Code of Federal Regulations (Last Updated: November 8, 2024) |
Title 40 - Protection of Environment |
Chapter I—Environmental Protection Agency |
SubChapter C—Air Programs |
Part 63 - National Emission Standards for Hazardous Air Pollutants for Source Categories |
Subpart QQQ - National Emission Standards for Hazardous Air Pollutants for Primary Copper Smelting |
Table 1 to Subpart QQQ of Part 63 - —Applicability of General Provisions to This Subpart
Latest version.
-
Table 1 to Subpart QQQ of Part 63—Applicability of General Provisions to This Subpart QQQ
As required in § 63.1457, you must comply with the requirements of the NESHAP General Provisions (40 CFR part 63, subpart A of this part) shown in the following table:
Citation Subject Applies to this subpart QQQ Explanation § 63.1 Applicability Yes § 63.2 Definitions Yes § 63.3 Units and Abbreviations Yes § 63.4 Prohibited Activities Yes § 63.5 Construction and Reconstruction Yes § 63.6(a) -(through (d), (e)(iii), and (f)(2) and (3), (g) Compliance with Standards and Maintenance Requirements Yes § 63.6(e)(1)(i) Operation and Maintenance Requirements Yes before November 12, 2024. No on or after November 12, 2024 General duty requirements to minimize emissions at all times are contained in § 63.1447(a). § 63.6(e)(1)(ii) Requirement to correct malfunctions as soon as practicable Yes before November 12, 2024. No on or after November 12, 2024 Malfunctions are no longer exempt. § 63.6(e)(2) Reserved No § 63.6(e)(3) Requirement to develop a startup, shutdown, and malfunction plan Yes before November 12, 2024. No on or after November 12, 2024 Startup, shutdown, and malfunction (SSM) plans are no longer necessary. § 63.6(f)(1) Compliance with nonopacity emission standards during periods of startup, shutdown, and malfunction Yes before November 12, 2024. No on or after November 12, 2024 Source category rules apply at all times. § 63.6(h) Determining compliance with Opacity and VE standards No Subpart QQQ This subpart specifies the requirements and test protocol used to determine compliance with the opacity limits. § 63.6(i) -and (j) Extension of Compliance and Presidential Compliance Exemption Yes § 63.7(a)(1) -and (2) Applicability and Performance Test Dates No Subpart QQQ This subpart specifies performance test applicability and dates. § 63.7(a)(3), (b) -(through (d), (f) through (h) Performance Testing Requirements Yes § 63.7(e)(1) Performance Testing Yes before November 12, 2024. No on or after November 12, 2024 See §§ 63.1450 and 63.1444. § 63.8 except for (a)(4), (c)(1)(i) and (iii), (c)(4), (d)(3), and (f)(6) Monitoring Requirements Yes § 63.8(a)(4) Additional Monitoring Requirements for Control devices in § 63.11 No Subpart QQ This subpart does not require flares. § 63.8(c)(1)(i) and (iii) Operation and Maintenance of and SSM plan for Continuous Monitoring Systems Yes before November 12, 2024. No on or after November 12, 2024 Cross references to the general duty and SSM plan requirements in those paragraphs are no longer necessary. § 63.8(c)(4) Continuous Monitoring System Requirements No Subpart QQQ This subpart specifies requirements for operation of CMS. § 63.8(d)(3) Quality Control Program Yes before November 12, 2024. No on or after November 12, 2024 See § 63.1456(a)(4)(iii). § 63.8(f)(6) RATA Alternative No Subpart QQQ This subpart does not require continuous emission monitoring systems. § 63.9 Notification Requirements Yes § 63.9(g)(5) DATA reduction No Subpart QQQ This subpart specifies data reduction requirements. § 63.10 except for (b)(2)(xiii) and (i), (ii), (iv), (v), and (xiii), (c)(7)-, (8), and (15), and (d)(5) Recordkeeping and reporting Requirements Yes § 63.10(b)(2)(i) General Recordkeeping Requirements during Startup and Shutdown Yes before November 12, 2024. No on or after November 12, 2024 No longer necessary because recordkeeping and reporting applicable to normal operations will apply to startup and shutdown. § 63.10(b)(2)(ii) General Recordkeeping Requirements during Startup, Shutdown, and Malfunction and Failures to Meet Standards Yes before November 12, 2024. No on or after November 12, 2024 See § 63.1456(a)(4)(iv) for recordkeeping requirements for a deviation from a standard. § 63.10(b)(2)(iv) Actions Taken to Minimize Emissions during Startup, Shutdown, and Malfunction Yes before November 12, 2024. No on or after November 12, 2024 See § 63.1456 for the recordkeeping requirements of actions taken to minimize emissions and record corrective actions. § 63.10(b)(2)(v) Actions Taken to Minimize Emissions during Startup, Shutdown, and Malfunction Yes before November 12, 2024. No on or after November 12, 2024 Requirements to document that actions taken during SSM events are consistent with SSM plan are no longer required. § 63.10(b)(2)(xiii) CMS Records for RATA Alternative No Subpart QQQ This subpart does not require continuous emission monitoring systems. § 63.10(c)(7)-(8) Records of Excess Emissions and Parameter Monitoring Accedences Exceedances for CMS No Subpart QQQ This subpart specifies record keeping requirements. § 63.10(c)(15) Use of SSM Plan Yes before November 12, 2024. No on or after November 12, 2024 This provision would be eliminated because it referenced the source's SSM plan, which is no longer required. § 63.10(d)(5) SSM Reporting and Recordkeeping Requirements Yes before November 12, 2024. No on or after November 12, 2024 See §§ 63.1455(c)(4) and 63.1456. § 63.11 Control Device Requirements No Subpart QQQ This subpart does not require flares. § 63.12 State Authority and Delegations Yes §§ 63.13 -through 63.1516 Addresses, Incorporation by Reference, Availability of Information, Performance Track Provisions Yes