 specifies the compliance dates. § 63.6(c)(1)-(2) Compliance Dates for Existing Sources No Subpart PPPPP does not establish standards for existing sources. § 63.6(c)(5) Compliance Dates for Existing Sources Yes § 63.9295(b) specifies the compliance date if a new or reconstructed area source becomes a major source. § 63.6(e)(1)(i) Operation and Maintenance Yes before December 1, 2020. No on and after December 1, 2020 See § 63.9305 for general duty requirement. § 63.6(e)(1)(ii) Operation and Maintenance Yes before December 1, 2020. No on and after December 1, 2020 § 63.6(e)(1)(iii) Operation and Maintenance Yes § 63.6(e)(3) SSM Plan Yes before December 1, 2020. No on and after December 1, 2020 § 63.6(f)(1) Compliance Except During SSM Yes before December 1, 2020. No on and after December 1, 2020 § 63.6(f)(2)-(3) Methods for Determining Compliance Yes § 63.6(g)(1)-(3) Use of Alternative Standards Yes § 63.6(h) Compliance With Opacity/Visible Emission Standards No Subpart PPPPP does not establish opacity standards and does require continuous opacity monitoring systems (COMS). § 63.6(i)(1)-(16) Extension of Compliance No Compliance extension provisions apply to existing sources which do not have emission limitations in subpart PPPPP. § 63.6(j) Presidential Compliance Exemption Yes § 63.7(a)(1)-(2) Performance Test Dates Yes § 63.7(a)(3) Performance Test Required By the Administrator Yes § 63.7(b)-(d) Performance Test Requirements-Notification, Quality Assurance, Facilities Necessary for Safe Testing, Conditions During Testing Yes § 63.7(e)(1) Conditions for Conducting Performance Tests Yes before December 1, 2020. No, see § 63.9321, on and after December 1, 2020 § 63.7(e)(2)-(4) Conduct of Performance Tests Yes § 63.7(f) Alternative Test Methods Yes § 63.7(g)-(h) Performance Testing Requirements-Data Analysis, Recordkeeping, Reporting, Waiver of Test Yes § 63.8(a)(1)-(2) Monitoring Requirements - Applicability Yes Subpart PPPPP contains specific requirement for monitoring at § 63.9325. § 63.8(a)(4) Additional Monitoring Requirements No Subpart PPPPP does not have monitoring requirement for flares. § 63.8(b) Conduct of Monitoring Yes § 63.8(c)(1) Continuous Monitoring System (CMS) Operation and Maintenance Yes § 63.8(c)(1)(i) General Duty to Minimize Emissions and CMS Operation Yes before December 1, 2020. No on and after December 1, 2020 § 63.8(c)(1)(ii) Operation and Maintenance of CMS Yes § 63.8(c)(1)(iii) Requirement to Develop SSM Plan for CMS Yes before December 1, 2020. No on and after December 1, 2020 § 63.8(c)(2)-(3) Monitoring System Installation Yes § 63.8(c)(4) CMS No § 63.9335(a) and (b) specifies the requirements. § 63.8(c)(5) COMS No Subpart PPPPP does not have opacity or VE standards. § 63.8(c)(6)-(8) CMS Requirements Yes Except that subpart PPPPP does not require COMS. § 63.8(d)(1)-(2) CMS Quality Control Yes § 63.8(d)(3) CMS Quality Control Yes before December 1, 2020. No on and after December 1, 2020 § 63.8(e) CMS Performance Yes Except for § 63.8(e)(5)(ii) which applies to COMS. § 63.8(f)(1)-(5) Alternative Monitoring Method Yes § 63.8(f)(6) Alternative to Relative Accuracy Test Yes § 63.8(g) Data Reduction Yes before December 1, 2020. No on and after December 1, 2020 §§ 63.9335 and 63.9340 specify monitoring data reduction. § 63.9(a)-(b) Notification Requirements Yes § 63.9(c) Request for Compliance Extension No Compliance extension to not apply to new or reconstructed