Table 1 to Subpart VVV of Part 63 - Applicability of 40 CFR Part 63 General Provisions to Subpart VVV  


Latest version.
  • Table 1 to Subpart VVV of Part 63 - Applicability of 40 CFR Part 63 General Provisions to Subpart VVV

    General provisions reference Applicable to subpart VVV Explanation
    § 63.1 Applicability.
    § 63.1(a)(1) Yes Terms defined in the Clean Air Act.
    § 63.1(a)(2) Yes General applicability explanation.
    § 63.1(a)(3) Yes Cannot diminish a stricter NESHAP.
    § 63.1(a)(4) Yes Not repetitive. Doesn't apply to section 112(r).
    § 63.1(a)(5) Yes Section reserved.
    § 63.1(a)(6)-(8) Yes Contacts and authorities.
    § 63.1(a)(9) Yes Section reserved.
    § 63.1(a)(10) Yes Time period definition.
    § 63.1(a)(11) Yes Postmark explanation.
    § 63.1(a)(12)-(14) Yes Time period changes. Regulation conflict. Force and effect of subpart A.
    § 63.1(b)(1) Yes Initial applicability determination of subpart A.
    § 63.1(b)(2) Yes Section reserved.
    § 63.1(b)(3) No Subpart VVV specifies recordkeeping of records of applicability determination.
    § 63.1(c)(1) Yes Requires compliance with both subparts A and subpart VVV.
    § 63.1(c)(2)(i) No State options regarding title V permit. Unless required by the State, area sources subject to subpart VVV are exempted from permitting requirements.
    § 63.1(c)(2)(ii)-(iii) No State options regarding title V permit.
    § 63.1(c)(3) Yes Section reserved.
    § 63.1(c)(4) Yes Extension of compliance.
    § 63.1(c)(5) No Subpart VVV addresses area sources becoming major due to increase in emissions.
    § 63.1(c)(6) Yes
    § 63.1(d) Yes Section reserved.
    § 63.1(e) Yes Title V permit before a relevant standard is established.
    § 63.2 Yes Definitions.
    § 63.3 Yes Units and abbreviations.
    § 63.4 Prohibited activities and circumvention.
    § 63.4(a)(1)-(3) Yes Prohibits operation in violation of subpart A.
    § 63.4(a)(4) Yes Section reserved.
    § 63.4(a)(5) Yes Compliance dates.
    § 63.4(b) Yes Circumvention.
    § 63.4(c) Yes Severability.
    § 63.5 Preconstruction review and notification requirements.
    § 63.5(a)(1) Yes Construction and reconstruction.
    § 63.5(a)(2) Yes New source - effective dates.
    § 63.5(b)(1) Yes New sources subject to relevant standards.
    § 63.5(b)(2) Yes Section reserved.
    § 63.5(b)(3) Yes No new major sources without Administrator approval.
    § 63.5(b)(4) Yes New major source notification.
    § 63.5(b)(5) Yes New major sources must comply.
    § 63.5(b)(6) Yes New equipment added considered part of major source.
    § 63.5(c) Yes Section reserved.
    § 63.5(d)(1) Yes Implementation of section 112(I)(2) - application of approval of new source construction.
    § 63.5(d)(2) Yes Application for approval of construction for new sources listing and describing planned air pollution control system.
    § 63.5(d)(3) Yes Application for reconstruction.
    § 63.5(d)(4) Yes Administrator may request additional information.
    § 63.5(e) Yes Approval of reconstruction.
    § 63.5(f)(1) Yes Approval based on State review.
    § 63.5(f)(2) Yes Application deadline.
    § 63.6 Compliance with standards and maintenance requirements.
    § 63.6(a) Yes Applicability of compliance with standards and maintenance requirements.
    § 63.6(b) Yes Compliance dates for new and reconstructed sources.
    § 63.6(c) Yes Compliance dates for existing sources apply to existing Group 1 POTW treatment plants.
    § 63.6(d) Yes Section reserved.
    § 63.6(e) Yes, except as noted below Operation and maintenance requirements apply to new sources.
    § 63.6(e)(1)(i) No General duty; See § 63.1583(d) and § 63.1586(d) for general duty requirements.
    § 63.6(e)(1)(ii) No Requirement to correct malfunctions.
    § 63.6(e)(3) No SSM plans are not required for POTW.
    § 63.6(f) Yes, except as noted below Compliance with non-opacity emission standards applies to new sources.
    § 63.6(f)(1) No The POTW standards apply at all times.
    § 63.6(g) Yes Use of alternative non-opacity emission standards applies to new sources.
    § 63.6(h) No POTW treatment plants do not typically have visible emissions.
    § 63.6(i) Yes Extension of compliance with emission standards applies to new sources.
    § 63.6(j) Yes Presidential exemption from compliance with emission standards.
    § 63.7 Performance testing requirements.
    § 63.7(a) Yes Performance testing is required for new sources.
    § 63.7(b) Yes New sources must notify the Administrator of intention to conduct performance testing.
    § 63.7(c) Yes New sources must comply with quality assurance program requirements.
    § 63.7(d) Yes New sources must provide performance testing facilities at the request of the Administrator.
    § 63.7(e) Yes, except as noted below Requirements for conducting performance tests apply to new sources.
    § 63.7(e)(1) No The performance testing provisions of § 63.694 for control devices are incorporated by reference into subpart DD of this part.
    § 63.7(f) Yes New sources may use an alternative test method.
    § 63.7(g) Yes Requirements for data analysis, recordkeeping, and reporting associated with performance testing apply to new sources.
    § 63.7(h) Yes New sources may request a waiver of performance tests.
    § 63.8 Monitoring requirements.
    § 63.8(a) Yes Applicability of monitoring requirements.
    § 63.8(b) Yes Monitoring shall be conducted by new sources.
    § 63.8(c) Yes, except as noted below New sources shall operate and maintain continuous monitoring systems (CMS).
    § 63.8(c)(1)(i) No See § 63.1583(d) for general duty requirement with respect to minimizing emissions and continuous monitoring requirements.
    § 63.8(c)(1)(iii) No See the applicable CMS quality control requirements under § 63.8(c) and (d).
    § 63.8(d) Yes, except as noted below New sources must develop and implement a CMS quality control program.
    § 63.8(d)(3) No The owner or operator must keep these written procedures on record for the life of the affected source or until the affected source is no longer subject to the provisions of this part, and make them available for inspection, upon request, by the Administrator. If the performance evaluation plan is revised, the owner or operator must keep previous (i.e., superseded) versions of the performance evaluation plan on record to be made available for inspection, upon request, by the Administrator, for a period of 5 years after each revision of the plan. The program of corrective action should be included in the plan required under § 63.8(d)(2).
    § 63.8(e) Yes New sources may be required to conduct a performance evaluation of CMS.
    § 63.8(f) Yes New sources may use an alternative monitoring method.
    § 63.8(g) Yes Requirements for reduction of monitoring data.
    § 63.9 Notification requirements.
    § 63.9(a) Yes Applicability of notification requirements.
    § 63.9(b) Yes, except as noted below Initial notification due February 23, 2000 or 60 days after becoming subject to this subpart.
    § 63.9(c) Yes Request for extension of compliance with subpart VVV.
    § 63.9(d) Yes Notification that source is subject to special compliance requirements as specified in § 63.6(b)(3) and (4).
    § 63.9(e) Yes Notification of performance test.
    § 63.9(f) No POTW treatment plants do not typically have visible emissions.
    § 63.9(g) Yes Additional notification requirements for sources with continuous emission monitoring systems.
    § 63.9(h) Yes, except as noted Notification of compliance status when the source becomes subject to subpart VVV. See exceptions in § 63.1591(b).
    § 63.9(i) Yes Adjustments to time periods or postmark deadlines or submittal and review of required communications.
    § 63.9(j) Yes Change of information already provided to the Administrator.
    § 63.9(k) Yes Only as specified in § 63.9(j).
    § 63.10 Recordkeeping and reporting requirements.
    § 63.10(a) Yes Applicability of notification and reporting requirements.
    § 63.10(b)(1)-(2) Yes, except as noted below General recordkeeping requirements.
    § 63.10(b)(2)(i) No Recordkeeping for occurrence and duration of startup and shutdown.
    § 63.10(b)(2)(ii) No Recordkeeping for failure to meet a standard, see § 63.696.
    § 63.10(b)(2)(iii) Yes Maintenance records.
    § 63.10(b)(2)(iv) No Actions taken to minimize emissions during SSM.
    § 63.10(b)(2)(v) No Action taken to minimize emissions during SSM.
    § 63.10(b)(2)(vi) Yes Recordkeeping for CMS malfunctions.
    § 63.10(b)(2)(vii)-(ix) Yes Other CMS requirements.
    § 63.10(b)(3) No Recording requirement for applicability determination.
    § 63.10(c) Yes, except as noted below Additional recordkeeping requirements for sources with continuous monitoring systems.
    § 63.10(c)(7) No See § 63.696(h) for recordkeeping of (1) date, time, and duration; (2) listing of affected source or equipment, and an estimate of the tons per year of each regulated pollutant emitted over the standard; and (3) actions to minimize emissions and correct the failure.
    § 63.10(c)(8) No See § 63.696(h) for recordkeeping of (1) date, time, and duration; (2) listing of affected source or equipment, and an estimate of the tons per year of each regulated pollutant emitted over the standard; and (3) actions to minimize emissions and correct the failure.
    § 63.10(c)(15) No Use of SSM plan.
    § 63.10(d) Yes, except as noted below General reporting requirements.
    § 63.10(d)(5) No See § 63.697(b) for malfunction reporting requirements.
    § 63.10(e) Yes Additional reporting requirements for sources with continuous monitoring systems.
    § 63.10(f) Yes, except as noted Waiver of recordkeeping and reporting requirements. Electronic reporting to the EPA cannot be waived.
    § 63.11 Yes Control device and equipment leak work practice requirements.
    § 63.11(a) and (b) Yes If a new source uses flares to comply with the requirements of subpart VVV, the requirements of § 63.11 apply.
    § 63.11(c), (d) and (e) Yes Alternative work practice for equipment leaks.
    § 63.12 Yes State authority and designation.
    § 63.13 Yes Addresses of State air pollution control agencies and EPA Regional Offices.
    § 63.14 Yes Incorporation by reference.
    § 63.15 Yes Availability of information and confidentiality.

    [82 FR 49525, Oct. 26, 2017, as amended at 85 FR 73902, Nov. 19, 2020]