sources. § 63.9(d) Notification of Special Compliance Requirements for New Sources Yes § 63.9(e) Notification of Performance Test No Subpart PPPPP does not require performance testing. § 63.9(f) Notification of Opacity/VE test No Subpart PPPPP does not have opacity/VE standards. § 63.9(g)(1) Additional Notifications When Using CMS Yes § 63.9(g)(2) Additional Notifications When Using CMS No Subpart PPPPP does not have opacity/VE standards. § 63.9(g)(3) Additional Notifications When Using CMS Yes § 63.9(h) Notification of Compliance Status Yes § 63.9(i) Adjustment of Submittal Deadlines Yes § 63.9(j) Change in Previous Information Yes § 63.9(k) Notifications Electronic reporting procedures Yes, only as specified in § 63.9(j). § 63.10(a) Recordkeeping/Reporting Yes § 63.10(b)(1) General Recordkeeping Requirements Yes § 63.10(b)(2)(i) Recordkeeping of Occurrence and Duration of Startups and Shutdowns Yes before December 1, 2020. No on and after December 1, 2020 § 63.10(b)(2)(ii) Recordkeeping of Occurrence and Duration of Malfunctions Yes before December 1, 2020. No on and after December 1, 2020 See § 63.9355 for recordkeeping of (1) date, time, and duration; (2) listing of affected source or equipment, and an estimate of the quantity of each regulated pollutant emitted over the standard; and (3) actions to minimize emissions and correct the failure. § 63.10(b)(2)(iii) Recordkeeping of Maintenance on Controls and Monitoring Equipment Yes § 63.10(b)(2)(iv)-(v) Actions Taken to Minimize Emissions During SSM Yes before December 1, 2020. No on and after December 1, 2020 § 63.10(b)(2)(vi)-(xi) CMS Records Yes § 63.10(b)(2)(xii) Records Yes § 63.10(b)(2)(xiii) Records Yes § 63.10(b)(2)(xiv) Records Yes § 63.10(b)(3) Recordkeeping for Applicability Determinations Yes § 63.10(c)(1)-(6), (9)-(14) Additional Recordkeeping for CMS Yes § 63.10(c)(7)-(8) Records of Excess Emissions and Parameter Monitoring Exceedances for CMS No Specific language is located at § 63.9355 of subpart PPPPP. § 63.10(c)(15) Records Regarding the SSM Plan Yes before December 1, 2020. No on and after December 1, 2020 § 63.10(d)(1) General Reporting Requirements Yes § 63.10(d)(2) Report of Performance Test Results Yes § 63.10(d)(3) Reporting of Opacity or VE Observations No Subpart PPPPP does not have opacity/VE standards. § 63.10(d)(4) Progress Reports for Sources with Compliance Extensions No Compliance extensions do not apply to new or reconstructed sources. § 63.10(d)(5) SSM Reports Yes before December 1, 2020. No on and after December 1, 2020 On and after December 1, 2020, see § 63.9350 for malfunction reporting requirements. § 63.10(e)(1) and (2)(i) Additional CMS Reports Yes § 63.10(e)(2)(ii) Additional CMS Reports No Subpart PPPPP does not require COMS. § 63.10(e)(3) Excess Emissions/CMS Performance Reports No Specific language in located in § 63.9350 of subpart PPPPP. § 63.10(e)(4) COMS Data Reports No Subpart PPPPP does not require COMS. § 63.10(f) Waiver for Recordkeeping/Reporting Yes § 63.11 Control Device Requirements/Flares No Subpart PPPPP does not specify use of flares for compliance. § 63.12 State Authority and Delegations Yes § 63.13 Addresses Yes § 63.14 Incorporation by Reference Yes ASTM D 6522-00 and ANSI/ASME PTC 19.10-1981 (incorporated by reference - See § 63.14). § 63.15 Availability of Information/Confidentiality Yes [85 FR 34349, June 3, 2020, as amended at 85 FR 73917, Nov. 19, 2020]